|
3.07 miles
|
Lumen DC4
|
|
|
3.12 miles
|
Cogent: 1050 Connecticut
|
Cogent Communications runs its Washington DC 2 data center inside the Washington Square office building at 1050 Connecticut Avenue NW, in the District's Golden Triangle. The carrier-neutral facility offers cabinets and private cages on Cogent's network, with several other carriers on site.
|
|
3.22 miles
|
Verizon: 1120 Vermont
|
Former XO Communications site
|
|
3.22 miles
|
Cogent: 1120 Vermont
|
|
|
3.22 miles
|
Lumen DC 1
|
|
|
3.33 miles
|
CoreSite DC2
|
|
|
3.42 miles
|
Verizon: 1220 L
|
|
|
3.42 miles
|
Lumen DC2
|
|
|
3.44 miles
|
CoreSite DC1 - 1275 K Street NW
|
1275 K Street is Washington DC's Network Hotel
|
|
8.17 miles
|
Lumen McLean 1
|
|
|
8.24 miles
|
DataBank McLean IAD2
|
In 2020, DataBank acquired the site from zColo.
|
|
8.77 miles
|
Element Critical VA1
|
|
|
8.81 miles
|
Equinix Vienna DC7
|
|
|
8.99 miles
|
8100 Boone - Digital Realty
|
|
|
9.08 miles
|
Cogent Vienna
|
|
|
9.46 miles
|
Sansone: Silver Spring, MD
|
In August 2025, commercial real estate firm Sansone Group partnered with anchor tenant Priseda to acquire the 214,000-square-foot, Tier IV-quality data center in Silver Spring, Maryland, for approximately $29 million.
|
|
9.48 miles
|
DataBridge: Silver Spring MD
|
Gannett, the newspaper media company, has its primary data center in the building. Agile acquired the site in December 2017.
|
|
9.49 miles
|
Equinix Vienna DC8
|
|
|
9.71 miles
|
TAC: Northern Virginia
|
TAC Data Centers is partnering to develop a premier hyperscale data center on a 125-acre site in Northern Virginia, the world’s most dynamic data center market.
|
|
10.50 miles
|
AiNET Beltsville WDC-1
|
|
|
10.70 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|
|
11.24 miles
|
Lerner: Landover Expansion
|
|
|
11.32 miles
|
Lerner: Landover, MD
|
|
|
13.23 miles
|
TPC: Konterra 1
|
TPC Data Center is planning its first data center in Prince George's County at 6201 Frost Place in Laurel, close to the Burtonsville substation.
|
|
14.17 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
14.29 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
14.46 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
15.48 miles
|
Hub BetaInterested in this information?Contact us
|
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
|
|
15.83 miles
|
AiNET Laurel SCIF
|
|
|
16.16 miles
|
CoreSite: VA2
|
|
|
16.19 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
16.19 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
16.55 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
16.88 miles
|
H5: Herndon
|
|
|
17.07 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
17.13 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
17.15 miles
|
Lumen Herndon 3
|
|
|
17.16 miles
|
Lumen Herndon 1
|
|
|
17.96 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
18.84 miles
|
Kyndryl: Sterling
|
|
|
18.87 miles
|
CenterInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
18.91 miles
|
TwoInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
18.95 miles
|
Point TwoInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
19.14 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
19.16 miles
|
Center ThreeInterested in this information?Contact us
|
|
|
19.17 miles
|
Park PlusInterested in this information?Contact us
|
|
|
19.18 miles
|
Cloud PointInterested in this information?Contact us
|
|
|
19.27 miles
|
ThreeInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.28 miles
|
Connect Data Centers: Sterling, VA
|
|
|
19.30 miles
|
Park PlusInterested in this information?Contact us
|
|
|
19.30 miles
|
Prime TowerInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.39 miles
|
HubInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
19.39 miles
|
PointInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.42 miles
|
EastInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
19.42 miles
|
CentralInterested in this information?Contact us
|
Amazon Data Services has filed plans with Loudoun County to demolish and replace nine office buildings across three sites in Sterling with four data centers spanning more than 900,000 square feet (83,600 sqm) between them.
|
|
19.43 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
19.47 miles
|
Center PlusInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
19.48 miles
|
HubInterested in this information?Contact us
|
|
|
19.48 miles
|
GlobalInterested in this information?Contact us
|
|
|
19.50 miles
|
Centersquare: Sterling DC4
|
|
|
19.51 miles
|
CyrusOne Sterling VIII
|
|
|
19.53 miles
|
TowerInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
19.54 miles
|
CenterInterested in this information?Contact us
|
|
|
19.54 miles
|
21110 Ridgetop
|
The site is fully leased to triple net tenants.
|
|
19.55 miles
|
Centersquare: Sterling DC2
|
|
|
19.55 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
19.57 miles
|
EdgeCore Ashburn
|
EdgeCore has completed the topping out of a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft of space.
|
|
19.58 miles
|
Station UltraInterested in this information?Contact us
|
|
|
19.58 miles
|
Prime ValleyInterested in this information?Contact us
|
|
|
19.59 miles
|
Centersquare: IAD2-B
|
|
|
19.60 miles
|
TwoInterested in this information?Contact us
|
|
|
19.60 miles
|
Tower MaxInterested in this information?Contact us
|
|
|
19.64 miles
|
Campus PlusInterested in this information?Contact us
|
|
|
19.65 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
19.66 miles
|
PlazaInterested in this information?Contact us
|
|
|
19.66 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
19.67 miles
|
Centersquare: Sterling DC3
|
Cyxtera's DC3 site in Sterling was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
|
19.67 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
|
19.70 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
19.73 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
19.86 miles
|
UltraInterested in this information?Contact us
|
|
|
19.86 miles
|
COPT: 45761 Maries Rd
|
|
|
19.94 miles
|
Metro RidgeInterested in this information?Contact us
|
|
|
19.94 miles
|
COPT: 45771 Maries Rd
|
|
|
19.98 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|