HSBC: Wakefield Global Data Centre

Latest Podcast Premier Way North
Operational
Fully operational facility
Operated by: HSBC

HSBC: Wakefield Global Data Centre

Utility Provider: Northern Powergrid
Ownership: HSBC unknown the building.
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

HSBC runs its Wakefield Global Data Centre inside a fenced, secure compound of about 11 hectares on the Normanton Industrial Estate, part of the Wakefield Europort area east of Wakefield. The site holds one large data hall building with plant compounds alongside. HSBC job postings for the site describe diesel generators, DRUPS and UPS backup, and a chilled water cooling system. HSBC has not published the facility's capacity.

Map and Nearby Locations

Premier Way North
HSBC Sites
Nearby Facilities

Sites within 15 miles of HSBC: Wakefield Global Data Centre

Distance Site About
0.88 miles nLighten Leeds (Wakefield)
1.50 miles Node4: Leeds
4.11 miles Bowmer & Kirkland: Ferrybridge
A four-building data centre campus planned by Bowmer & Kirkland on the former Ferrybridge C power station coal yard near Knottingley, West Yorkshire, beside the Ferrybridge grid substation.
6.65 miles GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.71 miles Prime StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.79 miles Plaza PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.85 miles aql: Leeds DC5
DC5 Canon House is aql’s purpose-built High-Performance Computing (HPC) hub, situated approximately half a mile from the Salem Chapel campus.
9.05 miles aql: Leeds DC3
aql's DC3 in the restored 18th-century Salem Chapel on Hunslet Road, Leeds, home of the IXLeeds internet exchange.
9.08 miles aql: Leeds DC2
aql's original Leeds data centre halls (DC1 and DC2) at 11-15 Hunslet Road, opposite the Salem Chapel that houses DC3 and IXLeeds.
9.12 miles Virgin Media Leeds (Temple House)
9.14 miles C.C.S. DC14 - Leeds
9.31 miles Lumen: Leeds (Sterling House)
9.70 miles Gridjet: DC4 & DC5
Gridjet Datacentre Ltd operates a strategically located facility in Leeds, UK, providing a versatile infrastructure across two distinct data halls.
9.92 miles Templus: Leeds LEE01
Templus bought this Tier 3 standard data centre from AtlasEdge in May 2026. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.
10.26 miles CentralInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.40 miles Asanti: Leeds
The Asanti Leeds data centre was acquired from Daisy Group in November 2022. The facility (formerly known as Daisy Birstall) was already operational prior to the acquisition.
14.14 miles Pulsant: Rotherham YH-1
14.60 miles Energy Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.81 miles Drax: Selby 1
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
15.99 miles Drax: Selby Expansion
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
16.95 miles Photonic Networks: Bradford
Photonic Networks' Bradford data centre, formerly Legend Internet, offers colocation and hosting in a converted mill on Sunbridge Road, about half a kilometre from Bradford city centre.
17.06 miles Deep Green: Bradford
Data center company Deep Green is set to build a new facility in Bradford, West Yorkshire, United Kingdom.
18.17 miles Stellanor: Elland TC4
The facility located at Unit J1, Lowfields Business Park in Elland is a high-specification data center that was acquired by Stellanor Datacenters from Redcentric in late 2025.
19.93 miles Parseq: Rotherham

Operating Company

Operated by: HSBC

HSBC Bank plc is one of the largest banking and financial services organizations in the world. HSBC's international network comprises around 7,500 offices in over 80 countries and territories

0
Facilities
0
Markets

News See all

Read Drax, Brookfield and Radiant to Develop 1GW Data Center at Selby
[Drax Group](https://baxtel.com/data-centers/drax-group) will develop up to 1GW of data center capacity at its North Yorkshire power station with [Brookfield](https://baxtel.com/data-centers/brookf...

Drax, Brookfield and Radiant to Develop 1GW Data Center at Selby

November 03, 2026 Drax Group

Drax Group will develop up to 1GW of data center capacity at its North Yorkshire power station with Brookfield and Radiant. The deal was announced on Nov. 3. Brookfield estimates investment in the site could exceed £20 billion ($26.8 billion), including £2.5 billion for the first phase. Phase one...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.