QTS: Project Marvel
The Bessemer City Council has officially cleared the way for "Project Marvel," a massive 1,600-acre data center campus proposed by Logistic Land Investments LLC.
QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.
QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.
The Bessemer City Council has officially cleared the way for "Project Marvel," a massive 1,600-acre data center campus proposed by Logistic Land Investments LLC.
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
QTS Richmond 4 (RIC4) Campus is a major data center expansion project by QTS, in eastern Henrico County (Sandston, VA), within the White Oak Technology Park area.
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
Hillsboro 2 DC2 is the second of four buildings on QTS's Hillsboro 2 campus, at 4425 NE Huffman St in Hillsboro, Oregon.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS data centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
QTS is planning a $10 billion, 1,300-acre hyperscale data center campus in Clinton, Iowa.
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
QTS is developing a 413,726-square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
QTS is developing a 363,500 square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
QTS is developing a 363,500 square-foot data center in a two-story building, featuring office and shell data hall space, in Fort Worth.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
QTS massive data center in Richmon sits on 110 acres with an additional 100 acres available for future development. There are 3 building on the campus with a total potential floor space of 550,000 square feet
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
QTS Data Centers is developing a nine-building hyperscale campus on roughly 400 acres near Hands Mill Highway and Campbell Road in the Clover area of York County, north of Rock Hill and just south of Lake Wylie.
QTS's Forth Worth site is the company's second data center in Dallas Market.
The proposed expansion in East Windsor involves a $600 million investment by QTS Data Centers to build a second, state-of-the-art facility on its existing Princeton-Hightstown Road campus.
The QTS Data Center in Colorado Springs encompasses a 249,958-square-foot facility situated on a 21-acre site
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
QTS is developing a ten-building data center campus in the north of England. The development is expected to be completed by 2035
QTS is set to develop a new data center near Madison, Wisconsin, with plans for up to 15 buildings. The initial phase will include three to five buildings, each requiring an investment of $300-500 million.
Carrier-Neutral OperatorInterested in this information?Contact us has acquired 1,700 acres in Salem Township, Pennsylvania, for a data center and AI infrastructure campus.
QTS is expanding its Fort Worth data center campus for the third time with a $300 million, 147,946-square-foot addition at 14100 Park Vista Boulevard.
QTS is expanding its DFW2 data center campus through the construction of two additional buildings in Wilmer, Dallas County.
The Texas Department of Licensing and Regulation (TDLR) received two applications from QTS for data center developments in Wilmer, Dallas County.
This facility is part of QTS Kearneysville Campus in West Virginia.
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
The company has leased a substantial 756,000 square foot (70,234 sqm) facility, identified as Building B1, within the New Century Commerce Center (NCCC) in New Century, Kansas.
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
QTS is exploring opportunities to establish new data center campuses in Blakely, Georgia.
QTS is building a new data center campus outside Dallas, Texas. The company aims to develop a two-story, 413,725 sq ft (38,436 sqm) building in the Lancaster area of Dallas County.
QTS Data Centers, in partnership with Lancium, is investing $10 billion to develop a new project at Lancium's Clean Campus in Hall County, Texas, near the city of Turkey.
QTS Data Centers has officially withdrawn its proposal for a massive expansion plan near Madison, Wisconsin, effectively canceling the development of a new data center campus in the Village of DeForest.
The QTS Kearneysville data center campus is slated for a 300-acre property strategically split between Berkeley and Jefferson Counties in West Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
Small carrier-neutral colocation facility in south Wichita serving regional enterprise and aerospace customers. Hardened concrete block and brick construction with 9,400 sq ft of data center footprint and 2,600 sq ft of raised floor.
QTS is expanding its South Dallas campus with DC7, a new two-story data center building planned near Wilmer in southern Dallas County.
QTS is developing a 612-acre data center campus along 76th Avenue SW within the Big Cedar Industrial Center.
QTS’s proposed Project Blue Hole campus in Blakely, Georgia, is an early-stage hyperscale development off Martha Berry Highway that could reach 12 million sq ft across nine buildings with three substations, targeting full buildout by 2035
Augusta 2 is the second of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
QTS Suwanee 1 DC1 is a 385,000 sq. ft. data center and office building at 300 Satellite Blvd NW, the first of two buildings on the QTS Suwanee 1 campus in the north suburbs of Atlanta.
QTS Suwanee 1 DC2 is a 376,900 sq. ft. former Hewlett-Packard data center at 120 Satellite Blvd NW that QTS bought from DXC Technology in November 2022.
PHX2 DC1 is the first of five data center buildings on the QTS Phoenix 2 campus, at 1200 N 40th Street in east Phoenix, Arizona.
PHX2 DC4 is the fourth of five data center buildings on the QTS Phoenix 2 campus, at 1450 N 40th Street in east Phoenix, Arizona.
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
PHX3 DC1 is the first of 16 planned buildings on QTS's Phoenix 3 campus in Glendale, Arizona, at 17408 W Camelback Rd (Litchfield Park mailing address).
Glendale Expansion carries the later buildings of QTS's planned 16-building Phoenix 3 campus in Glendale, Arizona, beyond PHX3 DC1.
Augusta 1 is the first of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower. QTS expects to complete it in spring 2028.
Augusta 5 is the fifth of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
Suwanee 1 Expansion holds the future capacity QTS plans for its Suwanee 1 campus in Suwanee, Georgia, beyond the two existing buildings.
Calatorao 1 is the first building of QTS's planned Proyecto Rhodes campus beside the A-2 motorway at Calatorao, Zaragoza province, Spain.
Calatorao Expansion carries the later buildings of QTS's planned Proyecto Rhodes campus at Calatorao, Zaragoza province, Spain.
Hillsboro 3 DC1 is the first of two planned buildings on QTS's Hillsboro 3 campus, at 6220 NE Pubols St in north Hillsboro, Oregon.
Hillsboro 3 DC2 is the second of two planned buildings on QTS's Hillsboro 3 campus, at 6185 NE Schaaf St in north Hillsboro, Oregon.
Hillsboro 1 DC1 is QTS's multi-tenant colocation data center at 4951 NE Huffman St in Hillsboro, Oregon, opened in October 2020.
A massive 970,000 sqft data center is one of the largest in the world.
Fayetteville East Expansion (ATL2 East) is QTS's planned 313-acre, 2-million-sq-ft expansion of its Fayetteville campus west of Veterans Parkway in Fayetteville, Georgia.
PHX2 DC2 is the second of five data center buildings on the QTS Phoenix 2 campus, at 1250 N 40th Street in east Phoenix, Arizona.
QTS is expanding its data center campus in Princeton, New Jersey. The first phase of the project was topped off in November, 2024.
Located in the Green Data Port of Eemshaven, home to the largest wind park on Dutch soil.
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
Piscataway 1 DC2 is the two-story expansion building on the QTS Piscataway 1 campus at 101 Possumtown Road, Piscataway, New Jersey, completed in 2024.
QTS is building a huge data center campus in Fayetteville, Georgia. The site is located north of SR 54, east of Tyrone Road and Flat Creek Trail, and west of Veterans Parkway.
QTS' San Antonio campus, located at 8535 Potranco Road, sits approximately eight miles east of the new plot.
QTS plans to construct a total of five, two-story, 360,000-square-foot data centers, totaling 1.8 million square feet in Henrico County.
The 48-acre plot known as the "Omicron Subdivision" was subdivided into 3 plots and will be QTS's future expansion in San Antonio.
QTS acquired this site via the Carpathia acquisition in 2015.
Augusta 3 is the third of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
Augusta 6 is the last of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
Augusta 4 is the fourth of six planned two-story buildings on QTS's Augusta campus (Project Eisenhower) off Gordon Highway in Augusta, Georgia, adjacent to Fort Eisenhower.
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
PHX2 DC3 is the third of five data center buildings on the QTS Phoenix 2 campus, at 1400 N 40th Street in east Phoenix, Arizona.
The campus was a former Sun Times Press Facility and was acquired in 2014
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three stories, alongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
QTS plans to build another data center building on its Chicago Campus.
Hillsboro 2 DC1 is the first of four buildings on QTS's Hillsboro 2 campus, at 4755 NE Huffman St in Hillsboro, Oregon.
Hillsboro 2 DC5 is the fourth and westernmost building on QTS's Hillsboro 2 campus, at 4113 NE Huffman St in Hillsboro, Oregon.
PHX2 DC5 is the fifth data center building on the QTS Phoenix 2 campus, at 1500 N 40th Street in east Phoenix, Arizona. QTS broke ground on it in 2023.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
This facility is part of QTS Data Center's Richmond II Campus in Virginia.
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
QTS has been named as the end user/operator for the Van Wert Mega Site data center project in northwest Ohio.
QTS Data Center Holdings is eyeing a massive three-building campus in Vimercate, located just 25 kilometers north of Milan.
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
Hillsboro 2 DC3 is the third of four buildings on QTS's Hillsboro 2 campus, at 4327 NE Huffman St in Hillsboro, Oregon.
QTS has expanded its Richmond I campus on Portugee Road with three two-story, 155,175-square-foot data center buildings, totaling 465,525 square feet of space, and this building is one of them.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site. The company said that it planned to build up to 1.5 million square feet (140,000 sq m) of additional capacity.
This facility is part of QTS Data Center's Richmond II Campus in Virginia.
QTS Realty Trust is continuing its data center expansion at its Richmond Mega Data Center campus in Henrico after acquiring another 200 acres at the site.
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
This facility is part of the QTS Richmond IV Campus in Virginia.
QTS acquired this site via the Carpathia acquisition in 2015
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
The site is also known as the Blue Ridge Data Center when it was owned by Carpathia.
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
Piscataway 1 DC1 is the original 360,000 sq ft data center on the QTS Piscataway 1 campus at 101 Possumtown Road, Piscataway, New Jersey, acquired from DuPont Fabros in June 2016.
The campus, also known as QTS Aurora, on 80 acres, will consist of four buildings and is projected to ramp up to capacity over 10 years.
The QTS Miami data center rated to survive a category 5 hurricane, is above the 500-year flood level, and also has 3,000 sq. ft. of office space
Located less than 90 miles from San Francisco, this facility offers 46,000 sq. ft. of raised floor space and 9.0 megawatts (MW) of power capacity in seismically-neutral Sacramento.
QTS plans to construct a total of five, two-story, 360,000-sqft data centers, totaling 1.8 million square feet in Henrico County.
Jan 05, 2026 Eric Bell Dallas