EdgeCore Ashburn

Latest Podcast 45865 Maries Rd
Under Construction
New facility under construction
Operated by:

EdgeCore Ashburn

Short Code: AS01
Year Planned: 2026

EdgeCore has completed the topping out of a data center at 45865 Maries Road, less than a mile south of the Horseshoe site and adjacent to another CyrusOne facility to the east and two Digital Realty sites to the north. This Maries Road location will offer 348,000 sq ft of space.

Map and Nearby Locations

45865 Maries Rd
EdgeCore Internet Real Estate, LLC Sites
Nearby Facilities

EdgeCore Ashburn Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of EdgeCore Ashburn

Distance Site About
0.06 miles CyrusOne Sterling VIII
0.12 miles Centersquare: Sterling DC2
0.16 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
0.17 miles Hyperscale Data CenterInterested in this information?Contact us
0.22 miles Centersquare: Sterling DC4
0.23 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
0.25 miles Tower GammaInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
0.28 miles ThreeInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
0.28 miles CyrusOne Northern Virginia Sterling I, II, III
0.30 miles Station MaxInterested in this information?Contact us
0.30 miles Core CampusInterested in this information?Contact us
0.30 miles COPT: 45761 Maries Rd
0.38 miles SouthInterested in this information?Contact us
0.38 miles MetroInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
0.38 miles Campus BetaInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
0.38 miles COPT: 45771 Maries Rd
0.59 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
0.64 miles PointOne: Ashburn
The campus will have 2 buildings
0.76 miles Kyndryl: Sterling
0.78 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
0.88 miles EdgeInterested in this information?Contact us
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
1.00 miles StationInterested in this information?Contact us
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
1.01 miles Cloud ValleyInterested in this information?Contact us
1.07 miles Prime PlazaInterested in this information?Contact us
1.09 miles CyrusOne: NVA5
1.11 miles CenterInterested in this information?Contact us
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
1.11 miles Cloud PlazaInterested in this information?Contact us
1.11 miles Park ProInterested in this information?Contact us
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
1.12 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
1.14 miles DataCanopy: Sterling, VA
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
1.25 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
1.35 miles CentralInterested in this information?Contact us
1.37 miles 21641 Charles View
1.43 miles MetroInterested in this information?Contact us
1.43 miles 21710 Charles View
1.55 miles Corscale: Kincora
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
1.58 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
1.66 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
1.83 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
1.84 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
1.84 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
1.87 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
1.89 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
1.89 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
1.89 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
1.89 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
1.90 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
1.92 miles Point BetaInterested in this information?Contact us
1.92 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
1.94 miles Equinix DC15
1.95 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
1.98 miles PowerHouse ABX1
1.99 miles NorthInterested in this information?Contact us
2.00 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
2.00 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
2.04 miles Connect Data Centers: Sterling, VA
2.06 miles Equinix DC16
2.06 miles PowerHouse Pacific
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
2.06 miles ParkInterested in this information?Contact us
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
2.07 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
2.09 miles West CenterInterested in this information?Contact us
2.09 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
2.10 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
2.10 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
2.12 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
2.14 miles BetaInterested in this information?Contact us
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
2.14 miles ValleyInterested in this information?Contact us
2.14 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
2.16 miles South PointInterested in this information?Contact us
2.16 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
2.17 miles PowerHouse: Pacific Bldg B
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
2.19 miles Prime CenterInterested in this information?Contact us
2.19 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
2.19 miles Core TowerInterested in this information?Contact us
2.20 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
2.20 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
2.23 miles PowerHouse: Pacific Bldg C
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
2.24 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
2.25 miles Equinix DC21
2.25 miles Digital Realty: Broderick Drive
2.28 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
2.29 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
2.29 miles Core PlazaInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
2.33 miles Lumen Ashburn
2.34 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
2.34 miles NTT VA2
2.34 miles Station UltraInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
2.36 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
2.37 miles GammaInterested in this information?Contact us
2.38 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
2.41 miles EastInterested in this information?Contact us
2.41 miles Cloud RidgeInterested in this information?Contact us
2.42 miles Prime PointInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
2.43 miles Equinix Ashburn DC6
2.43 miles Equinix Ashburn DC11
2.45 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
2.45 miles 44490 Chilum (ACC2): Digital Realty
2.46 miles 44520 Hastings (ACC3) Digital Realty
2.47 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
2.47 miles Station UltraInterested in this information?Contact us
2.48 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
2.48 miles East StationInterested in this information?Contact us
2.48 miles Cloud CampusInterested in this information?Contact us
2.49 miles Digital Realty: IAD43
2.49 miles Equinix Ashburn DC1
2.50 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
2.51 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
2.51 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
2.52 miles 44470 Chillum - Digital Realty
2.52 miles Hub ProInterested in this information?Contact us
2.56 miles Equinix Ashburn DC5
2.57 miles 44751 Round Table (Bldg P)
2.59 miles Equinix Ashburn DC4
2.60 miles Edge HubInterested in this information?Contact us
2.60 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
2.60 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
2.62 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
2.62 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
2.64 miles CyrusOne Northern Virginia Sterling IV
2.64 miles 44521 Hastings (ACC5) Digital Realty
2.65 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
2.65 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
2.65 miles Rackspace Ashburn IAD3
2.66 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
2.68 miles Centersquare: IAD2-B
2.68 miles East ParkInterested in this information?Contact us
2.69 miles CloudHQ: LC1B
2.70 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
2.71 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
2.72 miles Global PointInterested in this information?Contact us
2.72 miles Tower BetaInterested in this information?Contact us
2.77 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
2.78 miles PointInterested in this information?Contact us
2.78 miles Park TwoInterested in this information?Contact us
2.78 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
2.79 miles North ValleyInterested in this information?Contact us
2.80 miles Campus GammaInterested in this information?Contact us
2.82 miles 21744 Sir Timothy Drive (ACC10)
2.83 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
2.83 miles South TowerInterested in this information?Contact us
2.85 miles 21745 Sir Timothy (ACC9) Digital Realty
2.85 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
2.85 miles Center UltraInterested in this information?Contact us
2.87 miles GlobalInterested in this information?Contact us
2.88 miles Stack: NVA04C
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
2.90 miles Hub PrimeInterested in this information?Contact us
2.90 miles Stack: NVA04B
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
2.92 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
2.92 miles Plaza GammaInterested in this information?Contact us
2.93 miles West RidgeInterested in this information?Contact us
2.94 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
2.95 miles Point UltraInterested in this information?Contact us
2.96 miles ParkInterested in this information?Contact us
2.96 miles Stack: NVA04A
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
3.01 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
3.02 miles 44274 Round Table (Bldg L)
3.11 miles 44372 Round Table: Digital Realty
3.12 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
3.13 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
3.14 miles NTT VA4
3.14 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
3.15 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
3.18 miles NTT VA5
3.20 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
3.21 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
3.24 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
3.25 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
3.27 miles NTT: VA9
3.30 miles NTT: VA8
3.30 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
3.32 miles Metro RidgeInterested in this information?Contact us
Amazon plans to build another data center in Loudoun County.
3.34 miles Equinix DC13
3.37 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
3.37 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
3.41 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
3.43 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
3.47 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
3.47 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
3.52 miles Center UltraInterested in this information?Contact us
3.56 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.56 miles Core RidgeInterested in this information?Contact us
3.56 miles 44351 Import Plz
3.57 miles Sabey Intergate: Ashburn Bldg-B
3.58 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
3.60 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.61 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.62 miles Prime RidgeInterested in this information?Contact us
3.64 miles DataBank Ashburn IAD3
3.64 miles FastServ Ashburn
3.65 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
3.65 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
3.67 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
3.67 miles Import Plz, Ashburn
3.68 miles 44100 Digital Loudoun Plaza (Bldg J)
3.69 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
3.73 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
3.74 miles 44060 Digital Loudoun Plaza (Bldg K)
3.77 miles 43780 Digital Loudoun Plaza (Bldg H)
3.78 miles WestInterested in this information?Contact us
3.86 miles 43940 Digital Loudoun Plaza (Bldg G)
3.86 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
3.87 miles 43915 Devin Shafron (Bldg A)
3.96 miles 43830 Devin Shafron (Bldg F)
3.96 miles Deft: DRT-IAD1
3.96 miles 43881 Devin Shafron (Bldg B)
4.01 miles 43790 Devin Shafron (Bldg E)
4.05 miles 43831 Devin Shafron (Bldg C)
4.12 miles 43791 Devin Shafron (Bldg D)
4.13 miles Valley AlphaInterested in this information?Contact us
4.23 miles Lumen Herndon 1
4.25 miles Lumen Herndon 3
4.33 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
4.46 miles Point PrimeInterested in this information?Contact us
Amazon completed its $427.3 million acquisition of GWU’s 122-acre Ashburn campus to build the Bridgefield Tech Center, featuring four two-story data centers totaling 800,000 square feet alongside three parking structures.
4.47 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
4.53 miles H5: Herndon
4.66 miles JK Land: Ashburn
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
4.82 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
4.99 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
5.14 miles Hyperscale Data CenterInterested in this information?Contact us
5.16 miles Hyperscale Data CenterInterested in this information?Contact us
5.21 miles Hyperscale Data CenterInterested in this information?Contact us
5.23 miles Hyperscale Data CenterInterested in this information?Contact us
5.53 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
5.53 miles CoreSite: VA2
5.59 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
5.59 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
5.78 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
5.84 miles BetaInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
5.85 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
5.88 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
5.90 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
5.94 miles South ValleyInterested in this information?Contact us
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
5.99 miles JK Land: Freedom Trail Rd
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
5.99 miles CyrusOne: Broadlands Expansion
6.01 miles Global CampusInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
6.03 miles East CampusInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
6.07 miles West ValleyInterested in this information?Contact us
6.13 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
6.13 miles OneInterested in this information?Contact us
6.24 miles Vantage: VA32
This facility is a part of Vantage's VA3 data center campus in Ashburn.
6.26 miles Belmont Innovation Campus
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
6.27 miles Vantage: VA35
This facility is a part of Vantage's VA3 data center campus in Ashburn.
6.27 miles Vantage: VA34
This facility is a part of Vantage's VA3 data center campus in Ashburn.
6.31 miles East PlazaInterested in this information?Contact us
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
6.35 miles East HubInterested in this information?Contact us
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
6.37 miles Center MaxInterested in this information?Contact us
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
6.38 miles Vantage: VA31
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
6.38 miles Vantage: VA33
This facility is a part of Vantage's VA3 data center campus in Ashburn.
6.43 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
6.49 miles Vantage: VA36
This facility is a part of Vantage's VA3 data center campus in Ashburn.
6.50 miles Vantage: VA37
This facility is a part of Vantage's VA3 data center campus in Ashburn.
6.57 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
6.58 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
6.60 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
6.64 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
6.74 miles Luck Stone: Ashburn 1
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
6.78 miles Luck Stone: Ashburn Expansion
6.79 miles Compass Loudoun County
6.79 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
6.82 miles SDC Capital: Twin Creeks
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
6.82 miles PrimeInterested in this information?Contact us
6.86 miles Park TwoInterested in this information?Contact us
6.88 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
6.89 miles BetaInterested in this information?Contact us
6.98 miles ProInterested in this information?Contact us
7.16 miles Park TwoInterested in this information?Contact us
7.23 miles Springfield East: Leesburg, VA
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
7.35 miles Hyperscale Data CenterInterested in this information?Contact us
7.35 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
7.39 miles Hyperscale Data CenterInterested in this information?Contact us
7.42 miles Hyperscale Data CenterInterested in this information?Contact us
7.49 miles Tuscarora Crossing Campus
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
7.53 miles Hyperscale Data CenterInterested in this information?Contact us
7.54 miles EdgeInterested in this information?Contact us
The campus consists of five buildings, with a total of 1.9 million-square-feet.
7.54 miles ParkInterested in this information?Contact us
7.56 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
7.64 miles CoreInterested in this information?Contact us
7.67 miles Ridge ThreeInterested in this information?Contact us
7.72 miles Prime HubInterested in this information?Contact us
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
7.72 miles EdgeInterested in this information?Contact us
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
7.76 miles JK Land: Greenlin Park 1
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
7.76 miles Center UltraInterested in this information?Contact us
7.77 miles West CampusInterested in this information?Contact us
7.83 miles Farkas Family: Leesburg, VA
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
7.84 miles Tower UltraInterested in this information?Contact us
7.85 miles RidgeInterested in this information?Contact us
7.88 miles JK Land: Greenlin Expansion
7.91 miles JK Land: Cross Mill Center
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
7.93 miles Hub OneInterested in this information?Contact us
7.94 miles Plaza OneInterested in this information?Contact us
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
7.95 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
8.01 miles CoreInterested in this information?Contact us
8.04 miles RidgeInterested in this information?Contact us
8.13 miles Point ProInterested in this information?Contact us
8.16 miles West StationInterested in this information?Contact us
8.18 miles GammaInterested in this information?Contact us
8.24 miles Core CampusInterested in this information?Contact us
8.24 miles Campus ThreeInterested in this information?Contact us
8.33 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
8.33 miles South ParkInterested in this information?Contact us
8.34 miles Campus AlphaInterested in this information?Contact us
8.37 miles Metro ValleyInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
8.37 miles Tower AlphaInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
8.37 miles Tower OneInterested in this information?Contact us
8.39 miles Hub GammaInterested in this information?Contact us
8.39 miles Core RidgeInterested in this information?Contact us
8.40 miles JK Land: Tech Park 1 Expansion
8.43 miles Park UltraInterested in this information?Contact us
8.43 miles ProInterested in this information?Contact us
8.44 miles PowerHouse: Arcola Bldg B
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
8.45 miles ParkInterested in this information?Contact us
8.46 miles Point ThreeInterested in this information?Contact us
8.48 miles West PointInterested in this information?Contact us
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
8.49 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
8.50 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
8.51 miles PowerHouse Arcola
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
8.52 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
8.54 miles HubInterested in this information?Contact us
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
8.55 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
8.57 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
8.59 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
8.69 miles Station ProInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
8.70 miles Active Infra: Spring Valley Tech Park
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
8.70 miles Active Infra: Spring Valley Expansion
8.74 miles Peterson: Leesburg Gateway Campus
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
8.81 miles West CampusInterested in this information?Contact us
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
8.82 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
8.82 miles EastInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
8.83 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
8.83 miles West RidgeInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
8.84 miles Center ProInterested in this information?Contact us
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
8.89 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
9.02 miles WestInterested in this information?Contact us
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
9.02 miles CentralInterested in this information?Contact us
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
9.03 miles Stack: NVA06B
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
9.07 miles Center MaxInterested in this information?Contact us
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
9.08 miles Central CenterInterested in this information?Contact us
9.12 miles Stack: NVA06A
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
9.13 miles Central StationInterested in this information?Contact us
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
9.15 miles Ridge ThreeInterested in this information?Contact us
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
9.23 miles MetroInterested in this information?Contact us
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
9.29 miles WestInterested in this information?Contact us
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
9.31 miles Ridge OneInterested in this information?Contact us
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
9.37 miles PlusInterested in this information?Contact us
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
10.58 miles Parkstone Tech Park
11.28 miles Equinix Vienna DC8
12.53 miles Cogent Vienna
12.56 miles 8100 Boone - Digital Realty
12.88 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
12.93 miles Lumen McLean 1
13.01 miles Equinix Vienna DC7
13.04 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
13.05 miles Element Critical VA1
13.32 miles Atmosphere: Dickerson, Maryland
14.54 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
15.88 miles Verizon: 7777 Infantry Ridge
Former AOL data center
15.97 miles Equinix Manassas DC14
15.97 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
16.57 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
16.66 miles Point ThreeInterested in this information?Contact us
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
16.73 miles East CenterInterested in this information?Contact us
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
16.98 miles Center AlphaInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
17.07 miles Plaza OneInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
17.17 miles Station AlphaInterested in this information?Contact us
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
17.27 miles Station AlphaInterested in this information?Contact us
17.36 miles PrimeInterested in this information?Contact us
17.37 miles PlusInterested in this information?Contact us
17.43 miles NorthInterested in this information?Contact us
17.49 miles ThreeInterested in this information?Contact us
17.50 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
17.57 miles SouthInterested in this information?Contact us
17.59 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
17.64 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
17.65 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
17.67 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
17.80 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
17.82 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
17.89 miles UltraInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
18.01 miles Station OneInterested in this information?Contact us
18.06 miles Core HubInterested in this information?Contact us
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
18.09 miles Cloud CenterInterested in this information?Contact us
18.09 miles Hub OneInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
18.10 miles Plaza PlusInterested in this information?Contact us
18.10 miles Tower ThreeInterested in this information?Contact us
18.11 miles Central HubInterested in this information?Contact us
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
18.17 miles South ParkInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
18.17 miles MetroInterested in this information?Contact us
18.18 miles East PlazaInterested in this information?Contact us
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
18.22 miles PrimeInterested in this information?Contact us
18.27 miles PlazaInterested in this information?Contact us
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
18.27 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
18.30 miles TowerInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
18.30 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
18.32 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
18.32 miles Prime ValleyInterested in this information?Contact us
18.34 miles Iron Mountain VA-2
18.38 miles PointInterested in this information?Contact us
18.41 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
18.42 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
18.42 miles HubInterested in this information?Contact us
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
18.44 miles East PointInterested in this information?Contact us
18.49 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
18.50 miles Plaza ProInterested in this information?Contact us
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
18.52 miles Opus Interactive Manassas
18.54 miles Center MaxInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
18.55 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
18.55 miles Tower OneInterested in this information?Contact us
18.56 miles Valley GammaInterested in this information?Contact us
18.60 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
18.60 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.60 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.61 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.61 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.64 miles TPC: Manassas, VA
18.64 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
18.71 miles Central PlazaInterested in this information?Contact us
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
18.77 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
18.78 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
18.80 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
18.80 miles Park PlusInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.82 miles South HubInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.84 miles PlazaInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.84 miles Cloud PlazaInterested in this information?Contact us
18.91 miles CampusInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.93 miles Core StationInterested in this information?Contact us
19.03 miles South ValleyInterested in this information?Contact us
19.03 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
19.04 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
19.06 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
19.07 miles MaxInterested in this information?Contact us
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
19.08 miles SouthInterested in this information?Contact us
19.14 miles Campus PlusInterested in this information?Contact us
19.20 miles Plaza PlusInterested in this information?Contact us
19.20 miles PlazaInterested in this information?Contact us
19.23 miles Yondr Bristow Campus
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
19.26 miles ParkInterested in this information?Contact us
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
19.27 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
19.27 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
19.33 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
19.34 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
19.41 miles Yondr: Bristow Bldg 2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
19.43 miles Hub GammaInterested in this information?Contact us
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
19.45 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
19.46 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
19.48 miles QTS: Manassas 1 DC4
19.50 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
19.53 miles Park GammaInterested in this information?Contact us
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
19.57 miles Verizon: 4301 Connecticut
19.60 miles 8217 Linton Hall (VA4) Digital Realty
19.71 miles Core ParkInterested in this information?Contact us
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
19.73 miles Hub MaxInterested in this information?Contact us
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
19.73 miles Point AlphaInterested in this information?Contact us
19.78 miles CoreInterested in this information?Contact us
Amazon is building another data center in it's Innovation Drive campus.
19.78 miles MaxInterested in this information?Contact us
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
19.83 miles GlobalInterested in this information?Contact us
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
19.84 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
19.98 miles VAZATA Northern Virginia (NoVa One)
19.98 miles Evoswitch USA WDC 1
19.98 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
19.98 miles Tower UltraInterested in this information?Contact us

EdgeCore Ashburn Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

Edgecore is headquartered in Denver, Colorado. It operates under the EdgeCore Digital Infrastructure brand and focuses on large, high-density campuses for hyperscale customers. Partners Group acquired the platform in November 2022 and later completed an additional equity investment in 2024. Current and planned development includes Mesa in Greater Phoenix, Santa Clara in Silicon Valley, the Tahoe-Reno Industrial Center near Reno, and multiple sites in Virginia including Ashburn, Culpeper, and Louisa County.

History:

  • 2025 Jun: Announced plans to invest $17B+ in a Louisa County, Virginia
  • 2024 Jul: Announced a new hyperscale campus in Culpeper, Virginia.
  • Edgecore
  • 2024 Sep: Partners Group completed a USD 1.9 billion equity investment in EdgeCore Digital Infrastructure.
  • 2023 Oct: Introduced a new brand identity as EdgeCore Digital Infrastructure.
  • 2023 Jan: Broke ground on a data center campus in Santa Clara, California.
  • 2022 Nov: Acquired by Partners Group.
  • 2017 company founded
0
Facilities
0
Markets

News See all

Read EdgeCore Lands $1.5bn Funding for Virginia Data Center Expansion
EdgeCore Lands $1.5bn Funding for Virginia Data Center Expansion

EdgeCore Lands $1.5bn Funding for Virginia Data Center Expansion

April 21, 2026 EdgeCore Internet Real Estate, LLC

US data center firm EdgeCore has secured new financing to support its build-out in Virginia. The company this week announced the completion of two financial transactions totaling $1.5 billion to fund the construction of two single-tenant hyperscale data centers in Northern Virginia, AS01 and...

Read more
Read EdgeConneX to Build Data Centers in Chicago and Atlanta
EdgeConneX to Build Data Centers in Chicago and Atlanta

EdgeConneX to Build Data Centers in Chicago and Atlanta

August 20, 2025 EdgeCore Internet Real Estate, LLC

Build-to-suit data center company EdgeConneX will set up data centers in Chicago and Atlanta for neocloud Lambda to support hybrid cooling with liquid-to-the-chip direct cooling and air cooling, and join two existing air-cooled facilities across both cities. "Our partnership with Lambda...

Read more
Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read Edgecore completes $440 million debt financing deal
Edgecore completes $440 million debt financing deal

Edgecore completes $440 million debt financing deal

March 14, 2024 EdgeCore Internet Real Estate, LLC

EdgeCore Digital Infrastructure has completely secured a $440 million debt financing deal for its Silicon Valley data center buildout. This deal along with a $1.9 billion deal secured in January, were both structured as Green Loans, with ING Capital LLC as the sole Green Loan Structuring Agent....

Read more
Read EdgeCore secures $1.9 billion in green energy debt financing
EdgeCore secures $1.9 billion in green energy debt financing

EdgeCore secures $1.9 billion in green energy debt financing

January 05, 2024 EdgeCore Internet Real Estate, LLC

US data center firm EdgeCore Digital Infrastructure recently raised $1.9 billion in a debt financing transaction to fund scalable development on its campus in Mesa, Arizona. This financing comprises a limited-recourse senior secured term loan, a revolving senior secured letter of credit facility,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?