|
1.88 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
4.60 miles
|
Aruba: IT3 DC-B
|
|
|
4.67 miles
|
Aruba: IT3 DC-D
|
DC-D is the fourth building on Aruba's IT3 campus in Ponte San Pietro, under construction in the last unconverted Legler mill shed (about 15,000 m²) at the south-west of the site.
|
|
4.80 miles
|
Aruba: IT3 DC-C
|
|
|
4.83 miles
|
Aruba: IT3 DC-A
|
First data center on Aruba's IT3 campus in Ponte San Pietro: a converted Legler mill shed at the north end of the site with 10 data rooms, groundwater cooling and rooftop solar.
|
|
4.90 miles
|
Aruba: IT3 DC-E
|
DC-E was a fifth data center building that Aruba planned for its IT3 campus in Ponte San Pietro. Aruba dropped it, and the campus's approved final layout has four data center buildings.
|
|
7.76 miles
|
Vitali: Arcene Innovation Hub
|
The Vitali group plans a data center on farmland between the railway halt and the Terna substation in Arcene, south of Bergamo.
|
|
12.44 miles
|
Echelon: LIN10 Bldg-1
|
LIN10 Bldg-1 is the first phase of Echelon's LIN10 campus, a planned conversion of a former printing plant at Via della Costa 2, Treviglio.
|
|
12.49 miles
|
Echelon: LIN10 Bldg-2
|
LIN10 Bldg-2 is a proposed second, larger data center building on Echelon's LIN10 campus in Treviglio, east of Milan.
|
|
13.73 miles
|
A2A: Cassano d'Adda
|
A2A plans a data center on a former railway yard beside its Cassano d'Adda power station, east of Milan.
|
|
15.66 miles
|
QTS: Vimercate, Milan
|
QTS plans a three-building data center campus on the former IBM plant in Vimercate, north-east of Milan.
|
|
15.82 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
16.67 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
17.82 miles
|
Stack: MIL09A
|
MIL09 is STACK's planned single-building data center campus in Melzo, east of Milan, on a former printing plant site.
|
|
18.26 miles
|
Stack: MIL06A
|
MIL06A is the larger of two buildings on STACK's MIL06 campus in Liscate, east of Milan.
|
|
18.31 miles
|
Stack: MIL06B
|
MIL06B is the smaller of two buildings on STACK's MIL06 campus in Liscate, east of Milan.
|
|
18.51 miles
|
Stack: MIL10
|
MIL10 is a STACK data center campus planned in Liscate, east of Milan.
|
|
19.04 miles
|
Stack: MIL05A
|
MIL05A is the larger of two buildings on STACK's MIL05 campus in Vignate, east of Milan.
|
|
19.21 miles
|
Stack: MIL05B
|
MIL05B is the smaller of two buildings on STACK's MIL05 campus in Vignate, east of Milan.
|
|
19.72 miles
|
Campus PrimeInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
19.73 miles
|
Noovle: Cassina de' Pecchi
|
Noovle's Milano Est data center in Cassina de' Pecchi, east of Milan, hosts one of the zones of Google Cloud's Milan region.
|
|
19.74 miles
|
TI Sparkle: Milan Cassina de' Pecchi
|
Sparkle's Milan data center sits on TIM's Malpaga campus at Cassina de' Pecchi, east of Milan, and hosts its international network node and colocation.
|