Digital Realty: Clonshaugh

Latest Podcast Clonshaugh Industrial Estate Clonshaugh Business & Technology Park
Operational
Fully operational facility
Operated by:

Digital Realty: Clonshaugh

Short Code: DUB11,DUB12
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Located within easy access of Dublin Airport, via city’s many transport links, Digital Realty’s Clonshaugh data centers (DUB11 and DUB12) provide 10,219m2(110,000f 2) of highly-connected premium customer space.

Clonshaugh Facility Technical Overview:


• Total size of data centre 10,219m2(110,000f 2)
• Net customer space 5,372m2(57,823f 2) across 4x data halls
• 4x data floors across 2x floors
• Diverse power routes (in building)
• 2N power supplies at rack level

Connectivity:


• 2x diverse entry points into building
• Meet me room (MMR)
• Access to multiple telecommunication providers

Map and Nearby Locations

Clonshaugh Industrial Estate Clonshaugh Business & Technology Park
Digital Realty Trust Sites
Nearby Facilities

Sites within 15 miles of Digital Realty: Clonshaugh

Distance Site About
0.05 miles Central CenterInterested in this information?Contact us
0.07 miles Hyperscale Data CenterInterested in this information?Contact us
0.09 miles Metro ValleyInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
0.14 miles TwoInterested in this information?Contact us
AWS demolished the existing former Ricoh building and constructed two data center buildings – Data Centre A and Data Centre B – with gross floor areas of c. 12,875 sqm (138,500 sq ft) and c. 1,455 sqm (15,600 sq ft) respectively, on the 3.75-hectare site.
0.15 miles GTT Dublin International Exchange Center
0.15 miles Hyperscale Data CenterInterested in this information?Contact us
0.21 miles Hyperscale Data CenterInterested in this information?Contact us
0.42 miles Plaza PrimeInterested in this information?Contact us
0.45 miles Verizon Dublin
0.51 miles Global PlazaInterested in this information?Contact us
0.52 miles Hub OneInterested in this information?Contact us
0.55 miles Vodafone Dublin
0.59 miles Central ParkInterested in this information?Contact us
0.60 miles West CampusInterested in this information?Contact us
0.66 miles Cloud ParkInterested in this information?Contact us
4.20 miles Energia: Huntstown 2
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
4.28 miles Energia: Huntstown, Dublin
Energia Group subsidiary Huntstown Power Company has been granted planning permission by Fingal County Council to build two data centers adjacent to the Huntstown Power Station in Dublin, Ireland.
5.31 miles Equinix Dublin DB3
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
5.34 miles Pure DC: DUB 03
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
5.39 miles Pure DC: DUB 02
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
5.45 miles Pure DC: DUB 01
Pure Data Centers is developing a campus with three data centers in Blanchardstown, Dublin.
5.53 miles Equinix Dublin DB4
Equinix has 4 colocation data centers in Dublin that were acquired from Telecity in 2016. Equinix operates DB3 and DB4 as a campus.
5.76 miles K2 Dublin 1
5.77 miles Keppel Dublin 2
Built in 2013, Keppel acquired the Ballycoolin site – previously owned by Dataplex – in 2017.
5.91 miles West ParkInterested in this information?Contact us
5.94 miles K2: DUB 4
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
5.95 miles ProInterested in this information?Contact us
5.98 miles K2: DUB 5
K2 Data Centres is building two more three-story data centers in Ballycoolin in Northwest Dublin.
6.05 miles TowerInterested in this information?Contact us
6.08 miles Central RidgeInterested in this information?Contact us
6.22 miles Equinix: DB7x
Equinix has begun construction of its DB7x data center at its Blanchardstown campus in Profile Park, Grange Castle Business Park, Clondalkin, Dublin, Ireland, with the facility expected to deliver initial capacity by early 2028. Based on cost benchmarks, the project is estimated to provide 9MW of IT load, serving as a retail IBX expansion leveraging existing campus infrastructure.
6.25 miles Servecentric Blanchardstown
6.27 miles Equinix: DB6x
DB6x is part of a three-building campus(DB5x, DB6x, DB7x) proposed in a 2020 planning application.
6.29 miles Blanchardstown Dublin - Digital Realty
Digital Realty’s Blanchardstown Data Centre is a Tier Ill designed building, the two-story building is 120,000sqft. The facility also hosts Servecentric Blanchardstown in the building.
6.30 miles ParkInterested in this information?Contact us
6.31 miles Equinix: DB5x
Equinix's fifth data center in Ireland opened in Q4 2022, located in the former Clyde House in Blanchardstown.
6.33 miles Equinix: Ballycoolin
The Ballycoolin data center is a 40,000 sq ft (3,716 sqm) facility on Dublin's north side. It has 7,000 sq ft (650 sqm) of fully allocated data halls.
6.65 miles Hub TwoInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
6.69 miles HubInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
6.74 miles Hub UltraInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
6.75 miles Plaza MaxInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
6.77 miles Point ThreeInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
6.85 miles NorthInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
6.86 miles Tower PlusInterested in this information?Contact us
Amazon's Dublin Mulhuddart Campus is located on a 26-acre piece of land owned by the Irish Industrial Development Authority, close to Facebook's facility at Clonee.
7.51 miles Kyndryl: Dublin
7.56 miles Digital Realty: Dublin 1
7.66 miles Digital Realty: Dublin 2
8.26 miles Echelon: DUB10
Echelon’s DUB10 campus will provide 90MW+ of IT load and includes a grid substation as well as on-site power generation.
8.26 miles Echelon: DUB11
Echelon's DUB11 marks the second building of its Clondalkin campus, following the energization of the first building in Q4 2023.
8.26 miles Echelon: DUB12
Echelon's DUB12 marks the third building of its Clondalkin campus.
8.37 miles Echelon: DUB13
Echelon Data Centres has challenged a South Dublin County Council (SDCC) ruling to block the expansion of its DUB10 data center campus in Clondalkin, Dublin, Ireland.
8.85 miles Station PlusInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
8.90 miles TowerInterested in this information?Contact us
Facebook broke ground on the Clonee data centre in 2016 and the first building became operational in December 2017. The centre is built on a 250-acre site that was formerly two farms adjoining the headquarters of the Kepak meat business.
8.96 miles Park AlphaInterested in this information?Contact us
The Amazon AWS site is a former Tesco storage facility at Greenhills Industrial Estate in Dublin 24.
9.07 miles Point ThreeInterested in this information?Contact us
9.09 miles MetroInterested in this information?Contact us
9.09 miles Cloud TowerInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
9.43 miles Campus MaxInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
9.47 miles ParkInterested in this information?Contact us
9.50 miles EngineNode: Meath DC4
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
9.51 miles PointInterested in this information?Contact us
This data center is a part of Meta's Clonee Campus in Ireland.
9.53 miles MetroInterested in this information?Contact us
9.60 miles EngineNode: Meath DC3
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
9.72 miles EngineNode: Meath DC2
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
9.98 miles EngineNode Meath
The EngineNode campus was proposed in 2019 to the north of the Facebook Clonee data center and south of the Bracetown Business Park.
10.17 miles Echelon: DUB 40
Echelon Data Centres’ DUB40 is planned to be located outside of Dublin, in a data center cluster known as Grange Castle.
10.35 miles CyrusOne Dublin Grange Castle
Approved in October 2018, CyrusOne is building a three building campus with 74 MW of power.
10.43 miles Digital Realty: DUB3
Located in the Grange Castle data centre cluster, the DUB3 data center offers 59,202 sqft of space and power densities of up to 2kW per square meter, with 4.6MW available for the entire data center.
10.46 miles Digital Realty: DUB4
Digital Realty's DUB4 data center is situated in Grand Castle Park, Dublin, next to its DUB3 facility.
10.55 miles Campus PlusInterested in this information?Contact us
The first building on Microsoft's second Grange Castle campus in west Dublin, a 229,800 sq ft single-storey data centre completed in 2015.
10.57 miles Plaza PlusInterested in this information?Contact us
A stand-alone Microsoft data centre in its own compound on the Grange Castle campus in west Dublin, about 81,900 sq ft, running by 2022.
10.66 miles MetroInterested in this information?Contact us
One of a pair of identical single-storey Microsoft data centres, with DUB08, on the second Grange Castle campus in west Dublin, built in 2017 and 2018.
10.70 miles CenterInterested in this information?Contact us
One of a pair of identical single-storey Microsoft data centres, with DUB07, on the second Grange Castle campus in west Dublin, built in 2017 and 2018.
10.71 miles Equinix Dublin DB2
Located in Grange Castle business park, DB2 is a former Telecity site that was acquired by Equinix in January 2016.
10.71 miles Equinix: DB8
Equinix was planning to construct a facility at Profile Park, Nangor Road, Clondalkin in Dublin. The site was originally planned to be powered by the electric grid, but after failing to secure a permanent supply, Equinix adjusted the proposal to use gas power.
10.81 miles Vantage: DUB 13
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
10.83 miles Point MaxInterested in this information?Contact us
One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.
10.83 miles Edgeconnex: DUB03
10.85 miles Central TowerInterested in this information?Contact us
One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.
10.88 miles Edgeconnex: DUB02
10.89 miles North RidgeInterested in this information?Contact us
One of four identical single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, operating by 2020.
10.89 miles K2: DUB 6
K2 Data Centers completed the purchase of a 4.6-acre site in Citywest Business Park, Dublin, in July 2020 for approximately €3 million.
10.91 miles Vantage: DUB11
Vantage is constructing a campus with three data centers outside Dublin, Ireland.
10.91 miles EdgeConnex DUB01
EdgeConnex initially built a 4,500sqm data centre (DUB01) in 2016 and later extended that facility further before adding a new 1,500sqm data hall in 2017.
10.92 miles EastInterested in this information?Contact us
The last of four single-storey Microsoft data centres (DUB09, DUB10, DUB12, DUB13) at Grange Castle in west Dublin, completed in 2021.
10.92 miles Equinix: Citywest Dublin
The BT data centre is adjacent to Equinix's DB1 site.
10.93 miles Equinix Dublin DB1
10.95 miles Vantage: DUB 12
This facility is part of Vantage's DUB1 Campus in Dublin, Ireland.
10.96 miles Digital Profile Park Dublin
Digital Realty owns the 10 acre site at Profile Park and will have access to both power and fiber. The company has secured planning approval to construct 193,384 gross sq ft in two phases and over four buildings.
10.98 miles Digital Realty: DUB14
Digital Realty opened its second data center on the Profile Park campus in Dublin, Ireland in 2019.
10.99 miles EastInterested in this information?Contact us
One of two two-storey Microsoft data centres, with DUB15, at the west end of the Grange Castle campus in Dublin. Its first of five data halls went live in July 2023.
10.99 miles South HubInterested in this information?Contact us
Microsoft's first data centre outside the US, a 303,000 sq ft two-storey building at Grange Castle in west Dublin, opened July 2009.
11.01 miles Digital Realty: DUB15
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
11.03 miles Ridge ProInterested in this information?Contact us
Microsoft's second Dublin data centre, a 112,000 sq ft single-storey Gen 4 modular building joined to the west end of DUB03 at Grange Castle, online at the end of 2012.
11.04 miles Digital Realty: DUB16
Digital Realty seeks 10-year permission to build two data center buildings, known as DUB15 and DUB16, next to the company’s existing facilities on Profile Park’s Nangor Road, Clondalkin.
11.04 miles Hub MaxInterested in this information?Contact us
One of two two-storey Microsoft data centres, with DUB14, at the west end of the Grange Castle campus in Dublin, supported by an on-site gas generation compound.
11.09 miles CoreInterested in this information?Contact us
Microsoft's third data centre on its original Grange Castle campus in west Dublin, a 169,000 sq ft single-storey building completed in spring 2014.
11.11 miles Campus ThreeInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
11.12 miles Valley PrimeInterested in this information?Contact us
11.12 miles Keppel DC Dublin1
11.14 miles EdgeConnex DUB04
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
11.15 miles TwoInterested in this information?Contact us
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
11.16 miles West PointInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
11.17 miles EdgeConnex DUB05
Ireland's national planning board, An Coimisiun Pleanala, has given the green light for two data centers in Dublin, overturning a 2023 decision by the local council to refuse permission.
11.22 miles Center PlusInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
11.24 miles Point PrimeInterested in this information?Contact us
Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle.
11.27 miles ProInterested in this information?Contact us
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
11.29 miles CyrusOne : DUB I Bldg 2
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
11.35 miles CyrusOne Dublin I
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
11.36 miles CyrusOne : DUB I Bldg 3
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Appoints New Global Head Of Energy
US colocation data center firm Digital Realty has appointed Jim Collins as senior vice president and global head of energy. Collins joins from Microsoft, where he spent 13 years in various leadersh...

Digital Realty Appoints New Global Head Of Energy

September 26, 2026 Digital Realty Trust

US colocation data center firm Digital Realty has appointed Jim Collins as senior vice president and global head of energy. Collins joins from Microsoft, where he spent 13 years in various leadership roles, most recently as general manager of global energy markets. Before Microsoft, he spent a...

Read more
Read Digital Realty Launches 6.4MW Data Center In Nairobi, Kenya
Digital Realty has launched its second data center in Nairobi, Kenya. The company announced on September 7 that its Nairobi Two Data Center (NBO2) is now operational, adding 6.4MW of capacity to it...

Digital Realty Launches 6.4MW Data Center In Nairobi, Kenya

September 08, 2026 Digital Realty Trust

Digital Realty has launched its second data center in Nairobi, Kenya. The company announced on September 7 that its Nairobi Two Data Center (NBO2) is now operational, adding 6.4MW of capacity to its Nairobi campus. The facility covers 12,000 sq ft (1,100 sqm). The launch follows iColo’s...

Read more
Read Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion
Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulle...

Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion

July 01, 2026 Digital Realty Trust

Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulles campus in Sterling, all 100% leased to hyperscale customers. Blackstone is selling a 64% interest...

Read more
Read Digital Realty Plans New Data Center in Seattle, Washington
Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans w...

Digital Realty Plans New Data Center in Seattle, Washington

June 05, 2026 Digital Realty Trust

Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans with the Seattle City Council to replace the existing retail building and parking garage at 301...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?