The Atlanta data center market is located in the state of Georgia within Americas. Atlanta has 246 facilities.
The top providers in Atlanta are Microsoft Azure (10 sites) and QTS Data Centers with 10 facilities . The most popular facilities are 56 Marietta Carrier Hotel - Digital Realty and QTS Atlanta Suwanee.
Read More
| Location | About | Total SqFt | Power (MW) |
|---|---|---|---|
| Metro RidgeInterested in this information?Contact us |
Microsoft's Fairwater 2 is a two-story AI data center near Atlanta that houses densely packed Nvi...
|
NN Request Dataset | NN Request Dataset |
| Edged Energy: ATL01-02 |
This facility is part of Edged Energy's three-building campus on Marietta Road in Atlanta.
|
NN Request Dataset | NN Request Dataset |
| QTS: Atlanta-1 DC1 |
A massive 970,000 sqft data center is one of the largest in the world.
|
NN Request Dataset | NN Request Dataset |
| QTS: Atlanta-1 DC2 | NN Request Dataset | NN Request Dataset | |
| QTS: Atlanta-1 DC4 |
QTS data centers' Project Granite is located on a 37.5-acre site at 1010 West Marietta St. NW.
|
NN Request Dataset | NN Request Dataset |
| Location | Building SqFt | Power (MW) | Estimated Launch |
|---|---|---|---|
| Equinix: AT10x | 210,610 SqFt | 60 Megawatts | |
| Equinix: AT12x | 210,610 SqFt | 60 Megawatts | |
| DC BLOX: ATL1-B | 250,000 SqFt | 40 Megawatts | |
| Equinix: AT11x | 210,610 SqFt | 60 Megawatts | |
| Equinix: AT13x | 210,610 SqFt | 60 Megawatts |
| Event | Type | Region | Date | Starts in | Details |
|---|---|---|---|---|---|
| Data Center |
Atlanta
Atlanta, GA
|
Dec 1 – 3 | 50 days | ||
|
Data Center
Tue, Dec 1 – 3
Atlanta, GA
Advancing Construction
|
|||||
| Data Center |
Atlanta
Atlanta, GA
|
Dec 1 – 3 | 50 days | ||
|
Data Center
Tue, Dec 1 – 3
Atlanta, GA
Advancing Construction
|
|||||
| Data Center |
Atlanta
Atlanta, GA
|
May 11 – 12, 2027 | 211 days | ||
|
Data Center
Tue, May 11 – 12, 2027
Atlanta, GA
Solar Energy Industries Association
|
|||||
No events match the selected types.
Atlanta is the Internet Hub of the Southeast
Atlanta is one of the top data center markets in the United States and is the hub of internet traffic in the South Eastern US.
56 Marietta Street is Atlanta’s carrier hotel. Digital Realty has been operating the carrier hotel since it was acquired from Telx in 2015. It has the largest Peering Exchange in the region, Digital Realty Atlanta IX (formerly TIE-Atlanta.) The 21-story office building across the street, 55 Marietta, offers a carrier dense alternative to 56 Marietta.
Wholesale Options:
For almost a decade QTS owned the wholesale data center market in Atlanta with their 970,000 sqft building. Then other providers entered the market. Digital Realty now has 5 buildings, T5 is building their 2nd building. Ascent acquired the former Blackberry facility and launched in 2018, H5, and Server Farm all have wholesale space. In addition, there announced builds (described below) that will open up the supply.
Atlanta Colocation Providers
Digital Realty (5 sites), Equinix (5 sites), Edgeconnex, Coloblox, and Sungard are the top providers in Atlanta.
Electrical:
Industrial power rates for data centers in Atlanta region are approximately $0.05/kWh, which is considerably less than the national average. Georgia Power Company (GPC), an investor-owned electric utility, provides service to Atlanta. Greystone Power, a member-owned local cooperative, provides service to the Atlanta suburbs.
Announced Data Center Builds:
Atlanta has been a historically underserved market. That’s changing with an overwhelming number of data center announcements.
Atlanta’s Data Center Clusters
Hazard Risk
There is little risk of natural disasters in Atlanta. The city is far enough from the Atlantic coast that a hurricane would result in some flooding. That said, a snowstorm can paralyze the city for a couple of days.
Incentives
Since 2005, the State of Georgia has offered 100% sales tax exemptions on software, hardware and construction for data centers with minimum investments of $15 million per year. In addition, corporate income tax is based on sales within the state, and does not consider capital investments and payroll attributed to data center operations.