0.21 miles
|
CloudHQ: MCC1
|
CloudHQ's Manassas Corporate Center (MCC) is a 100-acre, 2,232,875 SF (207,441 SM) data center campus.
|
|
0.21 miles
|
CloudHQ: MCC6Z
|
MCC6Z will be a part of CloudHQ's MCC Campus in Manassas. MCC6 site consists of two data center buildings, MCC6A and MCC6Z.
|
|
0.23 miles
|
CloudHQ: MCC5
|
MCC5 will be part of CloudHQ's MCC Campus in Manassas. The project has received site plan approval and is ready for immediate development in 2024. The data center will span 369,600 sq ft of space.
|
|
0.26 miles
|
CloudHQ: MCC6A
|
MCC6A is part of CloudHQ's MCC Campus in Manassas. This data center became operational in 2022.
|
|
0.34 miles
|
CloudHQ MCC2
|
MCC2 is part of CloudHQ's series of data centers in Manassas, Northern Virginia. The facility, with 250,144 sq ft of gross space, came online in 2019.
|
|
0.38 miles
|
CloudHQ MCC3
|
CloudHQ MCC3 is a part of The MCC data center campus.
|
|
0.39 miles
|
CloudHQ: MCC7
|
MCC7 will be part of CloudHQ's MCC Campus in Manassas. The facility is slated to begin construction in mid-2025 with an expected ready-for-service delivery in Q3 2026.
|
|
1.06 miles
|
CloudHQ: MDC1
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
1.20 miles
|
Edge CenterInterested in this information?Contact us
|
Amazon's Tanner Way Campus in Manassas comprises four single-story data center buildings, spanning a total of 795,191 square feet.
|
|
1.22 miles
|
CloudHQ: MDC2
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
1.23 miles
|
Cloud CampusInterested in this information?Contact us
|
The IAD-102 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 26 backup diesel generators with 124 exhaust fans.
|
|
1.30 miles
|
Valley PrimeInterested in this information?Contact us
|
The IAD-101 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 22 backup diesel generators with 124 exhaust fans.
|
|
1.35 miles
|
Edge RidgeInterested in this information?Contact us
|
The IAD-103 data center building is part of Amazon's Tanner Way Campus in Manassas, VA. The one-story building consists of 18 backup diesel generators with 84 exhaust fans.
|
|
1.36 miles
|
CloudHQ: MDC3
|
CloudHQ is constructing a three-building data center campus in the heart of the Manassas data center market, just south of the intersection of Routes 28 and 234.
|
|
1.41 miles
|
Digital Realty: IAD51
|
|
|
1.49 miles
|
Central PointInterested in this information?Contact us
|
Amazon has acquired a plot of government-owned land, approximately 20 acres on Wakeman Drive, Manassas, in Virginia's Prince William County for a new data center.
|
|
1.50 miles
|
Digital Realty: IAD50
|
|
|
1.56 miles
|
Digital Realty: IAD53
|
A company known as Digital Second Manassas LLC developed a 185,000 sq ft data center at 9905 Godwin Drive in Manassas. Digital Second Manassas is a listed subsidiary of Digital Realty.
|
|
1.93 miles
|
NorthInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
2.00 miles
|
Prime PlazaInterested in this information?Contact us
|
This facility is part of Amazon's Nokesville Road campus in Manassas, Virginia.
|
|
2.04 miles
|
Black Chamber: Nokesville
|
Data center developer Black Chamber Partners is looking to acquire the 7-acre Manassas Church of the Brethren property at 10047 Nokesville Road to expand its footprint in Northern Virginia’s digital infrastructure hub.
|
|
2.16 miles
|
Park ProInterested in this information?Contact us
|
Amazon Web Services (AWS) is planning another data center campus in the Manassas area of Virginia's Prince William County. Construction has begun on the Amazon Web Services three-building, approximately 250,000-square-foot data center complex.
|
|
2.22 miles
|
CoreInterested in this information?Contact us
|
Amazon is building another data center in it's Innovation Drive campus.
|
|
2.28 miles
|
Station OneInterested in this information?Contact us
|
Amazon IAD-106 data center is located at 9720 Innovation Dr, Manassas, VA 20110, USA.
|
|
2.35 miles
|
QTS Manassas 1 DC6
|
This facility is part of QTS Manassas 1 Campus in Virginia.
|
|
2.35 miles
|
PrimeInterested in this information?Contact us
|
Amazon IAD-105 data center is located at 9700 Innovation Dr, Manassas, VA 20110, USA.
|
|
2.45 miles
|
North PlazaInterested in this information?Contact us
|
Amazon IAD-104 data center is located at 9680 Innovation Dr, Manassas, VA 20110, USA.
|
|
2.47 miles
|
QTS: Manassas 1 DC4
|
|
|
2.49 miles
|
South RidgeInterested in this information?Contact us
|
|
|
2.50 miles
|
QTS: Manassas 1 DC2
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
2.51 miles
|
QTS: Manassas 1 DC3
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
2.52 miles
|
QTS: Manassas 1 DC1
|
QTS is building a 100+ acre campus in Manassas, Virginia. QTS bought the property, at 10680 University Blvd. adjacent to its existing data center, for $5 million in 2018.
|
|
2.53 miles
|
RidgeInterested in this information?Contact us
|
|
|
2.62 miles
|
Stack: NVA02A
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
|
2.66 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
|
2.70 miles
|
Stack: NVA02C
|
The facility has a substantial footprint of 15,000 square feet, encompassing both critical and non-critical spaces.
|
|
2.74 miles
|
QTS Manassas 1 DC5
|
This facility is part of QTS Data Center Campus in Manassas.
|
|
2.76 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
|
2.76 miles
|
Evoswitch USA WDC 1
|
|
|
2.76 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
|
2.76 miles
|
West CenterInterested in this information?Contact us
|
|
|
2.79 miles
|
Stack: Bristow 2 (NVA02L)
|
Prince William County supervisors have voted to reject STACK Infrastructure’s proposal for the Bristow Campus, a large-scale data center project.
|
|
2.82 miles
|
Stack: NVA02F
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
2.88 miles
|
JK Land: Comcast Center
|
The property, which spans 17 acres, features an existing 108,000-square-foot building that previously served as both office space and a data center.
|
|
2.89 miles
|
Stack: Bristow Campus (NVA02K)
|
Stack Infrastructure planned to build a large-scale data center campus on a 58-acre site in Bristow, but Prince William County supervisors voted to reject STACK Infrastructure’s proposed Bristow Campus.
|
|
2.91 miles
|
Stack: NVA02D
|
STACK Infrastructure NVA02D, Building D of NVA02 Campus, is located at Hornbaker Road in Manassas.
|
|
2.94 miles
|
Stack: NVA02E
|
STACK Infrastructure's NVA02E, Building E of NVA02 Campus, is located at Hornbaker Road in Manassas. The data center spans a substantial footprint of 280,000 square feet, encompassing both critical and non-critical spaces.
|
|
2.96 miles
|
Stack: NVA05A
|
STACK Infrastructure's NVA05A data center offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
|
2.98 miles
|
Stack: NVA02J
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
3.02 miles
|
Stack: NVA02G
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
3.04 miles
|
Stack: NVA05C
|
STACK Infrastructure announced plans to construct a new facility on Wellington Road in Manassas. The purpose-built facility will have a total footprint of 176,276 SF upon completion.
|
|
3.07 miles
|
Stack: NVA02I
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
3.13 miles
|
GammaInterested in this information?Contact us
|
|
|
3.14 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
|
3.15 miles
|
Stack: NVA02H
|
This facility is part of Stack's NVA02 Campus in Northern Virginia.
|
|
3.18 miles
|
North ValleyInterested in this information?Contact us
|
|
|
3.22 miles
|
TPC: Manassas, VA
|
|
|
3.39 miles
|
Stack: NVA05D
|
The purpose-built facility will have a total footprint of 364,998 SF upon completion and is expected to significantly enhance the company's data center capacity in the area.
|
|
3.62 miles
|
Yondr: Manassas
|
Yondr and Cerberus have acquired land in Manassas for a new hyperscale data center campus targeted for service in 2029.
|
|
3.70 miles
|
North ValleyInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane.
|
|
3.76 miles
|
MetroInterested in this information?Contact us
|
Although the Planning Commission recommended its denial, Amazon Web Services (AWS) withdrew the proposal from the October 22 Board of County Supervisors agenda to allow for further community engagement and feedback.
|
|
3.77 miles
|
PlazaInterested in this information?Contact us
|
|
|
4.05 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon had plans for a massive data center campus in Manassas, Virginia, but in December 2022, the company decided to pause the plans after county staff recommended the denial of the project.
|
|
4.10 miles
|
Iron Mountain: VA-6
|
VA-6 is one of nine planned data centers situated on a 142-acre, highly secure campus that provides 2,100,000 sq. ft. of highly efficient, green colocation space. VA-6 offers 230,000 gross sq. ft. of space.
|
|
4.12 miles
|
Hub MaxInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair comprises two lots totaling 113 acres at 8401 and 8501 Vulcan Lane
|
|
4.12 miles
|
Cloud ValleyInterested in this information?Contact us
|
A proposed 389,425 square-foot data center development is planned for the Brentsville Magisterial District.
|
|
4.37 miles
|
Iron Mountain: VA-8
|
Iron Mountain Data Center seeks to expand its Manassas campus with a new two-story building totaling 165,428 square feet (15,369 square meters).
|
|
4.45 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
|
4.56 miles
|
Iron Mountain: VA-7
|
The Iron Mountain VA-7 data center is a $100 million project housed in a single building (also known as Iron Mountain DC2) on a 24-acre plot.
|
|
4.59 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
|
4.64 miles
|
Opus Interactive Manassas
|
|
|
4.74 miles
|
Core CenterInterested in this information?Contact us
|
|
|
4.76 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
|
4.85 miles
|
Iron Mountain VA-2
|
|
|
4.85 miles
|
Tower AlphaInterested in this information?Contact us
|
|
|
4.89 miles
|
Metro PlazaInterested in this information?Contact us
|
|
|
4.91 miles
|
North PointInterested in this information?Contact us
|
|
|
4.94 miles
|
Iron Mountain VA-1
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
|
5.06 miles
|
Iron Mountain: Manassas Point
|
Iron Mountain plans to build two data center buildings and a new electricity substation on a 40-acre data center-zoned property in Manassas, VA.
|
|
5.24 miles
|
Park BetaInterested in this information?Contact us
|
|
|
5.32 miles
|
WestInterested in this information?Contact us
|
|
|
5.35 miles
|
GlobalInterested in this information?Contact us
|
Amazon Data Services acquired the 269-acre site of the planned Devlin Technology Park in Prince William County, Bristow, in late 2025.
|
|
5.35 miles
|
Center OneInterested in this information?Contact us
|
|
|
5.48 miles
|
ParkInterested in this information?Contact us
|
|
|
5.49 miles
|
Core PlazaInterested in this information?Contact us
|
Amazon Data Services has expanded its footprint in Northern Virginia’s hyper-competitive data center corridor with a $120 million acquisition of 44 contiguous acres in Manassas, Prince William County.
|
|
5.49 miles
|
Center PlusInterested in this information?Contact us
|
Amazon acquired the 10 acres property in June of 2018. Development plans are unknown
|
|
5.50 miles
|
North RidgeInterested in this information?Contact us
|
|
|
5.51 miles
|
Plaza OneInterested in this information?Contact us
|
|
|
5.61 miles
|
BlackChamber: Gainesville, VA
|
The Merrifield Garden Center in Gainesville, VA (Prince William County), has been sold for $160M to data center developer BlackChamber Group.
|
|
5.67 miles
|
Edge CenterInterested in this information?Contact us
|
|
|
5.72 miles
|
Data Center Edge District
|
The House family has submitted an application to modify their property's designation in the county's Comprehensive Plan from agricultural estate to the proposed Data Center Edge District (DCED).
|
|
5.74 miles
|
EdgeInterested in this information?Contact us
|
|
|
5.76 miles
|
Aligned: Manassas, VA
|
In 2022, Aligned acquired this plot in Manassas, Virginia.
|
|
5.76 miles
|
Valley ThreeInterested in this information?Contact us
|
Microsoft Corporation owns 83 acres of land located at 8008 Devlin Road in Bristow, Prince William County, Virginia, on which it is developing a multi-phase data center campus.
|
|
5.82 miles
|
ThreeInterested in this information?Contact us
|
|
|
5.84 miles
|
Prime HubInterested in this information?Contact us
|
Amazon Data Services acquired 91 acres in Manassas for $218m
|
|
5.87 miles
|
Global HubInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
5.89 miles
|
Park BetaInterested in this information?Contact us
|
Microsoft acquired the 46 acre plot in 2020 for $29 million. The plans call for new construction of two - three-story data center buildings.
|
|
5.90 miles
|
Equinix Manassas DC14
|
|
|
5.93 miles
|
SouthInterested in this information?Contact us
|
Microsoft intends to construct two 3-story data center buildings, known as MNZ01 and MNZ02, which will comprise 623,360 square feet. Microsoft acquired the 46 acre plot in 2020 for $29 million.
|
|
6.02 miles
|
Verizon: 7777 Infantry Ridge
|
Former AOL data center
|
|
6.06 miles
|
StationInterested in this information?Contact us
|
Amazon paid $152 million to acquire roughly 140 acres across four parcels in Manassas. One pair of parcels comprises around 27 acres at 7151 and 7350 Century Park Drive.
|
|
6.13 miles
|
Yondr Bristow Campus
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Rd, Bristow. The two-building campus is set to deliver critical cloud capacity in one of the world’s largest data center markets.
|
|
6.18 miles
|
Yondr: Bristow Bldg 2
|
Yondr Group's Bristow Data Center Campus is located at 12981 Rollins Ford Road, Bristow, VA.
|
|
6.27 miles
|
JK Land: Hunter Trust
|
JK Land Holdings has submitted a site plan for a property within the Data Center Overlay, allowing for buildings up to 75 feet in height.
|
|
6.32 miles
|
Valley PrimeInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
6.39 miles
|
Plaza MaxInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
6.42 miles
|
South PointInterested in this information?Contact us
|
|
|
6.48 miles
|
Park PlusInterested in this information?Contact us
|
This planned facility is part of Google's Bristow Campus in Prince William County, Virginia.
|
|
6.66 miles
|
Park UltraInterested in this information?Contact us
|
The campus will include four data center buildings, an electric substation, auxiliary equipment structures, and a small administrative building.
|
|
6.67 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
|
6.71 miles
|
South PlazaInterested in this information?Contact us
|
|
|
6.71 miles
|
Plaza UltraInterested in this information?Contact us
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
|
6.77 miles
|
Valley OneInterested in this information?Contact us
|
|
|
6.79 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
6.89 miles
|
Prime ValleyInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
6.91 miles
|
Core CenterInterested in this information?Contact us
|
|
|
7.16 miles
|
CorScale: Gainesville 4
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
7.17 miles
|
TwoInterested in this information?Contact us
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
|
7.19 miles
|
CorScale: Gainesville 3
|
The data center building 3 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville.
|
|
7.20 miles
|
CorScale: Gainesville 5
|
The data center building 4 will be a part of CorScale's Gainesville Crossing campus located at 13760 University Blvd, Gainesville. The two-story data center will offer 200,000 sq ft of data hall space.
|
|
7.33 miles
|
CorScale: Gainesville 2
|
In Q1 2024, US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia's Prince William County.
|
|
7.41 miles
|
Quantico Ridge Data Center
|
The Quantico Ridge data center project was effectively rejected and halted when the developer abruptly withdrew its rezoning application in May 2026.
|
|
7.42 miles
|
Corscale: Gainesville 1
|
The first building of this multi-phase development was originally scheduled to open in 2023 but came online in 2025. It is a two-story building with eight (8) data halls and office space totaling approximately 483,000 square feet.
|
|
7.46 miles
|
Campus PlusInterested in this information?Contact us
|
|
|
8.32 miles
|
NTT: VA10
|
NTT is building four (4) two-story data centers and associated infrastructure on around 104 acres. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
8.37 miles
|
Headwaters: Catlett, VA
|
The Headwaters Site Development was a proposed $400 million data center project planned for a 67-acre site in the Catlett Station area of Fauquier County, Virginia.
|
|
8.40 miles
|
NTT: VA11
|
VA10 DC2 will be the second building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
8.49 miles
|
NTT: VA12
|
VA12 will be the third building of NTT's Gainesville Data Center Campus. The site is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
8.61 miles
|
Gardner Property Project
|
A developer files plans for an 82-acre data center campus on the site of the Hillwood Camping Park in Gainesville.
|
|
8.63 miles
|
NTT: VA13
|
VA13 will be the fourth building of NTT's Gainesville Data Center Campus. The campus is named "Grove at Gainesville" or "NTT VA10" in some of the planning documents.
|
|
8.71 miles
|
HubInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
8.72 miles
|
John Marshall Commons Tech Park
|
CTP-II LLC plans to rezone 22.72 acres at the intersection of Catharpin Road and John Marshall Highway from business and light industrial to office mid-rise to construct the data center.
|
|
8.80 miles
|
Prime RidgeInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
8.84 miles
|
Hub BetaInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
8.93 miles
|
Compass: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
8.94 miles
|
Tower ProInterested in this information?Contact us
|
The Village Place Technology Park project comprises four two-story data centers, ranging from 114,330 sq ft to 132,750 sq ft, built on the site.
|
|
9.66 miles
|
QTS: Prince William Digital Gateway Campus
|
A judicial ruling voided the massive Digital Gateway data center project, but the developers and county are appealing the decision, leaving the 1.7-gigawatt plan in doubt.
|
|
9.80 miles
|
CyrusOne: Vint Hill
|
CyrusOne LLC, a data center developer and operator, submitted its first site plan to the county in March for an 870,000-square-foot data center campus.
|
|
9.81 miles
|
OVH US East Vint Hill
|
This facility, situated on the grounds of a former Army base in Vint Hill, became OVHcloud's first U.S. data center and officially began operations in 2017.
|
|
9.91 miles
|
OVH: Vint Hill Bldg 2
|
OVHcloud currently plans an expansion of its existing data center, which currently calls the Vint Hill Business Park home.
|
|
10.34 miles
|
Vint Hill Corners
|
The Vint Hill Corners data center campus proposal, submitted by a company called Vint Hill Corners LLC, which owns about 80 acres on Brookside Parkway, seeks to develop two one-story data centers on about 50 acres of property at 4295 Aiken Drive in Vint Hill.
|
|
10.56 miles
|
Campus BetaInterested in this information?Contact us
|
|
|
10.76 miles
|
Point TwoInterested in this information?Contact us
|
|
|
10.77 miles
|
ParkInterested in this information?Contact us
|
|
|
10.79 miles
|
CentralInterested in this information?Contact us
|
|
|
10.85 miles
|
Parkstone Tech Park
|
|
|
12.17 miles
|
Dulles South Innovation Center
|
The application for the Dulles South Innovation Center data center project in Prince William County, Virginia, has been withdrawn following overwhelming opposition and a unanimous rejection by county supervisors.
|
|
12.58 miles
|
RidgeInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
12.59 miles
|
North ParkInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
12.72 miles
|
Ridge PrimeInterested in this information?Contact us
|
AWS operates three data centers at 4100, 4101, and 4155 Westfax Drive, which together comprise 220,800 square feet.
|
|
12.97 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon Web Services (AWS) has executed a lease with Penzance and will be responsible for operating and staffing the data center.
|
|
12.99 miles
|
Penzance: Chantilly Premier
|
Real estate firm Penzance has commenced construction on a new, three-story data center in Chantilly, Virginia.
|
|
13.05 miles
|
Cloud HubInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
13.05 miles
|
MetroInterested in this information?Contact us
|
Amazon's Mallory Drive data center campus is located on part of the land it bought at 3980 Virginia Mallory Dr in Chantilly in 2021.
|
|
13.19 miles
|
Plaza PlusInterested in this information?Contact us
|
|
|
13.28 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
|
13.49 miles
|
Starwood: Stonecroft Blvd, Chantilly
|
Starwood Capital Group secured approval from the Fairfax County Board of Supervisors to purchase 41.7 acres of county-owned land at 3721 Stonecroft Boulevard in Chantilly, Virginia, for $166.8 million ($4M/acre).
|
|
13.57 miles
|
Global RidgeInterested in this information?Contact us
|
|
|
13.58 miles
|
Center GammaInterested in this information?Contact us
|
|
|
13.60 miles
|
TwoInterested in this information?Contact us
|
|
|
13.63 miles
|
EdgeInterested in this information?Contact us
|
|
|
13.65 miles
|
CampusInterested in this information?Contact us
|
|
|
13.70 miles
|
Campus ProInterested in this information?Contact us
|
|
|
13.73 miles
|
ProInterested in this information?Contact us
|
|
|
13.74 miles
|
PrimeInterested in this information?Contact us
|
|
|
13.77 miles
|
ThreeInterested in this information?Contact us
|
|
|
13.97 miles
|
East CampusInterested in this information?Contact us
|
|
|
13.98 miles
|
TwoInterested in this information?Contact us
|
Amazon Data Services Inc. recently acquired a 24.6-acre property at 44150 Wade Drive in Chantilly from Firefox LLC for $34.44 million.
|
|
14.00 miles
|
South ParkInterested in this information?Contact us
|
|
|
14.01 miles
|
Tower TwoInterested in this information?Contact us
|
In July 2020, AWS proposed building 1.75 million square feet of data center space on the property.
|
|
14.06 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
14.14 miles
|
NorthInterested in this information?Contact us
|
|
|
14.48 miles
|
CoreInterested in this information?Contact us
|
|
|
14.58 miles
|
PrimeInterested in this information?Contact us
|
|
|
14.60 miles
|
Center ProInterested in this information?Contact us
|
|
|
14.66 miles
|
GammaInterested in this information?Contact us
|
|
|
14.91 miles
|
Menlo: MD-DC1 (Herndon)
|
Construction on the massive 307,498 sq. ft., two-story data center (acquired in June 2023) kicked off in late 2025.
|
|
15.31 miles
|
Maple Tree Farm
|
A 145-acre property known as Maple Tree Farm, located just east of Warrenton, is being marketed as a potential data center location.
|
|
15.32 miles
|
ProInterested in this information?Contact us
|
|
|
15.37 miles
|
Core PointInterested in this information?Contact us
|
|
|
15.41 miles
|
East StationInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
15.45 miles
|
Point UltraInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
15.47 miles
|
West ParkInterested in this information?Contact us
|
|
|
15.52 miles
|
Core ValleyInterested in this information?Contact us
|
The project, Renaissance Technology Park, is set to transform nearly 60 acres of existing warehouse space into a 2.14-million-square-foot data center complex.
|
|
15.52 miles
|
GammaInterested in this information?Contact us
|
|
|
15.58 miles
|
North CenterInterested in this information?Contact us
|
|
|
15.61 miles
|
CentralInterested in this information?Contact us
|
This data center is a part of Amazon's Renaissance Technology Park project in Fairfax County.
|
|
15.68 miles
|
PowerHouse Arcola
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
15.71 miles
|
PowerHouse: Arcola Bldg B
|
Sat on 23 acres in Arcola’s Arcola Boulevard, PowerHouse Arcola will comprise two two-story buildings and 12 data halls across 614,300 sq ft (57,070 sqm).
|
|
15.72 miles
|
CampusInterested in this information?Contact us
|
Amazon Web Services' plans to build a 220,000-square-foot data center at the intersection of Blackwell Road and Lee Highway in Warrenton.
|
|
15.78 miles
|
East ParkInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located near 41992 John Mosby Highway in the southwestern vicinity of Dulles International Airport.
|
|
15.81 miles
|
Cloud TowerInterested in this information?Contact us
|
Amazon Web Services (AWS) is constructing a massive data center campus spanning across three buildings on a 90-acre site located at 42139 Reeds Farm Lane, southwest of Dulles International Airport.
|
|
15.91 miles
|
Central CenterInterested in this information?Contact us
|
|
|
15.92 miles
|
Edge CampusInterested in this information?Contact us
|
|
|
15.93 miles
|
JK Land: Technology Park 3
|
To create an industrial park, JK Land Holdings has proposed rezoning 21.23 acres from Rural Commercial to Planned Development.
|
|
16.00 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
16.03 miles
|
ParkInterested in this information?Contact us
|
|
|
16.03 miles
|
Yondr: Arcola Expansion
|
Yondr is planning to expand capacity on an adjacent parcel of land.
|
|
16.05 miles
|
East CampusInterested in this information?Contact us
|
|
|
16.09 miles
|
JK Land: Technology Park 2
|
Approved in 2022, the 869,000-square-foot JK Technology Park 2 is slated for construction directly south of the subdivision.
|
|
16.16 miles
|
Yondr: Arcola Bldg 2
|
In February 2024, Yondr Group started construction on a second building at its Loudoun County data center campus in Virginia.
|
|
16.16 miles
|
Hiddenwood Assemblage Campus
|
The Loudoun County Planning Commission recommends approving a proposal allowing Arcola homeowners to sell their land for a data center project.
|
|
16.19 miles
|
East StationInterested in this information?Contact us
|
Microsoft's single-story data center building, known as IAD11, is located at 41840 Growth Mindset Ln, Stone Ridge. The facility comprises 244,713 square feet of gross floor area (GFA).
|
|
16.21 miles
|
Valley ThreeInterested in this information?Contact us
|
Amazon's fourth data center building, known as Building D at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
16.22 miles
|
Yondr: Arcola Bldg 1
|
Yondr Group's Project Allegro South Campus is located in Loudoun County, Virginia. The company started construction on the facility in 2022, and the first phase became operational in 2024.
|
|
16.23 miles
|
RidgeInterested in this information?Contact us
|
Amazon IAD125, also referred to as Building B, is a two-story structure facility with a total area of 206,194 square feet.
|
|
16.29 miles
|
ParkInterested in this information?Contact us
|
Microsoft is constructing another single-story data center building known as IAD12 at it's Aldie Campus. The facility will span 148,233 square feet at full build out.
|
|
16.33 miles
|
Plaza TwoInterested in this information?Contact us
|
Amazon's third data center building, known as Building C at its Quail Ridge campus, is a two-story data center spanning 275,500 square feet.
|
|
16.34 miles
|
HubInterested in this information?Contact us
|
Amazon IAD124, also referred to as Building A, is a two-story structure facility with a total area of 206,194 square feet.
|
|
16.39 miles
|
BetaInterested in this information?Contact us
|
The data center building IAD-122 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
16.40 miles
|
North PlazaInterested in this information?Contact us
|
Microsoft's single-story data center building known as IAD13 at its Aldie Campus spans 102,022 square feet at full build-out.
|
|
16.45 miles
|
Global StationInterested in this information?Contact us
|
The data center building IAD-121 is a part of Amazon's Erin's Run Campus. The Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
16.53 miles
|
ProInterested in this information?Contact us
|
Amazon's Erin's Run Campus consists of three data center buildings located at 23825 Erin's Run Dr, Sterling, VA, just west of Dulles International Airport.
|
|
16.54 miles
|
CyrusOne: NVA9 Bldg-1A
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
16.55 miles
|
JK Land: Technology Park 1
|
In 2020, supervisors approved the 3-million-square-foot JK Technology Park 1, owned by JK Land Holdings, which borders Briarfield Estates to the north.
|
|
16.60 miles
|
CyrusOne: NVA9 Bldg-2
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
16.60 miles
|
Plaza GammaInterested in this information?Contact us
|
Real estate investment firm BlackChamber Group is planning to build a 1.7 million-square-foot (157,900 sqm) data center campus in Arcola, in Virginia’s Loudoun County.
|
|
16.61 miles
|
CyrusOne: NVA9 Bldg-1B
|
CyrusOne's NVA9 facility, located at 43290 Old Ox Road, is a 700,000 square foot data center campus.
|
|
16.62 miles
|
JK Land: Tech Park 1 Expansion
|
|
|
16.68 miles
|
Digital Realty Dulles Expansion
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
|
16.75 miles
|
Digital Realty: IAD44
|
IAD44 is The first data center building located in the Dulles Campus of Northern Virginia.
|
|
16.75 miles
|
Stack: Loudoun 2
|
Loudoun 2 is the second of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
16.78 miles
|
Stack: Loudoun 1
|
Loudoun 1 is the first of two two-story buildings planned on STACK's 122-acre Arcola (Loudoun County) campus on Evergreen Mills Road near Dulles.
|
|
16.79 miles
|
Global ParkInterested in this information?Contact us
|
The site was previously occupied by two office buildings that were constructed about 10 years ago but never fully occupied. These buildings, located at 7951 and 7961 Loisdale Road, were demolished in early June 2023.
|
|
16.81 miles
|
Prologis: Sterling, VA
|
In Sterling, Virginia, Prologis is seeking to rezone a 94-acre property comprised of three parcels on Pebble Run Place, Erins Run Drive, and Carters School Road.
|
|
16.85 miles
|
Digital Realty: IAD45
|
This facility is part of the Digital Dulles Campus in Sterling, VA.
|
|
16.88 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
|
17.27 miles
|
CoreSite: VA3
|
CoreSite is developing another 12,000 sq ft (1,115 sqm) data hall on the VA3 site, scheduled for completion in 2025.
|
|
17.52 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
|
17.52 miles
|
CoreSite: VA1
|
CoreSite’s Reston data center (VA1) is part of the Reston campus that is comprised of more than 1.3 million square feet of colocation space upon full build-out.
|
|
17.56 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
|
17.60 miles
|
CoreSite: VA2
|
|
|
17.97 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.98 miles
|
Cogent: 510 Huntmar
|
Cogent exited the data center and it is currently available to lease.
|
|
18.02 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
18.06 miles
|
H5: Herndon
|
|
|
18.10 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
18.10 miles
|
Dulles 2000 Campus
|
BlackChamber Group's proposed development includes two data center buildings, totaling 530,000 square feet with a 0.44 floor area ratio.
|
|
18.13 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
18.16 miles
|
Lumen Herndon 3
|
|
|
18.17 miles
|
Lumen Herndon 1
|
|
|
18.23 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
|
18.26 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
|
18.30 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
|
18.34 miles
|
Csquare: Dulles IAD3
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
|
18.45 miles
|
OneInterested in this information?Contact us
|
|
|
18.47 miles
|
West RidgeInterested in this information?Contact us
|
|
|
18.52 miles
|
Ridge BetaInterested in this information?Contact us
|
|
|
18.55 miles
|
Central RidgeInterested in this information?Contact us
|
|
|
18.63 miles
|
TwoInterested in this information?Contact us
|
|
|
18.65 miles
|
South TowerInterested in this information?Contact us
|
|
|
18.70 miles
|
Prologis: Global Plaza Rd
|
Prologis is seeking to convert existing warehouses into data centers in Sterling, Virginia, and expand their capacity.
|
|
18.72 miles
|
Center AlphaInterested in this information?Contact us
|
|
|
18.72 miles
|
CloudInterested in this information?Contact us
|
|
|
18.73 miles
|
Centersquare: IAD2-B
|
|
|
18.75 miles
|
Centersquare: IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
|
18.77 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
|
18.80 miles
|
Global TowerInterested in this information?Contact us
|
|
|
18.80 miles
|
PlazaInterested in this information?Contact us
|
|
|
18.85 miles
|
Station OneInterested in this information?Contact us
|
|
|
18.87 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
|
18.88 miles
|
Plaza UltraInterested in this information?Contact us
|
|
|
18.88 miles
|
Aligned IAD03
|
Aligned IAD-03 is Aligned's third data center in Northern Virginia and first in Sterling. The four-story hyper-scale data center building offers 72MW across 430,000 sq ft (40,000 sq m).
|
|
18.94 miles
|
Peterson: Silverbrook
|
Peterson Companies plans to construct two data centers in Dulles, Virginia. The data center project will be situated near 22900 Platform Plaza, west of Sully Road and south of S. Sterling Boulevard, in Loudoun County. Dubbed the Silverbrook Project, the company intends to develop two 27,000 sq ft (2,500 sqm) buildings on the currently undeveloped 16-acre site.
|
|
18.95 miles
|
Prologis: Executive Drive
|
The Loudoun County Planning Commission has voted to recommend the approval of a new Prologis data center in Sterling, Virginia.
|
|
18.97 miles
|
TowerInterested in this information?Contact us
|
|
|
19.02 miles
|
North ParkInterested in this information?Contact us
|
|
|
19.04 miles
|
Edge RidgeInterested in this information?Contact us
|
|
|
19.05 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
19.06 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
19.10 miles
|
Metro PointInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
19.11 miles
|
South ParkInterested in this information?Contact us
|
|
|
19.12 miles
|
CenterInterested in this information?Contact us
|
|
|
19.15 miles
|
44351 Import Plz
|
|
|
19.15 miles
|
Plaza PrimeInterested in this information?Contact us
|
|
|
19.16 miles
|
Center ProInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
19.19 miles
|
CoreInterested in this information?Contact us
|
|
|
19.20 miles
|
GammaInterested in this information?Contact us
|
Amazon Data Services acquired a 33-acre property known as TransDulles Centre 2 at 45900 Pathfinder Plaza on June 2024 for $135.75 million.
|
|
19.21 miles
|
Import Plz, Ashburn
|
|
|
19.22 miles
|
GammaInterested in this information?Contact us
|
|
|
19.22 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
|
19.22 miles
|
QTS: ASH2 DC2
|
ASH2 DC2 is the second of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44655 Quality Tech Lane in Sterling, Virginia.
|
|
19.22 miles
|
Digital Realty: IAD55
|
Digital Realty's Digital Sterling project features a three-story building situated on a 22-acre plot at the intersection of Route 28 and Pacific Boulevard in Sterling.
|
|
19.25 miles
|
Valley GammaInterested in this information?Contact us
|
|
|
19.27 miles
|
QTS: ASH2 DC1
|
ASH2 DC1 is the first of two bookend buildings on the QTS Ashburn 2 Lockridge campus, at 44675 Quality Tech Lane in Sterling, Virginia.
|
|
19.27 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
|
19.30 miles
|
EdgeCore: Ashburn AS02
|
EdgeCore Digital Infrastructure is teaming up with Washington, D.C.-based developer Penzance on a new 260,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Virginia.
|
|
19.32 miles
|
QTS Ashburn-Shellhorn DC1
|
ASH3 DC1 is the first of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in March 2021.
|
|
19.38 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
19.38 miles
|
Connect Data Centers: Sterling, VA
|
|
|
19.38 miles
|
QTS Ashburn-Shellhorn DC2
|
ASH3 DC2 is the second of two Freedom Standard buildings on QTS's Ashburn 3 (Shellhorn) campus; completed in September 2022.
|
|
19.47 miles
|
Stack: NVA04A
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
|
19.47 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
|
19.48 miles
|
CoreInterested in this information?Contact us
|
|
|
19.50 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
|
19.52 miles
|
StationInterested in this information?Contact us
|
|
|
19.54 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
|
19.56 miles
|
Stack: NVA04B
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
19.57 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
|
19.57 miles
|
Vantage VA16
|
VA16 is the sixth and final planned building on Vantage's Ashburn VA1 campus, on a 10-acre extension at 22321 Pacific Blvd in Sterling, Virginia.
|
|
19.58 miles
|
Vantage: VA23
|
VA23 is the third building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
19.59 miles
|
Vantage: VA21
|
VA21 is the first building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia. The 354,500 sq ft building opened in 2024.
|
|
19.59 miles
|
43881 Devin Shafron (Bldg B)
|
|
|
19.61 miles
|
Vantage VA15
|
VA15 is the fifth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; Vantage topped it out in July 2025.
|
|
19.62 miles
|
CloudHQ: LC8
|
CloudHQ plans to invest $400 million in building a three-story facility totaling 805,600 square feet on its Ashburn Data Center Campus. LC8 will be located adjacent to CloudHQ's LC4 facility at 22200 Loudoun County Parkway.
|
|
19.62 miles
|
Menlo: MD-DC2 (Sterling)
|
Menlo Digital Acquired a 32.2-acre Loudoun County site with an existing office building in June 2024. A four-story 600,742 square foot data center is scheduled for delivery in 2Q28.
|
|
19.63 miles
|
Stack: NVA04C
|
This facility is part of Stack Infrastructure's 80-acre NVA04 campus in Northern Virginia.
|
|
19.63 miles
|
43831 Devin Shafron (Bldg C)
|
|
|
19.63 miles
|
CloudHQ: LC4
|
CloudHQ's LC4 is a massive three-story data center spanning 1.4 million square feet. Located at 22210 Loudoun County Parkway on a nearly 27-acre plot, this facility received county approval in September 2022. The estimated cost for LC4's construction was $1 billion.
|
|
19.63 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
|
19.65 miles
|
43915 Devin Shafron (Bldg A)
|
|
|
19.66 miles
|
Vantage: VA22
|
VA22 is the second building on Vantage Data Centers' Ashburn II (VA2) campus at 22435 Glenn Drive, Sterling, Virginia.
|
|
19.67 miles
|
West PointInterested in this information?Contact us
|
|
|
19.67 miles
|
43791 Devin Shafron (Bldg D)
|
|
|
19.70 miles
|
Digital Realty: IAD43
|
|
|
19.72 miles
|
Sentinel: Cloud Plaza, Sterling, VA
|
GI Partners, operating as GI TC Loudoun LLC, finalized the $709 million purchase of the Cloud Plaza data center from Sentinel Ashburn II LLC (Sentinel Data Centers) on May 19, 2022.
|
|
19.73 miles
|
CloudHQ: LC9
|
The Data Center building referred to as LC9 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
19.74 miles
|
CloudHQ: LC10
|
The Data Center building referred to as LC10 will be a part of CloudHQ's Ashburn Data Center Campus located at 22210 Loudoun County Parkway, Ashburn.
|
|
19.75 miles
|
Deft: DRT-IAD1
|
|
|
19.75 miles
|
43830 Devin Shafron (Bldg F)
|
|
|
19.75 miles
|
Cogent Vienna
|
|
|
19.79 miles
|
43790 Devin Shafron (Bldg E)
|
|
|
19.81 miles
|
Vantage VA12
|
VA12 is the second building on Vantage's Ashburn VA1 campus at 45194 Vantage Data Plaza in Sterling, Virginia; it opened in 2019.
|
|
19.82 miles
|
SAMX data center campus
|
SAMX Data LLC submitted an application in October 2023 to rezone approximately 55.26 acres of property at 11825 Remington Road.
|
|
19.82 miles
|
Equinix Vienna DC7
|
|
|
19.84 miles
|
Element Critical VA1
|
|
|
19.84 miles
|
8100 Boone - Digital Realty
|
|
|
19.85 miles
|
CloudHQ: LC13
|
The Data Center building referred to as LC13 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
19.85 miles
|
CloudHQ: LC12
|
The Data Center building referred to as LC12 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
19.85 miles
|
PowerHouse: Pacific Bldg C
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
19.86 miles
|
Vantage VA11
|
VA11 (also known as VA1) is the first building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in Q1 2019.
|
|
19.88 miles
|
Starwood: Alexandria, VA
|
Starwood Capital's re-proposed data center in Alexandria, Virginia, is moving forward despite strong community opposition.
|
|
19.88 miles
|
Vantage VA14
|
VA14 is the fourth building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2024.
|
|
19.89 miles
|
Vantage VA13
|
VA13 is the third building on Vantage's Ashburn VA1 campus in Sterling, Virginia; it opened in 2023.
|
|
19.90 miles
|
PowerHouse: Pacific Bldg B
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
19.93 miles
|
CloudHQ: LC14
|
The Data Center building referred to as LC14 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
19.94 miles
|
Digital Realty: Broderick Drive
|
|
|
19.95 miles
|
CloudHQ: LC11
|
The Data Center building referred to as LC11 will be a part of CloudHQ's Ashburn Data Center Campus located at 22141 Loudoun County Parkway, Ashburn.
|
|
19.99 miles
|
PowerHouse Pacific
|
On Sterling’s Pacific Boulevard, PowerHouse Pacific will comprise three three-story buildings totaling 24 data halls across 1.1 million sq ft (102,200 sqm). Construction is due to start in 2024 and complete in 2026/2027.
|
|
20.00 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|