0.27 miles
|
Digital Realty: Dublin 2
|
|
|
0.72 miles
|
Echelon: DUB12
|
Echelon's DUB12 marks the third building of its Clondalkin campus.
|
|
0.73 miles
|
Echelon: DUB11
|
Echelon's DUB11 marks the second building of its Clondalkin campus, following the energization of the first building in Q4 2023.
|
|
0.75 miles
|
Echelon: DUB10
|
Echelon’s DUB10 campus will provide 90MW+ of IT load and includes a grid substation as well as on-site power generation.
|
|
0.83 miles
|
Echelon: DUB13
|
Echelon Data Centres has challenged a South Dublin County Council (SDCC) ruling to block the expansion of its DUB10 data center campus in Clondalkin, Dublin, Ireland.
|
|
2.69 miles
|
East TowerInterested in this information?Contact us
|
The Amazon AWS site is a former Tesco storage facility at Greenhills Industrial Estate in Dublin 24.
|
|
2.70 miles
|
Tower OneInterested in this information?Contact us
|
|
|
2.72 miles
|
BetaInterested in this information?Contact us
|
|
|
2.77 miles
|
GlobalInterested in this information?Contact us
|
|
|
2.86 miles
|
Echelon: DUB 40
|
Echelon Data Centres’ DUB40 is planned to be located outside of Dublin, in a data center cluster known as Grange Castle.
|
|
2.87 miles
|
PrimeInterested in this information?Contact us
|
|
|
3.08 miles
|
CyrusOne Dublin Grange Castle
|
Approved in October 2018, CyrusOne is building a three building campus with 74 MW of power.
|
|
3.14 miles
|
PointInterested in this information?Contact us
|
A stand-alone Microsoft data centre in its own compound on the Grange Castle campus in west Dublin, about 81,900 sq ft, running by 2022.
|
|
3.16 miles
|
TowerInterested in this information?Contact us
|
The first building on Microsoft's second Grange Castle campus in west Dublin, a 229,800 sq ft single-storey data centre completed in 2015.
|
|
3.21 miles
|
Digital Realty: DUB3
|
Located in the Grange Castle data centre cluster, the DUB3 data center offers 59,202 sqft of space and power densities of up to 2kW per square meter, with 4.6MW available for the entire data center.
|
|
3.22 miles
|
Digital Realty: DUB4
|
Digital Realty's DUB4 data center is situated in Grand Castle Park, Dublin, next to its DUB3 facility.
|
|
3.24 miles
|
Equinix: DB8
|
Equinix was planning to construct a facility at Profile Park, Nangor Road, Clondalkin in Dublin. The site was originally planned to be powered by the electric grid, but after failing to secure a permanent supply, Equinix adjusted the proposal to use gas power.
|
|
3.25 miles
|
Equinix Dublin DB2
|
Located in Grange Castle business park, DB2 is a former Telecity site that was acquired by Equinix in January 2016.
|
|
3.30 miles
|
CenterInterested in this information?Contact us
|
One of a pair of identical single-storey Microsoft data centres, with DUB08, on the second Grange Castle campus in west Dublin, built in 2017 and 2018.
|
|
3.30 miles
|
Station OneInterested in this information?Contact us
|
One of a pair of identical single-storey Microsoft data centres, with DUB07, on the second Grange Castle campus in west Dublin, built in 2017 and 2018.
|
|
3.35 miles
|
Vantage: DUB 13
|
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
|
|
3.43 miles
|
Equinix: Citywest Dublin
|
The BT data centre is adjacent to Equinix's DB1 site.
|
|
3.43 miles
|
Equinix Dublin DB1
|
|
|
3.44 miles
|
K2: DUB 6
|
K2 Data Centers completed the purchase of a 4.6-acre site in Citywest Business Park, Dublin, in July 2020 for approximately €3 million.
|
|
3.46 miles
|
Vantage: DUB11
|
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
|
|
3.46 miles
|
Digital Profile Park Dublin
|
Digital Realty owns the 10 acre site at Profile Park and will have access to both power and fiber. The company has secured planning approval to construct 193,384 gross sq ft in two phases and over four buildings.
|
|
3.48 miles
|
Metro CenterInterested in this information?Contact us
|
One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.
|
|
3.48 miles
|
Digital Realty: DUB14
|
Digital Realty opened its second data center on the Profile Park campus in Dublin, Ireland in 2019.
|
|
3.48 miles
|
CoreInterested in this information?Contact us
|
One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.
|
|
3.48 miles
|
Vantage: DUB 12
|
This facility is part of Vantage's DUB1 Campus in Dublin, Ireland.
|
|
3.50 miles
|
Station ThreeInterested in this information?Contact us
|
One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.
|
|
3.51 miles
|
Digital Realty: DUB15
|
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
|
|
3.51 miles
|
Park PlusInterested in this information?Contact us
|
The last of four single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, completed in 2021.
|
|
3.53 miles
|
Digital Realty: DUB16
|
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
|
|
3.63 miles
|
Edge PointInterested in this information?Contact us
|
One of two two-storey Microsoft data centres, with DUB15, at the west end of the Grange Castle campus in Dublin. Its first of five data halls went live in July 2023.
|
|
3.65 miles
|
Edgeconnex: DUB03
|
|
|
3.67 miles
|
CoreInterested in this information?Contact us
|
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
|
|
3.67 miles
|
East PointInterested in this information?Contact us
|
One of two two-storey Microsoft data centres, with DUB14, at the west end of the Grange Castle campus in Dublin, supported by an on-site gas generation compound.
|
|
3.68 miles
|
Edgeconnex: DUB02
|
|
|
3.69 miles
|
UltraInterested in this information?Contact us
|
|
|
3.69 miles
|
Keppel DC Dublin1
|
|
|
3.70 miles
|
Plaza UltraInterested in this information?Contact us
|
Microsoft's first data centre outside the US, a 303,000 sq ft two-storey building at Grange Castle in west Dublin, opened July 2009.
|
|
3.70 miles
|
StationInterested in this information?Contact us
|
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
|
|
3.70 miles
|
EdgeConnex DUB01
|
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
|
|
3.76 miles
|
TwoInterested in this information?Contact us
|
Microsoft's second Dublin data centre, a 112,000 sq ft single-storey Gen 4 modular building joined to the west end of DUB03 at Grange Castle, online at the end of 2012.
|
|
3.77 miles
|
ParkInterested in this information?Contact us
|
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
|
|
3.78 miles
|
Cloud PointInterested in this information?Contact us
|
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
|
|
3.79 miles
|
Park PrimeInterested in this information?Contact us
|
Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle.
|
|
3.80 miles
|
NorthInterested in this information?Contact us
|
Microsoft's third data centre on its original Grange Castle campus in west Dublin, a 169,000 sq ft single-storey building completed in spring 2014.
|
|
3.82 miles
|
Point ThreeInterested in this information?Contact us
|
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
|
|
3.86 miles
|
CyrusOne : DUB I Bldg 2
|
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
|
|
3.91 miles
|
EdgeConnex DUB04
|
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
|
|
3.92 miles
|
CyrusOne : DUB I Bldg 3
|
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
|
|
3.93 miles
|
CyrusOne Dublin I
|
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
|
|
3.99 miles
|
EdgeConnex DUB05
|
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
|
|
4.74 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
4.80 miles
|
Edge StationInterested in this information?Contact us
|
|
|
4.81 miles
|
West StationInterested in this information?Contact us
|
|
|
4.87 miles
|
Keppel Dublin 2
|
Built in 2013, Keppel acquired the Ballycoolin site – previously owned by Dataplex – in 2017.
|
|
4.88 miles
|
EastInterested in this information?Contact us
|
|
|
4.91 miles
|
Equinix: DB7x
|
Equinix has begun construction of its DB7x data center at its Blanchardstown campus in Profile Park, Grange Castle Business Park, Clondalkin, Dublin, Ireland, with the facility expected to deliver initial capacity by early 2028. Based on cost benchmarks, the project is estimated to provide 9MW of IT load, serving as a retail IBX expansion leveraging existing campus infrastructure.
|
|
4.91 miles
|
Equinix: DB6x
|
DB6x is part of a three-building campus(DB5x, DB6x, DB7x) proposed in a 2020 planning application.
|
|
4.93 miles
|
Equinix: DB5x
|
Equinix's fifth data center in Ireland opened in Q4 2022, located in the former Clyde House in Blanchardstown.
|
|
5.01 miles
|
K2 Dublin 1
|
|
|
5.03 miles
|
K2: DUB 4
|
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
|
|
5.09 miles
|
K2: DUB 5
|
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
|
|
5.11 miles
|
Pure DC: DUB 01
|
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
|
|
5.12 miles
|
Pure DC: DUB 02
|
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
|
|
5.14 miles
|
Pure DC: DUB 03
|
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
|
|
5.20 miles
|
Servecentric Blanchardstown
|
|
|
5.30 miles
|
Equinix: Ballycoolin
|
The Ballycoolin data center is a 40,000 sq ft (3,716 sqm) facility on Dublin's north side. It has 7,000 sq ft (650 sqm) of fully allocated data halls.
|
|
5.37 miles
|
Equinix Dublin DB3
|
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
|
|
5.38 miles
|
Blanchardstown Dublin - Digital Realty
|
Digital Realty’s Blanchardstown Data Centre is a Tier Ill designed building, the two-story building is 120,000sqft. The facility also hosts Servecentric Blanchardstown in the building.
|
|
5.40 miles
|
Center TwoInterested in this information?Contact us
|
|
|
5.41 miles
|
Equinix Dublin DB4
|
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
|
|
5.47 miles
|
Kyndryl: Dublin
|
|
|
5.54 miles
|
Tower PlusInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
5.58 miles
|
PrimeInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
5.60 miles
|
Energia: Huntstown, Dublin
|
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
|
|
5.61 miles
|
Energia: Huntstown 2
|
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
|
|
5.63 miles
|
Station PlusInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
5.66 miles
|
Core CampusInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
5.70 miles
|
Metro PointInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
5.72 miles
|
OneInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
5.76 miles
|
Core CampusInterested in this information?Contact us
|
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
|
|
6.35 miles
|
Park PrimeInterested in this information?Contact us
|
Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.
|
|
6.42 miles
|
CoreInterested in this information?Contact us
|
This data center is a part of Meta's Clonee Campus in Ireland.
|
|
6.51 miles
|
Cloud PointInterested in this information?Contact us
|
This data center is a part of Meta's Clonee Campus in Ireland.
|
|
6.68 miles
|
South PlazaInterested in this information?Contact us
|
This data center is a part of Meta's Clonee Campus in Ireland.
|
|
6.79 miles
|
BetaInterested in this information?Contact us
|
This data center is a part of Meta's Clonee Campus in Ireland.
|
|
7.21 miles
|
EngineNode: Meath DC4
|
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
|
7.28 miles
|
EngineNode: Meath DC3
|
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
|
7.38 miles
|
EngineNode: Meath DC2
|
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
|
7.50 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
7.52 miles
|
EngineNode Meath
|
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
|
|
7.52 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.54 miles
|
Park PlusInterested in this information?Contact us
|
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
|
|
7.56 miles
|
Metro ValleyInterested in this information?Contact us
|
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
|
|
7.56 miles
|
Digital Realty: Clonshaugh
|
Located within easy access of Dublin Airport, via city’s many transport links, Digital Realty’s Clonshaugh data centers (DUB11 and DUB12) provide 10,219m2(110,000f 2) of highly-connected premium customer space.
|
|
7.57 miles
|
Plaza BetaInterested in this information?Contact us
|
|
|
7.59 miles
|
Plaza MaxInterested in this information?Contact us
|
|
|
7.61 miles
|
ValleyInterested in this information?Contact us
|
|
|
7.62 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.64 miles
|
BetaInterested in this information?Contact us
|
|
|
7.66 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
7.67 miles
|
GTT Dublin International Exchange Center
|
|
|
7.79 miles
|
Vodafone Dublin
|
|
|
7.80 miles
|
Verizon Dublin
|
|
|
7.84 miles
|
Core TowerInterested in this information?Contact us
|
|
|
7.89 miles
|
Valley OneInterested in this information?Contact us
|
|
|
16.02 miles
|
North HubInterested in this information?Contact us
|
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
|
|
16.08 miles
|
West PlazaInterested in this information?Contact us
|
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
|
|
16.13 miles
|
Park OneInterested in this information?Contact us
|
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
|
|
16.18 miles
|
Core TowerInterested in this information?Contact us
|
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
|
|
16.18 miles
|
South CenterInterested in this information?Contact us
|
The facility will be part of Microsoft's Herbata Campus in County Kildare, southwest of Dublin.
|
|
16.28 miles
|
East PointInterested in this information?Contact us
|
Microsoft is expanding its Irish data center footprint with a new campus in County Kildare, southwest of Dublin.
|