Aruba: IT3 DC-A

Latest Podcast Via San Clemente 53
Operational
Fully operational facility
Operated by:

Aruba: IT3 DC-A

Short Code: DC-A
Year Built: 2017
Utility Provider: E-Distribuzione
Lot Size: 49 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

DC-A is the first data center building on Aruba's IT3 campus in Ponte San Pietro. Aruba converted the northernmost Legler mill shed, with a seismic retrofit.

DC-A Features

  • Total surface area: 17,600 m²
  • Data hall surface area: 8,050 m², 10 independent data rooms
  • Connection points to utilities: 2
  • UPS: 2N+1, double-conversion static, 500 kVA modules
  • Generators: 2N diesel, 25 units of about 1.36 MW each
  • Full load run time: 26 h in emergency conditions, 52 h in standard conditions
  • Cooling: open-loop groundwater, 2N heat exchangers, air/water chillers in emergency mode
  • Solar: rooftop and facade PV of about 2.4 MWp
  • ANSI/TIA-942-B Rating 4, ISO 22237

Map and Nearby Locations

Via San Clemente 53
Aruba S.p.A. Sites
Nearby Facilities

Aruba: IT3 DC-A Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aruba: IT3 DC-A

Distance Site About
0.06 miles Aruba: IT3 DC-C
0.14 miles Aruba: IT3 DC-E
DC-E was a fifth data center building that Aruba planned for its IT3 campus in Ponte San Pietro. Aruba dropped it, and the campus's approved final layout has four data center buildings.
0.23 miles Aruba: IT3 DC-D
DC-D is the fourth building on Aruba's IT3 campus in Ponte San Pietro, under construction in the last unconverted Legler mill shed (about 15,000 m²) at the south-west of the site.
0.28 miles Aruba: IT3 DC-B
4.83 miles Retelit: Bergamo
Retelit runs a small data center in the Centro Galassia business park on Via Bellafino in Bergamo.
6.57 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.12 miles Vitali: Arcene Innovation Hub
The Vitali group plans a data center on farmland between the railway halt and the Terna substation in Arcene, south of Bergamo.
12.31 miles QTS: Vimercate, Milan
QTS plans a three-building data center campus on the former IBM plant in Vimercate, north-east of Milan.
13.07 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.54 miles Echelon: LIN10 Bldg-1
LIN10 Bldg-1 is the first phase of Echelon's LIN10 campus, a planned conversion of a former printing plant at Via della Costa 2, Treviglio.
13.55 miles Echelon: LIN10 Bldg-2
LIN10 Bldg-2 is a proposed second, larger data center building on Echelon's LIN10 campus in Treviglio, east of Milan.
13.78 miles A2A: Cassano d'Adda
A2A plans a data center on a former railway yard beside its Cassano d'Adda power station, east of Milan.
16.94 miles Stack: MIL09A
MIL09 is STACK's planned single-building data center campus in Melzo, east of Milan, on a former printing plant site.
17.11 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.40 miles Stack: MIL06A
MIL06A is the larger of two buildings on STACK's MIL06 campus in Liscate, east of Milan.
17.44 miles Stack: MIL06B
MIL06B is the smaller of two buildings on STACK's MIL06 campus in Liscate, east of Milan.
17.69 miles Stack: MIL05A
MIL05A is the larger of two buildings on STACK's MIL05 campus in Vignate, east of Milan.
17.80 miles Stack: MIL10
MIL10 is a STACK data center campus planned in Liscate, east of Milan.
17.86 miles Stack: MIL05B
MIL05B is the smaller of two buildings on STACK's MIL05 campus in Vignate, east of Milan.
18.16 miles Campus MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
18.17 miles Noovle: Cassina de' Pecchi
Noovle's Milano Est data center in Cassina de' Pecchi, east of Milan, hosts one of the zones of Google Cloud's Milan region.
18.18 miles TI Sparkle: Milan Cassina de' Pecchi
Sparkle's Milan data center sits on TIM's Malpaga campus at Cassina de' Pecchi, east of Milan, and hosts its international network node and colocation.

Aruba: IT3 DC-A Data Center Photos See all

Campus with mountains in the background
Source: Aruba.it
Entrance
Source: Aruba.it
DC-A, DC-B, DC-C, DC-D, DC-E, and the Hydroelectric Plant on the campus
IT3 Campus with Building Labeled
Source: Aruba.it

DC-A, DC-B, DC-C, DC-D, DC-E, and the Hydroelectric Plant on the campus

Entrance to DC-A
Source: Baxtel
Photo taken in 2017
Another view of Datacenter A
Source: Baxtel

Photo taken in 2017

Modern Turnstyle
Source: Baxtel
Freight Elevator
Source: Baxtel
Hall way that leads to the Data Halls
Source: Baxtel
Empty Data Hall ready for customer deployments
Source: Baxtel
Stacked Power Infrastructure
Source: Baxtel
Chiller Plant
Source: Baxtel
Aruba Hydroelectric plant on the River Brembo helps to power the data center campus
Source: Baxtel
Bridge to Electrical Plant
Source: Baxtel
Dam for hydro power
Source: Baxtel
Hydro Turbine
Source: Baxtel
Turbine Room
Source: Baxtel
Map of the Campus
Source: Baxtel
Aruba owned facilities are in orange
Map of Aruba Cloud's Facilities
Source: Aruba.it

Aruba owned facilities are in orange

Operating Company

Operated by:

Aruba S.p.A., founded in 1994, is the largest Web service company in Italy. Aruba offers 4 main services: Hosting and Domains, e-Security, Cloud and Data Center services. The company is also active within major European markets such as the French, UK and German market, and claims leadership in the Czech Republic and Slovakia and a consolidated presence in Poland and Hungary.

Aruba manages over 2.1 million domains, over 7.4 million email accounts, over 4.1 million PEC accounts, 31.000 servers and a total of over 4.7 million customers. In addition, Arbua provides dedicated server, housing and colocation services, managed services, digital signature, digital preservation and smart cards. In 2011 the company began offering Cloud services. Aruba has extensive experience in managing data centers with a European network capable of hosting over 60.000 servers.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read CBRE Forecasts Milan Will Add 255MW and Pass Dublin as Europe's Fifth Market
CBRE forecasts 255MW of new data center capacity in Milan by 2028, which would move the city ahead of Dublin as Europe's fifth-largest market. The forecast appears in CBRE's [Q3 2026 European Data ...

CBRE Forecasts Milan Will Add 255MW and Pass Dublin as Europe's Fifth Market

November 17, 2026 Milan

CBRE forecasts 255MW of new data center capacity in Milan by 2028, which would move the city ahead of Dublin as Europe's fifth-largest market. The forecast appears in CBRE's Q3 2026 European Data Centres report, which puts Milan and Dublin about 100MW of operational capacity apart at the...

Read more
Read Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law
More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, [Il Giorno](https://www.ilgiorno.it/milano/cronaca/data-center-protesta...

Milan Data Center Protest Draws Over 1,000 As Lombardy Plans Stricter Law

November 10, 2026 Milan

More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, Il Giorno reported. The rally was the first national demonstration called by the National Network of Stop Data Center Committees. Organizers want the national government...

Read more
Read Greenfield And Finsbury Infrastructure To Invest €360M In Milan Data Center
UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW ...

Greenfield And Finsbury Infrastructure To Invest €360M In Milan Data Center

September 08, 2026 Milan

UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW of power capacity for the site, which will support AI, cloud, and enterprise workloads while...

Read more
Read Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project
Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

Magnora Secures Milan-Area Land for 30 MW Data Center, Its Second Italy Project

May 18, 2026 Magnora

Norwegian renewables and data center developer Magnora ASA has secured land for a new 30 MW data center project in the Milan area, the company announced on Monday. The wholly owned project is Magnora's second in Italy and brings its data center development portfolio to 585 MW gross and 460 MW...

Read more
Read Aruba announces launch date for delayed Rome data center
Aruba announces launch date for delayed Rome data center

Aruba announces launch date for delayed Rome data center

July 22, 2022 Aruba S.p.A.

Aruba has announced a new completion date for its delayed Rome data center, Hyper Cloud Data Center (IT4). When complete, it will be the largest in Rome, comprising five independent 6MW data centers, totaling 30MW with 2N redundancy at full build-out. Although first announced in 2018 and...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.