Digital Realty: IAD53

Latest Podcast 9905 Godwin Dr
OperationalPlanned
Operational with future phases planned
Operated by:

Digital Realty: IAD53

Short Code: IAD53
Site was first built in 2024 and has expansions through 2027
Floors: 2
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty. The site was purchased by Digital Second for $5.75 million in 2018.

Map and Nearby Locations

9905 Godwin Dr
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: IAD53 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: IAD53

Distance Site About
0.23 miles Tower UltraInterested in this information?Contact us
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
0.30 miles Digital Realty: IAD50
0.32 miles Digital Realty: IAD51
0.34 miles PrimeInterested in this information?Contact us
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
0.36 miles SouthInterested in this information?Contact us
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
0.46 miles East HubInterested in this information?Contact us
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
0.55 miles South PointInterested in this information?Contact us
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
0.57 miles Black Chamber: Nokesville
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
0.62 miles CloudHQ: MDC3
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
0.63 miles CloudHQ: MDC2
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
0.69 miles CloudHQ: MDC1
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
0.70 miles MetroInterested in this information?Contact us
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
0.74 miles Ridge UltraInterested in this information?Contact us
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
0.80 miles Prime CampusInterested in this information?Contact us
Amazon is building another data center in it's Innovation Drive campus.
0.82 miles QTS Manassas 1 DC6
This facility is part of QTS Manassas 1 Campus in Virginia.
0.87 miles PlusInterested in this information?Contact us
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
0.87 miles Valley PrimeInterested in this information?Contact us
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
0.93 miles Edge ValleyInterested in this information?Contact us
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
0.95 miles QTS: Manassas 1 DC3
This facility is part of QTS Data Center Campus in Manassas.
0.95 miles QTS: Manassas 1 DC2
This facility is part of QTS Data Center Campus in Manassas.
0.95 miles QTS: Manassas 1 DC4
0.98 miles QTS: Manassas 1 DC1
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
1.05 miles Point ThreeInterested in this information?Contact us
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
1.22 miles QTS Manassas 1 DC5
This facility is part of QTS Data Center Campus in Manassas.
1.24 miles CloudHQ MCC2
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
1.24 miles CloudHQ: MCC7
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
1.37 miles ThreeInterested in this information?Contact us
1.42 miles Stack: NVA05A
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
1.44 miles Park PrimeInterested in this information?Contact us
1.45 miles JK Land: Comcast Center
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
1.48 miles Stack: NVA05C
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
1.56 miles CloudHQ: MCC4
CloudHQ has announced plans for MCC4, a new facility to be located at 10849 Airman Avenue in the Northern Virginia market. The data center will span 225,585 sqft of space.
1.57 miles VAZATA Northern Virginia (NoVa One)
1.57 miles CloudHQ Manassas Hornbaker
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
1.57 miles Evoswitch USA WDC 1
1.57 miles Plaza PrimeInterested in this information?Contact us
1.58 miles Stack: NVA05B
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
1.59 miles CloudHQ: MCC5
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
1.59 miles Stack: NVA02B
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
1.60 miles Park ThreeInterested in this information?Contact us
1.60 miles Stack: NVA02C
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
1.60 miles Stack: NVA02A
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
1.63 miles Core HubInterested in this information?Contact us
1.64 miles CloudHQ: MCC1
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
1.66 miles TPC: Manassas, VA
1.76 miles CloudHQ: MCC6Z
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
1.81 miles Stack: NVA02D
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
1.82 miles CloudHQ: MCC6A
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
1.83 miles Stack: NVA02F
This facility is part of Stack's NVA02 Campus in Northern Virginia.
1.84 miles Stack: NVA05D
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
1.86 miles CloudHQ MCC3
CloudHQ MCC3 is a part of The MCC data center campus.
1.89 miles Stack: NVA02G
This facility is part of Stack's NVA02 Campus in Northern Virginia.
1.89 miles Stack: NVA02E
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
2.01 miles Stack: Bristow 2 (NVA02L)
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
2.12 miles Stack: NVA02J
This facility is part of Stack's NVA02 Campus in Northern Virginia.
2.13 miles Valley PlusInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
2.14 miles Stack: NVA02I
This facility is part of Stack's NVA02 Campus in Northern Virginia.
2.19 miles Yondr: Manassas
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
2.20 miles Prime CampusInterested in this information?Contact us
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
2.20 miles Stack: Bristow Campus (NVA02K)
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
2.25 miles Stack: NVA02H
This facility is part of Stack's NVA02 Campus in Northern Virginia.
2.40 miles Point PrimeInterested in this information?Contact us
2.50 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
2.55 miles Park PlusInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
2.67 miles Iron Mountain: VA-6
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
2.76 miles Ridge BetaInterested in this information?Contact us
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
2.93 miles Iron Mountain: VA-8
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
3.00 miles Iron Mountain: VA-5
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
3.08 miles Iron Mountain: VA-7
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
3.13 miles Iron Mountain: VA-4
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
3.21 miles Opus Interactive Manassas
3.24 miles Metro PointInterested in this information?Contact us
3.31 miles Iron Mountain: VA-3
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
3.36 miles PrimeInterested in this information?Contact us
3.39 miles Plaza BetaInterested in this information?Contact us
3.40 miles Iron Mountain VA-2
3.43 miles Park ProInterested in this information?Contact us
3.49 miles Iron Mountain VA-1
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres. VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
3.53 miles Iron Mountain: Manassas Point
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
3.87 miles EdgeInterested in this information?Contact us
3.95 miles WestInterested in this information?Contact us
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
3.95 miles EdgeInterested in this information?Contact us
3.95 miles Hub TwoInterested in this information?Contact us
3.96 miles South ValleyInterested in this information?Contact us
3.98 miles Ridge OneInterested in this information?Contact us
4.11 miles Campus ProInterested in this information?Contact us
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
4.17 miles Point BetaInterested in this information?Contact us
4.20 miles Aligned: Manassas, VA
In 2022, Aligned acquired this plot in Manassas, Virginia.
4.21 miles BlackChamber: Gainesville, VA
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
4.22 miles Prime StationInterested in this information?Contact us
4.24 miles North StationInterested in this information?Contact us
4.24 miles Station ThreeInterested in this information?Contact us
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
4.31 miles Ridge AlphaInterested in this information?Contact us
4.33 miles Point ThreeInterested in this information?Contact us
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
4.33 miles Prime HubInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
4.35 miles Equinix Manassas DC14
4.37 miles PrimeInterested in this information?Contact us
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
4.44 miles South ValleyInterested in this information?Contact us
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
4.47 miles Verizon: 7777 Infantry Ridge
Former AOL data center
4.53 miles Park BetaInterested in this information?Contact us
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
4.91 miles Yondr Bristow Campus
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
4.99 miles Station PlusInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
5.00 miles Yondr: Bristow Bldg 2
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
5.03 miles OneInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
5.08 miles Campus GammaInterested in this information?Contact us
5.10 miles MetroInterested in this information?Contact us
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
5.17 miles JK Land: Hunter Trust
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
5.19 miles Data Center Edge District
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
5.28 miles Hub UltraInterested in this information?Contact us
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
5.37 miles NorthInterested in this information?Contact us
5.38 miles Edge HubInterested in this information?Contact us
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
5.43 miles Prime ParkInterested in this information?Contact us
5.43 miles North StationInterested in this information?Contact us
5.53 miles ValleyInterested in this information?Contact us
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
5.53 miles 8217 Linton Hall (VA4) Digital Realty
5.56 miles MetroInterested in this information?Contact us
5.74 miles CorScale: Gainesville 4
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
5.77 miles CorScale: Gainesville 5
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
5.80 miles CorScale: Gainesville 3
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
5.83 miles East PointInterested in this information?Contact us
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
5.94 miles CorScale: Gainesville 2
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
6.02 miles Corscale: Gainesville 1
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
7.05 miles NTT: VA10
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
7.12 miles NTT: VA11
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
7.21 miles NTT: VA12
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
7.36 miles NTT: VA13
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
7.36 miles ParkInterested in this information?Contact us
Amazon Data Services acquired 91 acres in Manassas for $218m
7.39 miles Gardner Property Project
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
7.43 miles Compass: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
7.44 miles John Marshall Commons Tech Park
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
7.48 miles Tower ProInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
7.55 miles Core RidgeInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
7.60 miles Park PrimeInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
7.69 miles Station ProInterested in this information?Contact us
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
8.11 miles QTS: Prince William Digital Gateway Campus
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
8.84 miles Headwaters: Catlett, VA
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
8.91 miles Quantico Ridge Data Center
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
8.94 miles North PointInterested in this information?Contact us
9.13 miles CyrusOne: Vint Hill
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
9.20 miles OVH US East Vint Hill
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
9.31 miles OVH: Vint Hill Bldg 2
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
9.33 miles Tower BetaInterested in this information?Contact us
9.45 miles Parkstone Tech Park
9.54 miles PlusInterested in this information?Contact us
9.55 miles PlazaInterested in this information?Contact us
9.56 miles ValleyInterested in this information?Contact us
9.77 miles Vint Hill Corners
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
10.61 miles Dulles South Innovation Center
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
11.19 miles South PlazaInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
11.20 miles Hub ProInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
11.33 miles East CampusInterested in this information?Contact us
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
11.54 miles Hyperscale Data CenterInterested in this information?Contact us
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
11.57 miles Penzance: Chantilly Premier
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
11.66 miles North StationInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
11.66 miles Station PrimeInterested in this information?Contact us
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
11.79 miles Ridge AlphaInterested in this information?Contact us
11.84 miles Lafayette Center Drive Campus - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
12.08 miles Campus PrimeInterested in this information?Contact us
12.09 miles Starwood: Stonecroft Blvd, Chantilly
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
12.11 miles Plaza PlusInterested in this information?Contact us
12.11 miles PrimeInterested in this information?Contact us
12.14 miles Park UltraInterested in this information?Contact us
12.18 miles Global ValleyInterested in this information?Contact us
12.20 miles UltraInterested in this information?Contact us
12.24 miles Edge ValleyInterested in this information?Contact us
12.27 miles Valley AlphaInterested in this information?Contact us
12.27 miles Metro CampusInterested in this information?Contact us
12.49 miles Edge TowerInterested in this information?Contact us
12.52 miles Central CampusInterested in this information?Contact us
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
12.53 miles Hub PlusInterested in this information?Contact us
12.53 miles PlazaInterested in this information?Contact us
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
12.58 miles Plaza MaxInterested in this information?Contact us
12.66 miles Plaza PrimeInterested in this information?Contact us
13.16 miles Point TwoInterested in this information?Contact us
13.25 miles MaxInterested in this information?Contact us
13.27 miles Point PlusInterested in this information?Contact us
13.34 miles NorthInterested in this information?Contact us
13.59 miles Menlo: MD-DC1 (Herndon)
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
13.93 miles CloudInterested in this information?Contact us
13.98 miles TwoInterested in this information?Contact us
13.98 miles Tower OneInterested in this information?Contact us
14.03 miles ThreeInterested in this information?Contact us
14.04 miles PointInterested in this information?Contact us
14.07 miles GlobalInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
14.11 miles Tower PlusInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
14.13 miles PowerHouse Arcola
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
14.16 miles PowerHouse: Arcola Bldg B
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
14.18 miles Tower ProInterested in this information?Contact us
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
14.23 miles South PlazaInterested in this information?Contact us
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
14.26 miles Edge PlazaInterested in this information?Contact us
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
14.27 miles Valley PlusInterested in this information?Contact us
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
14.37 miles MetroInterested in this information?Contact us
14.38 miles JK Land: Technology Park 3
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
14.39 miles North ValleyInterested in this information?Contact us
14.47 miles TwoInterested in this information?Contact us
14.48 miles Yondr: Arcola Expansion
Yondr is planning to expand capacity on an adjacent parcel of land.
14.49 miles Global TowerInterested in this information?Contact us
14.50 miles Park MaxInterested in this information?Contact us
14.54 miles JK Land: Technology Park 2
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
14.60 miles Yondr: Arcola Bldg 2
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
14.60 miles Hiddenwood Assemblage Campus
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
14.63 miles Global PlazaInterested in this information?Contact us
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
14.64 miles West CenterInterested in this information?Contact us
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
14.66 miles Yondr: Arcola Bldg 1
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
14.67 miles Campus OneInterested in this information?Contact us
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
14.73 miles Station ProInterested in this information?Contact us
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
14.77 miles NorthInterested in this information?Contact us
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
14.78 miles Central ValleyInterested in this information?Contact us
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
14.84 miles PlusInterested in this information?Contact us
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
14.89 miles West HubInterested in this information?Contact us
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
14.95 miles Station PrimeInterested in this information?Contact us
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
15.00 miles JK Land: Technology Park 1
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
15.03 miles CentralInterested in this information?Contact us
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
15.03 miles CyrusOne: NVA9 Bldg-1A
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
15.06 miles South PlazaInterested in this information?Contact us
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
15.07 miles JK Land: Tech Park 1 Expansion
15.09 miles CyrusOne: NVA9 Bldg-2
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
15.09 miles CyrusOne: NVA9 Bldg-1B
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
15.15 miles Maple Tree Farm
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
15.19 miles Digital Realty Dulles Expansion
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
15.21 miles Stack: Loudoun 2
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
15.24 miles Stack: Loudoun 1
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
15.26 miles Digital Realty: IAD44
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
15.30 miles CentralInterested in this information?Contact us
Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.
15.31 miles Prologis: Sterling, VA
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
15.36 miles Digital Realty: IAD45
This facility is part of the Digital Dulles Campus in Sterling, VA.
15.61 miles Aptum Herndon
The site was originally a Peer 1 site before the Cogeco acquisition.
16.07 miles CoreSite: VA3
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
16.32 miles Lincoln Rackhouse 251 Exchange
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
16.34 miles CoreSite: VA1
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
16.34 miles Contegix Reston
The Contegix site is on CoreSite's Reston Campus
16.42 miles CoreSite: VA2
16.47 miles Hyperscale Data CenterInterested in this information?Contact us
16.52 miles Hyperscale Data CenterInterested in this information?Contact us
16.60 miles Hyperscale Data CenterInterested in this information?Contact us
16.63 miles Hyperscale Data CenterInterested in this information?Contact us
16.73 miles Dulles 2000 Campus
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
16.73 miles Cogent: 510 Huntmar
Cogent exited the data center and it is currently available to lease.
16.82 miles H5: Herndon
16.90 miles Lumen Herndon 3
16.92 miles Lumen Herndon 1
16.93 miles Csquare: Dulles IAD3
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
17.07 miles Central HubInterested in this information?Contact us
17.11 miles Plaza GammaInterested in this information?Contact us
17.12 miles Point ThreeInterested in this information?Contact us
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
17.15 miles Lincoln Rackhouse 1807 Michael Faraday
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
17.16 miles CenterInterested in this information?Contact us
17.17 miles HubInterested in this information?Contact us
17.19 miles Evocative: Virginia, IAD1
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
17.24 miles 1780 Business Center Drive (VA3) Digital Realty
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
17.25 miles Park PrimeInterested in this information?Contact us
17.29 miles ProInterested in this information?Contact us
17.29 miles Prologis: Global Plaza Rd
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
17.31 miles MaxInterested in this information?Contact us
17.35 miles Centersquare: IAD2-B
17.36 miles Metro CenterInterested in this information?Contact us
17.38 miles Centersquare: IAD2-A
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
17.39 miles ProInterested in this information?Contact us
17.39 miles CyrusOne Northern Virginia Sterling IV
17.40 miles Plaza TwoInterested in this information?Contact us
17.43 miles PointInterested in this information?Contact us
17.45 miles Skybox Northern Virginia
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
17.45 miles Valley GammaInterested in this information?Contact us
17.47 miles Aligned IAD03
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
17.54 miles Prologis: Executive Drive
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
17.54 miles Central HubInterested in this information?Contact us
17.59 miles Peterson: Silverbrook
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
17.61 miles CentralInterested in this information?Contact us
17.62 miles North CenterInterested in this information?Contact us
17.63 miles North RidgeInterested in this information?Contact us
17.66 miles PlazaInterested in this information?Contact us
17.68 miles HubInterested in this information?Contact us
17.68 miles 44351 Import Plz
17.69 miles Cloud TowerInterested in this information?Contact us
17.72 miles Global CampusInterested in this information?Contact us
17.74 miles Import Plz, Ashburn
17.75 miles Cloud ValleyInterested in this information?Contact us
17.75 miles PlusInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
17.76 miles Edge TowerInterested in this information?Contact us
17.78 miles TwoInterested in this information?Contact us
17.78 miles QTS: ASH2 DC2
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
17.80 miles QTS Ashburn-Moran
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
17.81 miles CentralInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
17.82 miles Sentinel Washington Dulles Gateway
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
17.82 miles Digital Realty: IAD55
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
17.83 miles QTS: ASH2 DC1
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
17.85 miles Hub ProInterested in this information?Contact us
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
17.85 miles QTS Ashburn-Shellhorn DC1
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
17.88 miles EdgeCore: Ashburn AS02
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
17.91 miles QTS Ashburn-Shellhorn DC2
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
17.98 miles Valley UltraInterested in this information?Contact us
17.99 miles 44060 Digital Loudoun Plaza (Bldg K)
18.01 miles Stack: NVA04A
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
18.01 miles 43940 Digital Loudoun Plaza (Bldg G)
18.02 miles Connect Data Centers: Sterling, VA
18.04 miles Tower PlusInterested in this information?Contact us
18.07 miles 44100 Digital Loudoun Plaza (Bldg J)
18.07 miles Hub PrimeInterested in this information?Contact us
18.08 miles 43780 Digital Loudoun Plaza (Bldg H)
18.11 miles Stack: NVA04B
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
18.11 miles 43881 Devin Shafron (Bldg B)
18.14 miles 43831 Devin Shafron (Bldg C)
18.15 miles CloudHQ: LC8
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
18.16 miles Vantage VA16
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
18.16 miles 43915 Devin Shafron (Bldg A)
18.16 miles CloudHQ: LC4
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
18.17 miles Stack: NVA04C
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
18.18 miles MetroInterested in this information?Contact us
18.18 miles Vantage: VA23
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
18.18 miles 43791 Devin Shafron (Bldg D)
18.20 miles Vantage VA15
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
18.20 miles Vantage: VA21
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
18.20 miles Menlo: MD-DC2 (Sterling)
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
18.20 miles QTS Ashburn 1
There is 2.66 MW of Critical Power per Data Hall
18.26 miles Deft: DRT-IAD1
18.26 miles 43830 Devin Shafron (Bldg F)
18.26 miles Vantage: VA22
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
18.26 miles Digital Realty: IAD43
18.27 miles CloudHQ: LC9
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
18.27 miles CloudHQ: LC10
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
18.30 miles 43790 Devin Shafron (Bldg E)
18.31 miles Sentinel: Cloud Plaza, Sterling, VA
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
18.37 miles CloudHQ: LC13
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.37 miles CloudHQ: LC12
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.40 miles Vantage VA12
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
18.42 miles PowerHouse: Pacific Bldg C
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
18.45 miles Vantage VA11
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
18.45 miles CloudHQ: LC14
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.47 miles Vantage VA14
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
18.47 miles CloudHQ: LC11
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
18.47 miles PowerHouse: Pacific Bldg B
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
18.48 miles Vantage VA13
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
18.51 miles Digital Realty: Broderick Drive
18.53 miles QTS Ashburn (Carpathia)
QTS acquired this site via the Carpathia acquisition in 2015
18.56 miles PowerHouse Pacific
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
18.56 miles 44372 Round Table: Digital Realty
18.57 miles STACK Northern Virginia
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
18.60 miles 44274 Round Table (Bldg L)
18.66 miles CloudHQ: LC5
The Data Center building referred to as LC5 will be a part of CloudHQ's Ashburn Data Center Campus located at 21615 Lockridge Rd, Ashburn.
18.69 miles 44751 Round Table (Bldg P)
18.73 miles Aligned: IAD-02
Aligned IAD-02 is the second building on Aligned's 26-acre campus in Ashburn, VA located at 21821 Uunet Dr. The facility has a 120 MW capacity.
18.76 miles CloudHQ: LC1B
18.77 miles Regency DC Campus Ashburn
The Regency data center project is a proposed hyperscale campus situated on 130 acres at the intersection of Waxpool Road and Ashburn Village Boulevard in Ashburn, Virginia.
18.78 miles CloudHQ: LC1A
The campus plans to host fourteen data centers with a combined customer critical IT load exceeding 1.7 GW. At full build out, the campus will span an area of 8,500,00 SF (789.676 SM).
18.79 miles Dulles 28 Technology Park
The Dulles 28 Technology Park site encompasses 39.8 acres situated at the northwest quadrant where Waxpool Road meets Pacific Boulevard.
18.80 miles Quantum Connect: Ashburn, VA
A data center is under construction at the Quantum business park in Ashburn, Virginia.
18.85 miles CloudHQ: LC3
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
18.86 miles Equinix DC13
18.91 miles CloudHQ LC2
Buildings referred to as LC 2 and LC 3 are part of CloudHQ's Ashburn Data Center Campus. These two structures are independent data centers, with each facility surpassing 500,000 square feet in floor space.
18.93 miles 21744 Sir Timothy Drive (ACC10)
18.93 miles Aligned: IAD-01
Aligned IAD-01 is the first building on Aligned's 26-acre campus in Ashburn, VA located at 21890 Uunet Dr. The facility has a 60 MW capacity.
18.95 miles Equinix DC21
18.95 miles Sabey Intergate: Ashburn Bldg-A
Sabey Data Centers (SDC) has begun construction on Building A, the third and final building on its Ashburn campus.
18.98 miles Sabey Intergate: Ashburn Bldg-B
19.03 miles 21745 Sir Timothy (ACC9) Digital Realty
19.04 miles DataCanopy: Ashburn 1
DataBank’s IAD1 facility anchors DataCanopy's Ashburn Campus in the heart of “Data Center Alley” – the world’s largest concentration of data centers.
19.06 miles DataBank Ashburn IAD1
DataBank's IAD1 at 21635 Red Rum Drive is the original building on its Ashburn campus, acquired from Zayo (zColo) in December 2020.
19.06 miles Sabey Intergate: Ashburn Bldg-C
Intergate.Ashburn is a purpose-built data center campus on 38 acres
19.06 miles DataBank Ashburn IAD4
IAD4 and surrounding 5-acres of land will join the two existing facilities (IAD1, IAD3) already in operation on the existing 13-acre campus.
19.07 miles Digital Realty: IAD-56
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
19.07 miles FastServ Ashburn
19.08 miles Cogent Vienna
19.08 miles Equinix: DC22
Equinix's DC22 data center is situated within the DC21 campus, and its initial phase provides capacity for 2,125 cabinets.
19.09 miles H5 Ashburn
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
19.10 miles NTT: VA7
Set to open in September 2026, VA7 Data Center in Ashburn will deliver roughly 125,000 square feet of premium data-floor space.
19.13 miles Equinix Ashburn DC6
19.13 miles Equinix Ashburn DC11
19.13 miles Lightedge: Ashburn
LightEdge Ashburn Data Center is a sublisting and tenant within the Equinix DC11 facility.
19.17 miles 8100 Boone - Digital Realty
19.17 miles Equinix Ashburn DC5
19.17 miles Equinix Ashburn DC1
19.17 miles NTT: VA6
VA6 is a 180,000-square-foot data center located on NTT's 78-acre campus in Ashburn, Virginia.
19.18 miles Cologix: Ashburn Expansion (Beaumeade Circle)
Cologix acquired 38 acres on Beaumeade Circle in Ashburn's Data Center Alley in early 2026 for a future AI-ready campus; preliminary planning is expected around 2030.
19.18 miles Equinix Vienna DC7
19.20 miles Equinix Ashburn DC4
19.21 miles Element Critical VA1
19.21 miles DataBank Ashburn IAD3
19.21 miles NTT: VA9
19.22 miles Edge TowerInterested in this information?Contact us
Located at the heart of Northern Virginia's "Data Center Alley," the $360 million Beaumeade Circle project was developed by Oppidan Investment Company, known for its work with AWS.
19.22 miles Equinix Ashburn DC2
The heart of interconnection in Ashburn
19.23 miles NTT VA3
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
19.25 miles 21625 Gresham (ACC7) Digital Realty
ACC7 is part of the legacy Dupont Fabros Ashburn campus
19.28 miles NTT VA5
19.29 miles Plaza GammaInterested in this information?Contact us
Amazon plans to build another data center in Loudoun County.
19.30 miles Dulles 28 Centre Motorplex
On August 5, 2021, BlackChamber Group, operating through Dulles 28 Centre Lot 2A LLC, purchased 11 acres of land in Sterling, Loudoun County, Virginia, behind Auto World Circle.
19.30 miles 44480 Hastings (ACC4) Digital Realty
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
19.30 miles ProInterested in this information?Contact us
This facility is a part of The Beaumeade Circle project developed by an affiliate of Oppidan Investment Company.
19.32 miles Paragon Park Lot 3B
On October 15, 2021, Paragonpark Lot 3B LLC, a subsidiary of BlackChamber Group, purchased 49.7 acres of land in Sterling, Loudoun County, Virginia, for $135 million.
19.32 miles Cologix: ASH1
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
19.35 miles 21710 Charles View
19.35 miles Edge CenterInterested in this information?Contact us
19.39 miles NTT: VA8
19.42 miles NTT VA4
19.42 miles Cologix: ASH2
Cologix ASH2 is a two-story, 226,000 sq ft Cologix-owned hyperscale building under construction at 21673 Beaumeade Circle in Ashburn's Data Center Alley, with four data halls designed for high-density workloads.
19.42 miles Equinix Vienna DC8
19.45 miles 44521 Hastings (ACC5) Digital Realty
19.46 miles 44520 Hastings (ACC3) Digital Realty
19.47 miles PowerHouse ABX1
19.50 miles Cyrusone: Beaumeade Circle
CyrusOne acquired PowerHouse ABX-1, located in Ashburn, Loudoun County, for $154.1 million in Virginia. Sat on 10 acres at 21529 Beaumeade Circle, ABX-1 comprises a single two-story 265,000 sq ft (25,000 sqm) building.
19.51 miles Rackspace Ashburn IAD3
19.51 miles 44461 Chilum (ACC6) Digital Realty
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
19.52 miles 44490 Chilum (ACC2): Digital Realty
19.53 miles North ValleyInterested in this information?Contact us
19.54 miles 21641 Charles View
19.58 miles Equinix Ashburn DC10
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
19.58 miles 44470 Chillum - Digital Realty
19.59 miles Equinix Ashburn DC3
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
19.62 miles WestInterested in this information?Contact us
19.62 miles Lumen Ashburn
19.63 miles Digital Realty: 21561 Beaumeade Cir
In 2010, Digital Realty Trust (DLR) acquired two fully leased data centers in the northern Virginia market, as well as a parcel of land in the heart of Ashburn's "Data Center Alley" that could support future construction.
19.64 miles Centersquare: Ashburn WDC1
Centersquare's Ashburn facility is in Virginia close to Washington, DC in the heart of Loudon County’s “Data Center Alley” with its multiple fiber routes, and less than 10 miles from Dulles International Airport.
19.67 miles NTT VA1
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
19.68 miles DataCanopy: Ashburn 2
Data Canopy’s data center located in Ashburn, Virginia, is strategically located near Washington, DC in the area known as, “Fiber Alley,” one of the densest regions of fiber carriers in the world.
19.68 miles Core TowerInterested in this information?Contact us
Amazon Web Services (AWS) is the sole tenant leasing two single-story powered shell data center buildings located on West Severn Way in Sterling, Loudoun County, Virginia. These facilities collectively comprise 297,160 square feet of net rentable square feet (NRSF).
19.70 miles Equinix DC15
19.72 miles Active Infra: Spring Valley Expansion
19.72 miles Active Infra: Spring Valley Tech Park
Active Infrastructure plans to develop a 3.5 million-square-foot (325,161 sqm) data center campus on 362 acres in Leesburg, Loudoun County, Virginia.
19.72 miles PointOne: IAD2
Situated on a 9.4-acre site, the property is slated for the development of a two-story, 244,000 sq ft (22,700 sqm) data center, which has already received conditional approval.
19.75 miles Equinix Ashburn DC12
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
19.78 miles Edge PlazaInterested in this information?Contact us
19.80 miles Equinix DC16
19.81 miles NTT VA2
19.83 miles Edge RidgeInterested in this information?Contact us
19.84 miles Equinix: DC17
Equinix intends to build its DC-17 data center in Loudoun County, Virginia
19.87 miles Equinix: DC18
Equinix intends to build its DC-18 data center in Loudoun County, Virginia
19.89 miles Starwood: Alexandria, VA
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
19.95 miles DataCanopy: Sterling, VA
62 cabinets available and 225+ kW multi-tenant cages. 40+ cabinet private cage can be segmented.
19.96 miles Hub PrimeInterested in this information?Contact us
19.96 miles DataBank McLean IAD2
In 2020, DataBank acquired the site from zColo.
19.97 miles Center MaxInterested in this information?Contact us
19.97 miles CyrusOne: NVA5
19.98 miles PointInterested in this information?Contact us
19.99 miles CyrusOne Sterling VIII

Digital Realty: IAD53 Data Center Photos See all

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.
Ashburn Data Center Cluster Map
Source: Baxtel

Map of data centers immediately surrounding the Equinix campus and Beaumeade Circle.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Appoints New Global Head Of Energy
US colocation data center firm Digital Realty has appointed Jim Collins as senior vice president and global head of energy. Collins joins from Microsoft, where he spent 13 years in various leadersh...

Digital Realty Appoints New Global Head Of Energy

September 26, 2026 Digital Realty Trust

US colocation data center firm Digital Realty has appointed Jim Collins as senior vice president and global head of energy. Collins joins from Microsoft, where he spent 13 years in various leadership roles, most recently as general manager of global energy markets. Before Microsoft, he spent a...

Read more
Read Digital Realty Launches 6.4MW Data Center In Nairobi, Kenya
Digital Realty has launched its second data center in Nairobi, Kenya. The company announced on September 7 that its Nairobi Two Data Center (NBO2) is now operational, adding 6.4MW of capacity to it...

Digital Realty Launches 6.4MW Data Center In Nairobi, Kenya

September 08, 2026 Digital Realty Trust

Digital Realty has launched its second data center in Nairobi, Kenya. The company announced on September 7 that its Nairobi Two Data Center (NBO2) is now operational, adding 6.4MW of capacity to its Nairobi campus. The facility covers 12,000 sq ft (1,100 sqm). The launch follows iColo’s...

Read more
Read Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion
Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulle...

Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion

July 01, 2026 Digital Realty Trust

Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulles campus in Sterling, all 100% leased to hyperscale customers. Blackstone is selling a 64% interest...

Read more
Read Digital Realty Plans New Data Center in Seattle, Washington
Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans w...

Digital Realty Plans New Data Center in Seattle, Washington

June 05, 2026 Digital Realty Trust

Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans with the Seattle City Council to replace the existing retail building and parking garage at 301...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?