0.42 miles
|
GammaInterested in this information?Contact us
|
|
|
1.55 miles
|
Springfield East: Leesburg, VA
|
Springfield East and Kettler Inc. have proposed a 200,000 to 250,000 square-foot data center and substation on a 33.77-acre parcel at Golf Club Road and Russell Branch Parkway SE.
|
|
1.90 miles
|
Tuscarora Crossing Campus
|
BlackChamber Group plans to develop 701,400 square feet of data center space across three two-story buildings in Leesburg, Virginia.
|
|
2.19 miles
|
Stack: NVA06A
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
2.25 miles
|
Vantage: VA36
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.25 miles
|
Vantage: VA37
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.32 miles
|
Stack: NVA06B
|
Data center firm Stack Infrastructure announced a new campus in Leesburg. Known as NVA-06, the 32-acre site will host two data center buildings of around 620,000 sq ft (57,600 sqm) of space.
|
|
2.33 miles
|
SDC Capital: Twin Creeks
|
SDC Capital Partners has completed a massive land acquisition in Loudoun County, Virginia, for data center development.
|
|
2.38 miles
|
Vantage: VA31
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
|
2.39 miles
|
Vantage: VA33
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.47 miles
|
Vantage: VA34
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.47 miles
|
Vantage: VA35
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.48 miles
|
Tower OneInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
2.52 miles
|
Vantage: VA32
|
This facility is a part of Vantage's VA3 data center campus in Ashburn.
|
|
2.56 miles
|
GlobalInterested in this information?Contact us
|
Microsoft's Leesburg campus is located next to the Leesburg Executive Airport. The facilities, known as IAD01-1 and IAD01-2, together comprise more than 245,000 sq ft (22,750 sq m).
|
|
2.61 miles
|
Belmont Innovation Campus
|
SDC Capital Partners, through Loudoun GC, received board approval to build a 1.3 million square feet (120,774 sqm) data center on a 112-acre site situated between Belmont Ridge Road and Goose Creek, just south of Route 7.
|
|
2.73 miles
|
PrimeInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
2.76 miles
|
Station AlphaInterested in this information?Contact us
|
Microsoft's two data center buildings, known as IAD02 and IAD03, sit on a portion of the roughly 323 acres Microsoft acquired from the Peterson Cos. in 2018 for $73 million.
|
|
2.77 miles
|
JK Land: Freedom Trail Rd
|
The site, originally planned for 1,300 residential units, includes a prior proposal for two data centers totaling 1.1 million sq ft. JK Land Holdings' specific development plans are not yet confirmed.
|
|
2.89 miles
|
Prime HubInterested in this information?Contact us
|
|
|
2.94 miles
|
Plaza PlusInterested in this information?Contact us
|
|
|
2.95 miles
|
JK Land: Cross Mill Center
|
A proposal by JK Land Holdings for a new data center in Leesburg, Virginia, has been approved.
|
|
3.31 miles
|
Tower OneInterested in this information?Contact us
|
The campus consists of five buildings, with a total of 1.9 million-square-feet.
|
|
3.39 miles
|
JK Land: Greenlin Expansion
|
|
|
3.40 miles
|
Luck Stone: Ashburn 1
|
Virginia-based quarry company Luck Stone Corp. is planning to develop up to 2 million square feet (185,800 sqm) of new data center space in the Ashburn area of Loudoun County.
|
|
3.43 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.46 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.49 miles
|
JK Land: Greenlin Park 1
|
JK Land Holdings got approval to build 2.1 million sq ft (195,096 sq m) of data center and utility substation space on an 81-acre parcel between Sycolin Road and Dulles Greenway.
|
|
3.52 miles
|
Luck Stone: Ashburn Expansion
|
|
|
3.55 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.57 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
3.66 miles
|
HubInterested in this information?Contact us
|
|
|
4.08 miles
|
JK Land: Ashburn
|
JK Land Holdings is planning to develop a 360,000 sq ft (33,445 sq m), two-story data center on a 25-acre site located at 19886 Ashburn Road near Route 7 in Ashburn, Virginia.
|
|
4.24 miles
|
Compass Loudoun County
|
|
|
4.38 miles
|
StationInterested in this information?Contact us
|
Amazon completed its $427.3 million acquisition of GWU’s 122-acre Ashburn campus to build the Bridgefield Tech Center, featuring four two-story data centers totaling 800,000 square feet alongside three parking structures.
|
|
4.63 miles
|
Farkas Family: Leesburg, VA
|
The Farkas family, represented by law firm Curata Partners, has submitted a pre-meeting application to rezone approximately 87 acres at Holyfield Farm outside Leesburg, Virginia, from transitional residential to an industrial park.
|
|
5.01 miles
|
CyrusOne: Broadlands Boulevard 1
|
CyrusOne has acquired a plot of land in the Ashburn area of Virginia’s Loudoun County. The company has filed plans to build five two-story data center buildings on the campus.
|
|
5.03 miles
|
CyrusOne: Broadlands Expansion
|
|
|
6.17 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
|
6.22 miles
|
Active Infra: Spring Valley Tech Park
|
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
|
|
6.22 miles
|
Active Infra: Spring Valley Expansion
|
|
|
6.62 miles
|
MaxInterested in this information?Contact us
|
|
|
6.65 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
6.66 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
6.69 miles
|
DataBank Ashburn IAD3
|
|
|
6.71 miles
|
NTT: VA8
|
|
|
6.74 miles
|
BetaInterested in this information?Contact us
|
|
|
6.78 miles
|
NTT VA4
|
|
|
6.79 miles
|
ValleyInterested in this information?Contact us
|
Amazon plans to build another data center in Loudoun County.
|
|
6.79 miles
|
DataBank Ashburn IAD4
|
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
|
|
6.81 miles
|
StationInterested in this information?Contact us
|
|
|
6.82 miles
|
FastServ Ashburn
|
|
|
6.84 miles
|
DataBank Ashburn IAD1
|
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
|
|
6.85 miles
|
DataCanopy: Ashburn 1
|
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
|
|
6.88 miles
|
NTT VA5
|
|
|
6.89 miles
|
NTT: VA9
|
|
|
6.93 miles
|
Sabey Intergate: Ashburn Bldg-C
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
|
6.95 miles
|
Sabey Intergate: Ashburn Bldg-B
|
|
|
6.96 miles
|
NTT: VA6
|
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
|
|
6.97 miles
|
NTT VA2
|
|
|
7.00 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
7.00 miles
|
Rackspace Ashburn IAD3
|
|
|
7.01 miles
|
WestInterested in this information?Contact us
|
|
|
7.01 miles
|
Regency DC Campus Ashburn
|
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
|
|
7.02 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
|
7.03 miles
|
44470 Chillum - Digital Realty
|
|
|
7.03 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
|
7.05 miles
|
Sabey Intergate: Ashburn Bldg-A
|
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
|
|
7.06 miles
|
44521 Hastings (ACC5) Digital Realty
|
|
|
7.07 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
|
7.08 miles
|
NTT: VA7
|
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
|
|
7.10 miles
|
Equinix: DC18
|
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
|
|
7.11 miles
|
Equinix: DC17
|
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
|
|
7.12 miles
|
44490 Chilum (ACC2): Digital Realty
|
|
|
7.12 miles
|
Lumen Ashburn
|
|
|
7.13 miles
|
South ValleyInterested in this information?Contact us
|
|
|
7.14 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
|
7.17 miles
|
OneInterested in this information?Contact us
|
|
|
7.18 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
|
7.18 miles
|
DataCanopy: Ashburn 2
|
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
|
|
7.18 miles
|
Equinix DC13
|
|
|
7.18 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
|
7.19 miles
|
Equinix DC16
|
|
|
7.20 miles
|
Corscale: Kincora
|
Corscale is planning a second Virginia development in the Kincora area of Sterling in Loudoun County. Sat on a 22-acre site, the company is planning a single 500,000 sq ft (46,450 sqm) building, consisting of eight data halls across three stories.
|
|
7.21 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
|
7.24 miles
|
Aligned: IAD-01
|
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
|
|
7.28 miles
|
Centersquare: Ashburn WDC1
|
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
|
|
7.28 miles
|
Cologix: ASH2
|
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
|
|
7.29 miles
|
Cologix: ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
|
7.30 miles
|
Washington Commanders: Ashburn, VA
|
The Washington Commanders, via affiliate Scoreboard Landco Borrower LLC, have submitted plans for three data centers on a 34-acre portion of their Ashburn campus.
|
|
7.30 miles
|
Digital Realty: 21561 Beaumeade Cir
|
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
|
|
7.31 miles
|
Aligned: IAD-02
|
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
|
|
7.31 miles
|
Equinix Ashburn DC4
|
|
|
7.32 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
|
7.32 miles
|
CloudHQ: LC5
|
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
|
|
7.32 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
|
7.35 miles
|
Equinix DC15
|
|
|
7.36 miles
|
Quantum Connect: Ashburn, VA
|
A data center is under construction at the Quantum business park in Ashburn, Virginia.
|
|
7.36 miles
|
Equinix Ashburn DC5
|
|
|
7.39 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
|
7.40 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
|
7.41 miles
|
Equinix Ashburn DC1
|
|
|
7.43 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
|
7.43 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
7.44 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.46 miles
|
Lightedge: Ashburn
|
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
|
|
7.49 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.49 miles
|
Equinix Ashburn DC11
|
|
|
7.49 miles
|
Equinix Ashburn DC6
|
|
|
7.50 miles
|
Cyrusone: Beaumeade Circle
|
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
|
|
7.50 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
7.50 miles
|
Deft: DRT-IAD1
|
|
|
7.51 miles
|
PowerHouse ABX1
|
|
|
7.51 miles
|
West CampusInterested in this information?Contact us
|
|
|
7.51 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
7.53 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.54 miles
|
Cologix: Ashburn Expansion (Beaumeade Circle)
|
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
|
|
7.55 miles
|
CloudHQ LC2
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
7.56 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
7.59 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
7.59 miles
|
Core CenterInterested in this information?Contact us
|
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
|
|
7.61 miles
|
ThreeInterested in this information?Contact us
|
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
|
|
7.62 miles
|
Digital Realty: IAD-56
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
|
7.62 miles
|
CloudHQ: LC1A
|
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
|
|
7.63 miles
|
Hub PrimeInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
7.63 miles
|
44372 Round Table: Digital Realty
|
|
|
7.65 miles
|
44274 Round Table (Bldg L)
|
|
|
7.65 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
7.66 miles
|
CloudHQ: LC3
|
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
|
|
7.66 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
7.69 miles
|
CloudHQ: LC1B
|
|
|
7.71 miles
|
Equinix: DC22
|
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
|
|
7.73 miles
|
CyrusOne: NVA7
|
The NVA7 building is conveniently located only 8 miles away from Dulles International Airport, 35 miles from Washington National Airport, and is close to a variety of hotels and restaurants.
|
|
7.74 miles
|
Station GammaInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
7.78 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
|
7.78 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
7.80 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
7.80 miles
|
DataCanopy: Sterling, VA
|
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
|
|
7.80 miles
|
Equinix DC21
|
|
|
7.82 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
7.83 miles
|
Hub ProInterested in this information?Contact us
|
|
|
7.83 miles
|
CyrusOne: NVA5
|
|
|
7.85 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
7.85 miles
|
44751 Round Table (Bldg P)
|
|
|
7.87 miles
|
ThreeInterested in this information?Contact us
|
Amazon's Atlantic Blvd Campus in Sterling consists of three powered shell data center buildings. Blackstone Real Estate Income Trust (BREIT) is the landlord of this site.
|
|
7.88 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
7.90 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
7.91 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
7.92 miles
|
21641 Charles View
|
|
|
7.94 miles
|
StationInterested in this information?Contact us
|
|
|
7.95 miles
|
MaxInterested in this information?Contact us
|
|
|
7.98 miles
|
Dulles 28 Centre Motorplex
|
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
|
|
7.99 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
8.01 miles
|
AlphaInterested in this information?Contact us
|
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
|
|
8.03 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
8.05 miles
|
21710 Charles View
|
|
|
8.05 miles
|
Campus OneInterested in this information?Contact us
|
|
|
8.08 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
8.10 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
8.10 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
8.10 miles
|
PointOne: Ashburn
|
The campus will have 2 buildings
|
|
8.15 miles
|
TA Realty: Sterling, Virginia
|
TA Realty's data center arm has acquired a fully entitled site in Sterling for a planned two-story data center.
|
|
8.22 miles
|
Park ProInterested in this information?Contact us
|
|
|
8.23 miles
|
Stack: NVA04C
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
8.23 miles
|
Import Plz, Ashburn
|
|
|
8.25 miles
|
Paragon Park Lot 3B
|
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
|
|
8.27 miles
|
PointOne: IAD2
|
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
|
|
8.30 miles
|
Stack: NVA04B
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
8.32 miles
|
Station GammaInterested in this information?Contact us
|
|
|
8.32 miles
|
Digital Realty: Broderick Drive
|
|
|
8.33 miles
|
Dulles 28 Technology Park
|
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
|
|
8.36 miles
|
COPT: 45771 Maries Rd
|
|
|
8.37 miles
|
Park PlusInterested in this information?Contact us
|
|
|
8.37 miles
|
CentralInterested in this information?Contact us
|
|
|
8.37 miles
|
44351 Import Plz
|
|
|
8.37 miles
|
Stack: NVA04A
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
|
8.43 miles
|
PowerHouse Pacific
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
8.44 miles
|
Digital Realty: IAD43
|
|
|
8.44 miles
|
COPT: 45761 Maries Rd
|
|
|
8.44 miles
|
PowerHouse: Pacific Bldg B
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
8.45 miles
|
Park BetaInterested in this information?Contact us
|
|
|
8.46 miles
|
PowerHouse: Pacific Bldg C
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
8.50 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
|
8.53 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
8.53 miles
|
AlphaInterested in this information?Contact us
|
|
|
8.57 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.58 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
|
8.59 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
8.63 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
8.66 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
8.70 miles
|
Centersquare: Sterling DC4
|
|
|
8.71 miles
|
Centersquare: Sterling DC2
|
|
|
8.71 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
8.72 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
8.73 miles
|
Atmosphere: Dickerson, Maryland
|
|
|
8.73 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
8.74 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
8.75 miles
|
Hub PlusInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
8.77 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
8.78 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
8.78 miles
|
Tower BetaInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
8.79 miles
|
CyrusOne Sterling VIII
|
|
|
8.86 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
8.86 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
8.87 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.87 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
8.89 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
8.90 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
8.90 miles
|
Station ProInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
8.94 miles
|
Edge ParkInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
8.95 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
8.96 miles
|
Cloud ParkInterested in this information?Contact us
|
|
|
8.98 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
9.01 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
9.01 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
9.02 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
9.14 miles
|
East PointInterested in this information?Contact us
|
|
|
9.21 miles
|
StationInterested in this information?Contact us
|
|
|
9.24 miles
|
Core ParkInterested in this information?Contact us
|
|
|
9.25 miles
|
Metro ParkInterested in this information?Contact us
|
|
|
9.28 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
9.31 miles
|
Kyndryl: Sterling
|
|
|
9.31 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
9.34 miles
|
Hub ProInterested in this information?Contact us
|
|
|
9.35 miles
|
OneInterested in this information?Contact us
|
|
|
9.35 miles
|
Global TowerInterested in this information?Contact us
|
|
|
9.36 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
9.37 miles
|
CenterInterested in this information?Contact us
|
|
|
9.41 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
9.42 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
9.51 miles
|
West ParkInterested in this information?Contact us
|
|
|
9.52 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
9.53 miles
|
Center TwoInterested in this information?Contact us
|
|
|
9.55 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
9.57 miles
|
Tower GammaInterested in this information?Contact us
|
|
|
9.65 miles
|
Central PlazaInterested in this information?Contact us
|
|
|
9.66 miles
|
EastInterested in this information?Contact us
|
|
|
9.78 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
9.82 miles
|
East HubInterested in this information?Contact us
|
|
|
9.89 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
10.02 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
10.03 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
10.09 miles
|
Connect Data Centers: Sterling, VA
|
|
|
10.09 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
10.16 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
10.21 miles
|
Edge HubInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
10.22 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
10.23 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
10.24 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
10.27 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
10.30 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
10.30 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
10.30 miles
|
Centersquare: IAD2-B
|
|
|
10.31 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
10.34 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
10.35 miles
|
Park PlusInterested in this information?Contact us
|
|
|
10.37 miles
|
Tower ProInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
10.38 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
10.38 miles
|
Core TowerInterested in this information?Contact us
|
|
|
10.45 miles
|
Hub AlphaInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
10.47 miles
|
Park PlusInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
10.49 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
10.50 miles
|
RidgeInterested in this information?Contact us
|
|
|
10.52 miles
|
SouthInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
10.53 miles
|
Ridge PlusInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
10.61 miles
|
Plaza AlphaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
10.64 miles
|
Center OneInterested in this information?Contact us
|
|
|
10.66 miles
|
North HubInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
10.67 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
10.71 miles
|
EdgeInterested in this information?Contact us
|
|
|
10.72 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
10.75 miles
|
West ValleyInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
10.75 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
10.75 miles
|
Valley PlusInterested in this information?Contact us
|
|
|
10.75 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
10.77 miles
|
Station ProInterested in this information?Contact us
|
|
|
10.78 miles
|
Core StationInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
10.78 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
10.79 miles
|
Central PointInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
10.81 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
10.83 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
10.86 miles
|
BetaInterested in this information?Contact us
|
|
|
10.87 miles
|
West TowerInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
10.88 miles
|
ValleyInterested in this information?Contact us
|
|
|
10.91 miles
|
Valley ProInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
10.92 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
10.92 miles
|
Prime HubInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
10.95 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
10.97 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
11.13 miles
|
PowerHouse: Arcola Bldg B
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
11.16 miles
|
PowerHouse Arcola
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
11.17 miles
|
West PointInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
11.21 miles
|
EastInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
11.21 miles
|
Campus ProInterested in this information?Contact us
|
|
|
11.27 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
11.34 miles
|
Station AlphaInterested in this information?Contact us
|
|
|
12.71 miles
|
Lumen Herndon 1
|
|
|
12.72 miles
|
Lumen Herndon 3
|
|
|
12.89 miles
|
ProInterested in this information?Contact us
|
|
|
12.93 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
12.97 miles
|
Hub AlphaInterested in this information?Contact us
|
|
|
12.98 miles
|
Tower PrimeInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
13.01 miles
|
Ridge MaxInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
13.01 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
13.04 miles
|
H5: Herndon
|
|
|
13.05 miles
|
Central StationInterested in this information?Contact us
|
|
|
13.05 miles
|
Global ValleyInterested in this information?Contact us
|
|
|
13.11 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
13.12 miles
|
West PointInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
13.15 miles
|
Point PrimeInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
13.17 miles
|
East PointInterested in this information?Contact us
|
|
|
13.18 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
13.19 miles
|
PointInterested in this information?Contact us
|
|
|
13.19 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
13.19 miles
|
Ridge MaxInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
13.21 miles
|
ValleyInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
13.27 miles
|
CenterInterested in this information?Contact us
|
|
|
13.30 miles
|
Central PointInterested in this information?Contact us
|
|
|
13.31 miles
|
PlusInterested in this information?Contact us
|
|
|
13.35 miles
|
South ParkInterested in this information?Contact us
|
|
|
13.36 miles
|
Campus OneInterested in this information?Contact us
|
|
|
13.41 miles
|
Prime ParkInterested in this information?Contact us
|
|
|
13.52 miles
|
GlobalInterested in this information?Contact us
|
|
|
13.70 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
13.86 miles
|
West StationInterested in this information?Contact us
|
|
|
13.91 miles
|
Plaza ProInterested in this information?Contact us
|
|
|
13.91 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
13.92 miles
|
StationInterested in this information?Contact us
|
|
|
13.96 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
14.01 miles
|
EdgeInterested in this information?Contact us
|
|
|
14.07 miles
|
CoreSite: VA2
|
|
|
14.09 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
14.11 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
14.11 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
14.36 miles
|
South HubInterested in this information?Contact us
|
|
|
14.36 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
14.38 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
14.51 miles
|
Hub TwoInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
14.58 miles
|
Prime StationInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
14.88 miles
|
Hub PlusInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
14.96 miles
|
Hub PrimeInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
14.99 miles
|
Prime StationInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
15.26 miles
|
Rowan: Frederick 1A
|
Rowan Digital Infrastructure plans to develop a data center campus totaling 777,150 sq ft (72,200 sqm) across 151 acres in Frederick County, Maryland.
|
|
15.27 miles
|
Central ParkInterested in this information?Contact us
|
Amazon Web Services (AWS) is set to significantly expand its data center operations by establishing a new presence in Frederick, Maryland.
|
|
15.34 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
15.38 miles
|
CenterInterested in this information?Contact us
|
This facility will be part of Amazon's BWI-150 campus in Maryland.
|
|
15.40 miles
|
Rowan: Frederick 1C
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
15.40 miles
|
Rowan: Frederick 2D
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
15.41 miles
|
Rowan: Frederick 2C
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
15.45 miles
|
ValleyInterested in this information?Contact us
|
This facility will be part of Amazon's BWI- 150 campus in Maryland.
|
|
15.46 miles
|
Rowan: Frederick 1B
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
15.50 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
15.52 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
15.54 miles
|
Rowan: Frederick 2B
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick II campus in Maryland.
|
|
15.60 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
15.61 miles
|
Point UltraInterested in this information?Contact us
|
This facility will be part of Amazon's BWI-150 campus in Maryland.
|
|
15.62 miles
|
Rowan: Frederick 2A
|
Bauxite II will span 822,620 sq ft (76,400 sqm) on a 111.5-acre site, comprising four data center buildings.
|
|
15.63 miles
|
Rowan: Frederick 1D
|
This facility is one of the four data center buildings of Rowan Digital Infrastructure's Fredrick I campus in Maryland.
|
|
15.94 miles
|
Rowan: Frederick 3C
|
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
|
16.02 miles
|
Rowan: Frederick 3A
|
Bauxite III will span 591,913 sq ft (54,990 sqm) across a 55-acre site, comprising three data center buildings.
|
|
16.09 miles
|
Rowan: Frederick 3B
|
This facility is one of the three data center buildings of Rowan Digital Infrastructure's Fredrick III campus in Maryland.
|
|
16.18 miles
|
Aligned: IAD04 Bldg1
|
The company withdrew in 2023 when Maryland restricted diesel generator usage. However, following regulatory changes, Aligned recommitted to the project in 2024.
|
|
16.27 miles
|
Aligned: IAD06
|
Aligned is developing IAD-06 as part of its Frederick campus within Quantum Frederick Park, expanding hyperscale data center infrastructure on a former industrial redevelopment site in Maryland.
|
|
16.27 miles
|
Aligned: IAD04 Bldg2
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
16.33 miles
|
Aligned: IAD04 Bldg3
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
16.42 miles
|
TPG Real Estate: Frederick Campus
|
The Quantum Frederick Project, a 2,100-acre data center campus and fiber optic loop (QLoop) in Frederick County, Maryland, was first announced by TPG Real Estate and Quantum Loophole in 2021.
|
|
16.43 miles
|
Aligned: IAD04 Bldg4
|
The facility will be part of Aligned's Quantum Frederick campus in Maryland.
|
|
16.45 miles
|
Parkstone Tech Park
|
|
|
17.86 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
19.14 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
19.97 miles
|
Equinix Vienna DC8
|
|