JK Land: Cross Mill Center

Latest Podcast 20040 Sycolin Rd
Planned
Future facility in planning stage
Operated by:

JK Land: Cross Mill Center

Year Planned: 2028
Lot Size: 22 acres

A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved. The facility, to be known as the Cross Mill Center, will be situated on a 22-acre parcel of land near the Leesburg Executive Airport. The approval permits the construction of up to 556,746 sq ft (51,723 sqm) of data center space, or up to 416,000 sq ft (38,647 sqm) of warehousing and distribution facilities, or up to 218,000 sq ft (20,252 sqm) of flex industrial uses.

Map and Nearby Locations

20040 Sycolin Rd
JK Land Holdings, LLC Sites
Nearby Facilities

JK Land: Cross Mill Center Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of JK Land: Cross Mill Center

Distance Site About
0.27 miles Hub GammaInterested in this information?Contact us
0.43 miles EdgeInterested in this information?Contact us
0.44 miles JK Land: Greenlin Expansion
0.49 miles Core PointInterested in this information?Contact us
The campus consists of five buildings, with a total of 1.9 million-square-feet.
0.55 miles JK Land: Greenlin Park 1
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
0.58 miles Hyperscale Data CenterInterested in this information?Contact us
0.60 miles North PointInterested in this information?Contact us
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
0.65 miles UltraInterested in this information?Contact us
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
0.68 miles Hyperscale Data CenterInterested in this information?Contact us
0.73 miles Hyperscale Data CenterInterested in this information?Contact us
0.78 miles Hyperscale Data CenterInterested in this information?Contact us
0.96 miles Prime ValleyInterested in this information?Contact us
1.02 miles OneInterested in this information?Contact us
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
1.02 miles Park BetaInterested in this information?Contact us
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
1.17 miles Luck Stone: Ashburn Expansion
1.18 miles Luck Stone: Ashburn 1
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
1.32 miles Stack: NVA06B
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
1.33 miles Tuscarora Crossing Campus
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
1.47 miles Stack: NVA06A
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
1.58 miles Compass Loudoun County
1.67 miles SDC Capital: Twin Creeks
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
1.68 miles Farkas Family: Leesburg, VA
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
2.31 miles Belmont Innovation Campus
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
2.35 miles Springfield East: Leesburg, VA
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
2.53 miles Vantage: VA33
This facility is a part of Vantage's VA3 data center campus in Ashburn.
2.57 miles CyrusOne: Broadlands Expansion
2.61 miles Vantage: VA37
This facility is a part of Vantage's VA3 data center campus in Ashburn.
2.61 miles CyrusOne: Broadlands Boulevard 1
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
2.61 miles Vantage: VA32
This facility is a part of Vantage's VA3 data center campus in Ashburn.
2.64 miles Vantage: VA31
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
2.69 miles Vantage: VA36
This facility is a part of Vantage's VA3 data center campus in Ashburn.
2.71 miles RidgeInterested in this information?Contact us
2.74 miles Vantage: VA35
This facility is a part of Vantage's VA3 data center campus in Ashburn.
2.80 miles Vantage: VA34
This facility is a part of Vantage's VA3 data center campus in Ashburn.
2.80 miles JK Land: Freedom Trail Rd
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
2.95 miles Peterson: Leesburg Gateway Campus
Peterson Companies, through its affiliate Leesburg Gateway, LLC, is proposing a significant data center and industrial development on a 100-acre site in Leesburg, Virginia.
3.29 miles Active Infra: Spring Valley Tech Park
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
3.30 miles Active Infra: Spring Valley Expansion
3.88 miles JK Land: Ashburn
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
4.51 miles GlobalInterested in this information?Contact us
Amazon completed its $427.3 million acquisition of GWU’s 122-acre Ashburn campus to build the Bridgefield Tech Center, featuring four two-story data centers totaling 800,000 square feet alongside three parking structures.
4.89 miles DataBank Ashburn IAD3
4.93 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
4.94 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
4.99 miles FastServ Ashburn
5.00 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
5.01 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
5.06 miles NTT: VA8
5.06 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
5.10 miles AlphaInterested in this information?Contact us
Amazon plans to build another data center in Loudoun County.
5.12 miles Sabey Intergate: Ashburn Bldg-B
5.14 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
5.18 miles NTT VA4
5.19 miles NTT: VA9
5.23 miles NTT VA5
5.26 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
5.28 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
5.38 miles 43790 Devin Shafron (Bldg E)
5.40 miles Equinix DC13
5.40 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
5.41 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
5.41 miles Campus TwoInterested in this information?Contact us
5.42 miles 43791 Devin Shafron (Bldg D)
5.46 miles Deft: DRT-IAD1
5.46 miles 43830 Devin Shafron (Bldg F)
5.46 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
5.47 miles Core RidgeInterested in this information?Contact us
5.50 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
5.51 miles 43831 Devin Shafron (Bldg C)
5.52 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
5.52 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
5.55 miles Rackspace Ashburn IAD3
5.55 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
5.55 miles East CampusInterested in this information?Contact us
5.58 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
5.59 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
5.60 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
5.61 miles 44521 Hastings (ACC5) Digital Realty
5.61 miles MetroInterested in this information?Contact us
5.61 miles 43881 Devin Shafron (Bldg B)
5.62 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
5.62 miles 43915 Devin Shafron (Bldg A)
5.64 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
5.64 miles 44470 Chillum - Digital Realty
5.64 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
5.70 miles 21745 Sir Timothy (ACC9) Digital Realty
5.70 miles NTT VA2
5.71 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
5.73 miles 44490 Chilum (ACC2): Digital Realty
5.73 miles ParkInterested in this information?Contact us
5.74 miles Central StationInterested in this information?Contact us
5.74 miles Visa Eastern US Ashburn
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
5.77 miles 44520 Hastings (ACC3) Digital Realty
5.78 miles 43780 Digital Loudoun Plaza (Bldg H)
5.79 miles 43940 Digital Loudoun Plaza (Bldg G)
5.79 miles Lumen Ashburn
5.80 miles Equinix Ashburn DC4
5.80 miles 21744 Sir Timothy Drive (ACC10)
5.82 miles CloudInterested in this information?Contact us
5.84 miles AlphaInterested in this information?Contact us
5.84 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
5.85 miles Equinix Ashburn DC5
5.86 miles 44372 Round Table: Digital Realty
5.87 miles 44100 Digital Loudoun Plaza (Bldg J)
5.88 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
5.90 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
5.90 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
5.90 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
5.91 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
5.91 miles 44060 Digital Loudoun Plaza (Bldg K)
5.91 miles 44274 Round Table (Bldg L)
5.92 miles Equinix Ashburn DC1
5.92 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
5.92 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
5.96 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
5.96 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
5.97 miles Equinix DC16
5.97 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
5.99 miles MaxInterested in this information?Contact us
6.00 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
6.01 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
6.01 miles Equinix Ashburn DC11
6.01 miles Equinix Ashburn DC6
6.03 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
6.04 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
6.05 miles Central CampusInterested in this information?Contact us
6.07 miles CloudHQ: LC1B
6.08 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
6.10 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
6.11 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
6.12 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
6.13 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
6.13 miles Equinix DC15
6.13 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
6.14 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
6.20 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
6.21 miles PowerHouse ABX1
6.21 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
6.22 miles ProInterested in this information?Contact us
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
6.23 miles ThreeInterested in this information?Contact us
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
6.25 miles Import Plz, Ashburn
6.25 miles 44751 Round Table (Bldg P)
6.25 miles Center PlusInterested in this information?Contact us
6.26 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
6.27 miles Washington Commanders: Ashburn, VA
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
6.32 miles Equinix DC21
6.37 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
6.37 miles PrimeInterested in this information?Contact us
6.41 miles Core ValleyInterested in this information?Contact us
6.41 miles 44351 Import Plz
6.48 miles Hyperscale Data CenterInterested in this information?Contact us
6.49 miles Hyperscale Data CenterInterested in this information?Contact us
6.49 miles Stack: NVA04C
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
6.55 miles Stack: NVA04B
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
6.55 miles Corscale: Kincora
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
6.60 miles Stack: NVA04A
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
6.61 miles Hyperscale Data CenterInterested in this information?Contact us
6.63 miles Hyperscale Data CenterInterested in this information?Contact us
6.67 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
6.72 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
6.76 miles 21641 Charles View
6.78 miles Digital Realty: Broderick Drive
6.79 miles Metro ValleyInterested in this information?Contact us
6.80 miles CyrusOne: NVA7
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
6.81 miles DataCanopy: Sterling, VA
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
6.81 miles Digital Realty: IAD43
6.84 miles Center UltraInterested in this information?Contact us
6.84 miles 21710 Charles View
6.85 miles CyrusOne: NVA5
6.88 miles Point GammaInterested in this information?Contact us
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
6.90 miles CloudInterested in this information?Contact us
6.91 miles PowerHouse: Pacific Bldg C
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
6.92 miles PowerHouse: Pacific Bldg B
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
6.93 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
6.94 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
6.94 miles Central ParkInterested in this information?Contact us
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
6.94 miles PowerHouse Pacific
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
6.95 miles TwoInterested in this information?Contact us
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
6.98 miles Park BetaInterested in this information?Contact us
6.98 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
7.02 miles North ParkInterested in this information?Contact us
7.03 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
7.06 miles SouthInterested in this information?Contact us
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
7.06 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
7.14 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
7.22 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
7.26 miles MetroInterested in this information?Contact us
7.26 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
7.26 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
7.29 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
7.29 miles PointOne: Ashburn
The campus will have 2 buildings
7.30 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
7.32 miles TA Realty: Sterling, Virginia
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
7.33 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
7.34 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
7.37 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
7.37 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
7.41 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
7.41 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
7.43 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
7.43 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
7.43 miles Center UltraInterested in this information?Contact us
7.44 miles CenterInterested in this information?Contact us
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
7.45 miles JK Land: Tech Park 1 Expansion
7.48 miles Core StationInterested in this information?Contact us
7.50 miles ValleyInterested in this information?Contact us
7.53 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
7.53 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
7.53 miles COPT: 45771 Maries Rd
7.53 miles CoreInterested in this information?Contact us
7.59 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
7.60 miles Core RidgeInterested in this information?Contact us
7.61 miles COPT: 45761 Maries Rd
7.62 miles South PlazaInterested in this information?Contact us
7.64 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
7.72 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
7.72 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
7.72 miles Central RidgeInterested in this information?Contact us
7.72 miles Point BetaInterested in this information?Contact us
7.74 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
7.74 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
7.74 miles Edge RidgeInterested in this information?Contact us
7.75 miles Hyperscale Data CenterInterested in this information?Contact us
7.77 miles CloudInterested in this information?Contact us
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
7.79 miles CyrusOne Northern Virginia Sterling I, II, III
7.80 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
7.80 miles MaxInterested in this information?Contact us
7.80 miles Centersquare: Sterling DC3
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
7.84 miles Hub ProInterested in this information?Contact us
7.86 miles Tower UltraInterested in this information?Contact us
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
7.86 miles West CenterInterested in this information?Contact us
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
7.88 miles Central CampusInterested in this information?Contact us
7.88 miles Center PrimeInterested in this information?Contact us
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
7.89 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
7.89 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
7.89 miles Global TowerInterested in this information?Contact us
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
7.90 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
7.91 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
7.91 miles EdgeCore Ashburn
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
7.92 miles 21110 Ridgetop
The site is fully leased to triple net tenants.
7.92 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
7.92 miles Centersquare: Sterling DC2
7.93 miles GammaInterested in this information?Contact us
7.93 miles CampusInterested in this information?Contact us
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
7.94 miles Campus PlusInterested in this information?Contact us
7.94 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
7.94 miles Central CenterInterested in this information?Contact us
7.95 miles Centersquare: Sterling DC4
7.96 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
7.97 miles CyrusOne Sterling VIII
7.97 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
7.98 miles Prime CenterInterested in this information?Contact us
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
7.99 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
8.00 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
8.00 miles Campus UltraInterested in this information?Contact us
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
8.02 miles Plaza GammaInterested in this information?Contact us
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
8.02 miles Valley UltraInterested in this information?Contact us
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
8.04 miles Campus OneInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
8.05 miles BetaInterested in this information?Contact us
8.06 miles PlusInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
8.06 miles Core PointInterested in this information?Contact us
8.06 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
8.09 miles West ParkInterested in this information?Contact us
8.10 miles CenterInterested in this information?Contact us
8.10 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
8.11 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
8.12 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
8.15 miles Valley AlphaInterested in this information?Contact us
8.15 miles NorthInterested in this information?Contact us
8.17 miles PointInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
8.18 miles South HubInterested in this information?Contact us
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
8.20 miles PointInterested in this information?Contact us
8.31 miles ProInterested in this information?Contact us
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
8.33 miles PowerHouse: Arcola Bldg B
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
8.34 miles Valley GammaInterested in this information?Contact us
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
8.36 miles PowerHouse Arcola
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
8.47 miles Prime CampusInterested in this information?Contact us
8.51 miles Tower TwoInterested in this information?Contact us
8.56 miles CampusInterested in this information?Contact us
8.61 miles Kyndryl: Sterling
8.68 miles CyrusOne Northern Virginia Sterling IV
8.73 miles Connect Data Centers: Sterling, VA
8.75 miles Tower MaxInterested in this information?Contact us
8.76 miles Centersquare: IAD2-B
8.78 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
8.82 miles Cloud CampusInterested in this information?Contact us
8.90 miles West CenterInterested in this information?Contact us
9.04 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
9.06 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
9.12 miles Campus PrimeInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
9.15 miles Valley UltraInterested in this information?Contact us
9.15 miles RidgeInterested in this information?Contact us
9.17 miles Campus OneInterested in this information?Contact us
9.17 miles Central CampusInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
9.24 miles Campus AlphaInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
9.25 miles PlusInterested in this information?Contact us
10.38 miles Station TwoInterested in this information?Contact us
10.46 miles PlusInterested in this information?Contact us
10.46 miles Core ParkInterested in this information?Contact us
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
10.51 miles Metro CampusInterested in this information?Contact us
10.54 miles Center ProInterested in this information?Contact us
10.55 miles Point TwoInterested in this information?Contact us
10.59 miles Center UltraInterested in this information?Contact us
10.60 miles NorthInterested in this information?Contact us
10.73 miles Hub PrimeInterested in this information?Contact us
10.73 miles Global RidgeInterested in this information?Contact us
10.75 miles CloudInterested in this information?Contact us
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
10.78 miles Core RidgeInterested in this information?Contact us
10.88 miles PlazaInterested in this information?Contact us
10.91 miles Edge RidgeInterested in this information?Contact us
11.02 miles Valley UltraInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
11.03 miles Station BetaInterested in this information?Contact us
11.13 miles Central ValleyInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
11.14 miles Park PlusInterested in this information?Contact us
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
11.16 miles UltraInterested in this information?Contact us
11.22 miles EdgeInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
11.25 miles Cloud PointInterested in this information?Contact us
11.34 miles Lumen Herndon 1
11.36 miles Lumen Herndon 3
11.36 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
11.45 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
11.54 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
11.59 miles Atmosphere: Dickerson, Maryland
11.66 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
11.68 miles H5: Herndon
11.73 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
11.74 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
11.77 miles SouthInterested in this information?Contact us
11.84 miles West CampusInterested in this information?Contact us
11.84 miles Tower ThreeInterested in this information?Contact us
11.91 miles Campus ProInterested in this information?Contact us
11.94 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
11.96 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
11.99 miles Park ProInterested in this information?Contact us
12.15 miles Hub PrimeInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
12.23 miles Hub UltraInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
12.50 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
12.50 miles Campus GammaInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
12.57 miles Station ProInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
12.60 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
12.60 miles Edge CampusInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
12.69 miles CoreSite: VA2
12.71 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
12.71 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
13.95 miles Parkstone Tech Park
14.15 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
14.32 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
14.43 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
14.97 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
16.23 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
17.91 miles CoreInterested in this information?Contact us
17.95 miles East TowerInterested in this information?Contact us
17.97 miles Ridge OneInterested in this information?Contact us
18.01 miles Verizon: 7777 Infantry Ridge
Former AOL data center
18.03 miles Center PrimeInterested in this information?Contact us
18.14 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
18.14 miles Equinix Manassas DC14
18.14 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
18.20 miles Rowan: Frederick 1A
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
18.21 miles North CampusInterested in this information?Contact us
Amazon Web Services (AWS) is set to significantly expand its data center operations by establishing a new presence in Frederick, Maryland.
18.22 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
18.30 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
18.31 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
18.32 miles Center OneInterested in this information?Contact us
This facility will be part of Amazon's BWI-150 campus in Maryland.
18.33 miles GammaInterested in this information?Contact us
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
18.33 miles Cloud CenterInterested in this information?Contact us
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
18.33 miles Rowan: Frederick 1C
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
18.35 miles Rowan: Frederick 2D
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
18.35 miles Rowan: Frederick 2C
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
18.35 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
18.38 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
18.38 miles Point BetaInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
18.39 miles Valley TwoInterested in this information?Contact us
This facility will be part of Amazon's BWI- 150 campus in Maryland.
18.39 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.40 miles Rowan: Frederick 1B
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
18.42 miles Campus AlphaInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.44 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.48 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.48 miles PointInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.49 miles Rowan: Frederick 2B
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
18.51 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
18.52 miles Park TwoInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.54 miles Valley BetaInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
18.55 miles Ridge TwoInterested in this information?Contact us
This facility will be part of Amazon's BWI-150 campus in Maryland.
18.57 miles Rowan: Frederick 2A
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
18.57 miles Rowan: Frederick 1D
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
18.61 miles Global RidgeInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
18.73 miles East HubInterested in this information?Contact us
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
18.77 miles Cloud TowerInterested in this information?Contact us
18.77 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
18.78 miles OneInterested in this information?Contact us
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
18.80 miles Edge CenterInterested in this information?Contact us
18.81 miles Station MaxInterested in this information?Contact us
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
18.82 miles Central RidgeInterested in this information?Contact us
18.83 miles Center AlphaInterested in this information?Contact us
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
18.85 miles North PlazaInterested in this information?Contact us
18.85 miles CoreInterested in this information?Contact us
18.88 miles Rowan: Frederick 3C
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
18.89 miles East HubInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
18.90 miles Core CenterInterested in this information?Contact us
18.91 miles Point UltraInterested in this information?Contact us
18.93 miles Prime PointInterested in this information?Contact us
18.94 miles Station GammaInterested in this information?Contact us
18.96 miles Rowan: Frederick 3A
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
19.01 miles Metro ValleyInterested in this information?Contact us
19.03 miles Rowan: Frederick 3B
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
19.05 miles PlazaInterested in this information?Contact us
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
19.09 miles Ridge MaxInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
19.09 miles Equinix Vienna DC8
19.12 miles Aligned: IAD04 Bldg1
The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.
19.19 miles Central RidgeInterested in this information?Contact us
19.21 miles Aligned: IAD06
Aligned is developing IAD-06 as part of its Frederick campus within Quantum Frederick Park, expanding hyperscale data center infrastructure on a former industrial redevelopment site in Maryland.
19.21 miles Aligned: IAD04 Bldg2
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
19.27 miles Aligned: IAD04 Bldg3
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
19.30 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
19.31 miles North ParkInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
19.36 miles TPG Real Estate: Frederick Campus
The Quantum Frederick Project, a 2,100-acre data center campus and fiber optic loop (QLoop) in Frederick County, Maryland, was first announced by TPG Real Estate and Quantum Loophole in 2021.
19.38 miles Aligned: IAD04 Bldg4
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
19.42 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
19.60 miles Metro PlazaInterested in this information?Contact us
19.64 miles Tower TwoInterested in this information?Contact us
19.64 miles North ParkInterested in this information?Contact us
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
19.67 miles Valley PlusInterested in this information?Contact us
19.68 miles PlusInterested in this information?Contact us
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
19.72 miles Station GammaInterested in this information?Contact us
19.75 miles PlazaInterested in this information?Contact us
19.75 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
19.79 miles Prime PlazaInterested in this information?Contact us
19.82 miles Iron Mountain VA-2
19.91 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
19.95 miles Yondr Bristow Campus
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
19.95 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
19.98 miles OneInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
19.99 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
19.99 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.

JK Land: Cross Mill Center Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

JK Land Holdings, LLC (JKLH) seeks land acquisitions that can be sold, leased, developed, placed into conservation easement, or utilized by sister companies JK Moving Services and CapRelo, a global employee relocation and assignment management firm serving private and public sector clients.

JKLH was founded in 2016 and has reinvested monies gained from land acquisition into protecting properties and tracts of land from future development. Over the past decade, JKLH has strategically redeployed more than 22,000 acres of its purchases into conservation easement, ensuring vulnerable vistas and habitats are preserved and protected for future generations.

0
Facilities
0
Markets

News See all

Read Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations
Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

Synergy Group names Northern Virginia, Beijing, and Dublin as top 3 hyperscale locations

August 23, 2024 Northern Virginia

A report from Synergy Research Group found that just twenty state or metro markets account for 62 percent of the world’s current hyperscale data center capacity. Northern Virginia tops this list while the Greater Beijing Area takes the second place, with both making up 22 percent of global...

Read more
Read Data center design standards approved by Leesburg Town Council in Loudoun
Data center design standards approved by Leesburg Town Council in Loudoun

Data center design standards approved by Leesburg Town Council in Loudoun

August 16, 2023 Northern Virginia

Leesburg's Loudoun County Council unanimously approved data center design criteria. Unlike Ashburn, Virginia's Leesburg has no data centers; however, this may change. Three rezoning petitions may allow data center development in town. One is in the Oaklawn neighborhood, one close to the former...

Read more
Read Prince William County locals want a data center developer to buy property outside Gainesville
Prince William County locals want a data center developer to buy property outside Gainesville

Prince William County locals want a data center developer to buy property outside Gainesville

June 28, 2023 Northern Virginia

Residents of Prince William County, Virginia, are attempting to sell their land to an unidentified data center developer. According to InsideNoVa, residents of Sanders Lane near Gainesville are attempting to sell their land to a data center developer. The residents appear to be attempting to...

Read more
Read Virginia's Culpeper County Receive Permit Requests For Zoning of Two 4.46M Sq Ft Data Center Campuses
Virginia's Culpeper County Receive Permit Requests For Zoning of Two 4.46M Sq Ft Data Center Campuses

Virginia's Culpeper County Receive Permit Requests For Zoning of Two 4.46M Sq Ft Data Center Campuses

May 25, 2023 Northern Virginia

The Virginian county of Culpeper may soon see the construction of more than four million square feet of data centers. The Culpeper Town and County Councils have received rezoning requests that would enable the construction of approximately 17 buildings on two campuses on the town's border...

Read more
Read Poll in Northern Virginia reveals local opposition to data center development near national parks
Poll in Northern Virginia reveals local opposition to data center development near national parks

Poll in Northern Virginia reveals local opposition to data center development near national parks

May 15, 2023 Northern Virginia

A poll of Northern Virginia residents by the National Parks Conservation Association has found that the majority oppose the development of data centers near public land, including national parks. The survey polled 300 voters from several Northern Virginia jurisdictions. Of those polled, 77%...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?