Templus: Leeds LEE01

Latest Podcast Cornelius House
Operational
Fully operational facility
Operated by:

Templus: Leeds LEE01

Year Built: 2002
Utility Provider: Northern Powergrid
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

Templus bought this Tier 3 standard data centre from AtlasEdge in May 2026. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.

Technical stats

  • Size: 11,000 sq ft of net technical capacity
  • Total customer power: 3MW
  • Percentage occupied: 10% (at time of re-opening in 2023)
  • Networks available on site: 9 – BT, Virgin, SSE, Verizon, Gamma, CenturyLink (Level3), Cogent, TalkTalk, Metronet, euNetworks
  • Standard power: 4-7kW per rack as standard, but flexibility to provide up to 20kW
  • The facility was Former Hardy Fisher data centre, acquired by Atlas Edge in 2022
  • Relaunched in 2023 further to a complete £13m refurbishment
  • a high-quality, 200-rack, Tier 3 facility

Key features of the upgrade works include a second and fully diverse incoming power feed at 11kV with 3.4MW currently available, further generators to upgrade to n+n, separate UPS rooms, enhanced security fencing, and 24/7 on-site security.

Map and Nearby Locations

Cornelius House ( Gelderd Close )
Templus Sites
Nearby Facilities

Templus: Leeds LEE01 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Templus: Leeds LEE01

Distance Site About
0.47 miles Gridjet: DC4 & DC5
Gridjet Datacentre Ltd operates a strategically located facility in Leeds, UK, providing a versatile infrastructure across two distinct data halls.
1.67 miles aql: Leeds DC5
DC5 Canon House is aql’s purpose-built High-Performance Computing (HPC) hub, situated approximately half a mile from the Salem Chapel campus.
1.95 miles Lumen: Leeds (Sterling House)
1.96 miles aql: Leeds DC3
aql's DC3 in the restored 18th-century Salem Chapel on Hunslet Road, Leeds, home of the IXLeeds internet exchange.
1.99 miles aql: Leeds DC2
aql's original Leeds data centre halls (DC1 and DC2) at 11-15 Hunslet Road, opposite the Salem Chapel that houses DC3 and IXLeeds.
3.73 miles Asanti: Leeds
The Asanti Leeds data centre was acquired from Daisy Group in November 2022. The facility (formerly known as Daisy Birstall) was already operational prior to the acquisition.
3.83 miles ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.90 miles HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.96 miles Point BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.97 miles Virgin Media Leeds (Temple House)
6.21 miles C.C.S. DC14 - Leeds
7.38 miles Photonic Networks: Bradford
Photonic Networks' Bradford data centre, formerly Legend Internet, offers colocation and hosting in a converted mill on Sunbridge Road, about half a kilometre from Bradford city centre.
7.50 miles Deep Green: Bradford
Data center company Deep Green is set to build a new facility in Bradford, West Yorkshire, United Kingdom.
8.42 miles Node4: Leeds
9.40 miles nLighten Leeds (Wakefield)
9.92 miles HSBC: Wakefield Global Data Centre
HSBC's Wakefield Global Data Centre in Normanton, West Yorkshire, is a group data centre for the bank, set inside a secure compound on the Normanton Industrial Estate.
11.38 miles Stellanor: Elland TC4
The facility located at Unit J1, Lowfields Business Park in Elland is a high-specification data center that was acquired by Stellanor Datacenters from Redcentric in late 2025.
12.81 miles Bowmer & Kirkland: Ferrybridge
A four-building data centre campus planned by Bowmer & Kirkland on the former Ferrybridge C power station coal yard near Knottingley, West Yorkshire, beside the Ferrybridge grid substation.
13.24 miles Copley Data Center
Lloyds Banking Group's former data centre at Copley, near Halifax. Lloyds left the site in 2025.
13.57 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.77 miles Redcentric: Harrogate
This was Redcentric's Harrogate data centre. Redcentric closed it in March 2024.
19.23 miles Global ValleyInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Templus is a carrier-neutral regional colocation platform launched in Spain in 2024 by Teras Capital, with backing from ICG. It runs 17 data centres in eight countries with more than 65 MW, including nine bought from AtlasEdge and three bought from Grupo Aire in 2026.

In Spain it operates MAD01 in Alcalá de Henares, MAD02 and MAD03 in Madrid, BCN01 and BCN02 on a joint L'Hospitalet campus, MAL01 in Málaga, SEV01 in Seville and VAL01 in Paterna, and is building CEU01 in the port of Ceuta. Its headquarters are in Alcalá de Henares.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Drax, Brookfield and Radiant to Develop 1GW Data Center at Selby
[Drax Group](https://baxtel.com/data-centers/drax-group) will develop up to 1GW of data center capacity at its North Yorkshire power station with [Brookfield](https://baxtel.com/data-centers/brookf...

Drax, Brookfield and Radiant to Develop 1GW Data Center at Selby

November 03, 2026 Drax Group

Drax Group will develop up to 1GW of data center capacity at its North Yorkshire power station with Brookfield and Radiant. The deal was announced on Nov. 3. Brookfield estimates investment in the site could exceed £20 billion ($26.8 billion), including £2.5 billion for the first phase. Phase one...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.