Bowmer & Kirkland: Ferrybridge

Latest Podcast Former Ferrybridge C Power Station coal yard, Kirkhaw Lane
Planned
Future facility in planning stage
Operated by:

Bowmer & Kirkland: Ferrybridge

Site planned for 2029 and has expansions through 2032
Utility Provider: National Grid Electricity Transmission
Lot Size: 40 acres

The campus is planned inside the old rail loop of the former Ferrybridge C power station coal yard, between the A1(M) and the River Aire. Wakefield Council approved reserved matters for four data centre buildings in July 2025. The plans include a campus substation drawn with National Grid 275 kV connections, next to the existing Ferrybridge grid substation. Mountpark, the master developer of the wider coal yard, is the landowner. No end user has been named.

Site History

  • In October 2026, Wakefield Council approved a non-material change to the campus substation.
  • In October 2025, Mountpark said Zone A of the coal yard was being taken forward for a data centre.
  • In July 2025, Wakefield Council approved reserved matters for four data centre buildings.
  • In October 2024, the reserved matters application for the data centre campus was submitted.

Project Profile

  • Four data centre buildings of about 51,200 m² each.

Map and Nearby Locations

Former Ferrybridge C Power Station coal yard, Kirkhaw Lane
Bowmer & Kirkland Sites
Nearby Facilities

Bowmer & Kirkland: Ferrybridge Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Bowmer & Kirkland: Ferrybridge

Distance Site About
4.11 miles HSBC: Wakefield Global Data Centre
HSBC's Wakefield Global Data Centre in Normanton, West Yorkshire, is a group data centre for the bank, set inside a secure compound on the Normanton Industrial Estate.
4.99 miles nLighten Leeds (Wakefield)
5.19 miles Node4: Leeds
6.48 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.98 miles Global TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.05 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.13 miles Point BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.96 miles C.C.S. DC14 - Leeds
10.04 miles Virgin Media Leeds (Temple House)
11.42 miles aql: Leeds DC5
DC5 Canon House is aql’s purpose-built High-Performance Computing (HPC) hub, situated approximately half a mile from the Salem Chapel campus.
11.48 miles aql: Leeds DC3
aql's DC3 in the restored 18th-century Salem Chapel on Hunslet Road, Leeds, home of the IXLeeds internet exchange.
11.49 miles aql: Leeds DC2
aql's original Leeds data centre halls (DC1 and DC2) at 11-15 Hunslet Road, opposite the Salem Chapel that houses DC3 and IXLeeds.
11.70 miles Lumen: Leeds (Sterling House)
11.86 miles Drax: Selby 1
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
11.99 miles Drax: Selby Expansion
Drax Group is set to transform its historic Selby Power Station in North Yorkshire into a massive digital infrastructure hub, leveraging legacy infrastructure to meet the booming power demands of artificial intelligence.
12.49 miles Gridjet: DC4 & DC5
Gridjet Datacentre Ltd operates a strategically located facility in Leeds, UK, providing a versatile infrastructure across two distinct data halls.
12.81 miles Templus: Leeds LEE01
Templus bought this Tier 3 standard data centre from AtlasEdge in May 2026. After acquiring the largest purpose-built data centre in Leeds in 2022, AtlasEdge has since invested more than £13 million to transform the site.
12.81 miles Energy Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.96 miles Asanti: Leeds
The Asanti Leeds data centre was acquired from Daisy Group in November 2022. The facility (formerly known as Daisy Birstall) was already operational prior to the acquisition.
15.45 miles Pulsant: Rotherham YH-1
18.69 miles iomart: DC11 York
The iomart DC11 York data center became part of the iomart network in September 2018 through the acquisition of the York-based hosting provider Bytemark.

Operating Company

Operated by:

Bowmer + Kirkland is a family-owned and family-run construction and development group. It was founded by a bricklayer and a joiner in 1923 and is headquartered at High Edge Court in Heage, near Belper, Derbyshire. The B+K Group is made up of 18 businesses covering construction-related services, and it works across the UK through a network of regional offices. The company says it has secured projects worth more than £4.3 billion over the past five years, with about three quarters of that work for returning clients.

In data centres, a group subsidiary is the applicant behind a four-building campus on the former Ferrybridge C power station coal yard near Knottingley, West Yorkshire, which Wakefield Council approved in 2025.

0
Facilities
0
Markets

News See all

Read Drax, Brookfield and Radiant to Develop 1GW Data Center at Selby
[Drax Group](https://baxtel.com/data-centers/drax-group) will develop up to 1GW of data center capacity at its North Yorkshire power station with [Brookfield](https://baxtel.com/data-centers/brookf...

Drax, Brookfield and Radiant to Develop 1GW Data Center at Selby

November 03, 2026 Drax Group

Drax Group will develop up to 1GW of data center capacity at its North Yorkshire power station with Brookfield and Radiant. The deal was announced on Nov. 3. Brookfield estimates investment in the site could exceed £20 billion ($26.8 billion), including £2.5 billion for the first phase. Phase one...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.