Campus at a Glance

10 data centers on this campus
First built in 2029 with expansions through 2035
Coordinates: 55.14885, -1.53094
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The QTS/Blackstone data center project in Cambois, Northumberland, has officially transitioned from the planning stages to an active construction site. Following the initial outline permission granted in March 2025, the Northumberland County Council issued final "Reserved Matters" approval for the first phase on December 2, 2025. This critical milestone has green-lit the development of the first two data centers, effectively moving the project beyond conceptual designs and into physical realization.

The project, situated on the 100-hectare site of the former Blyth Power Station, is set to become a massive ten-building campus totaling 5.8 million square feet of internal space. Each of the ten proposed three-story buildings will offer approximately 54,000 square meters of floor area. To support this scale, the facility will include a dedicated on-site substation providing a massive 720MW capacity and will utilize high-efficiency, closed-loop water cooling systems to ensure the campus operates with a minimized environmental footprint.

Site preparation, or "enabling works," officially commenced in October 2025 following a formal groundbreaking ceremony. Current activity on-site, led by contractors such as Rainton Construction, involves extensive site clearance, vegetation removal, and major earthworks to establish the foundations for the initial halls. The project’s progress has been significantly bolstered by its designation as an "AI Growth Zone," a status that helped fast-track essential power connections and planning procedures.

Looking ahead, vertical construction of the first buildings is scheduled to begin in early 2026. If the current timeline holds, the first phase of the campus is expected to be operational by 2029. While this initial stage is the immediate priority, the long-term vision for the site is extensive, with the full ten-building campus slated for final completion by 2035.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
QTS: Cambois DC1 QTS Data Centers
Planned
— — 2029
QTS: Cambois DC2 QTS Data Centers
Planned
— — 2029
QTS: Cambois DC3 QTS Data Centers
Planned
— — 2031
QTS: Cambois DC4 QTS Data Centers
Planned
— — 2031
QTS: Cambois DC5 QTS Data Centers
Planned
— — 2032
QTS: Cambois DC6 QTS Data Centers
Planned
— — 2032
QTS: Cambois DC7 QTS Data Centers
Planned
— — 2034
QTS: Cambois DC8 QTS Data Centers
Planned
— — 2034
QTS: Cambois DC10 QTS Data Centers
Planned
— — 2035
QTS: Cambois DC9 QTS Data Centers
Planned
— — 2035

Map and Nearby Locations

QTS: Cambois Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?