Vaultica: STO01A
Vaultica's STO01A is a carrier-neutral colocation data center in Upplands Väsby, north of Stockholm, inside a converted factory building. DigiPlex opened it in 2016; it became STACK in 2022 and Vaultica in 2025.
Vaultica runs carrier-neutral enterprise colocation in five European metros: Milan, Geneva, Copenhagen, Stockholm and Oslo. Its seven data centers serve telecom carriers, IT and cloud providers, and financial institutions. At MIL01 in Siziano and GEN02 in Gland, it sells colocation inside buildings that STACK still runs. It is building MIL03 in Settimo Milanese and plans MAD01 in Alcalá de Henares, near Madrid.
Infrastructure funds managed by Apollo own the company. Apollo agreed on 29 April 2025 to buy STACK Infrastructure's European colocation business from Blue Owl Digital Infrastructure. The carve-out closed on 13 August 2025. STACK had set up the colocation unit in 2024, and it kept its European hyperscale business. The carved-out business launched as Vaultica on 10 December 2025.
IPI Partners merged DigiPlex and SUPERNAP Italia into STACK EMEA in March 2022 and later added Safe Host.
Vaultica's STO01A is a carrier-neutral colocation data center in Upplands Väsby, north of Stockholm, inside a converted factory building. DigiPlex opened it in 2016; it became STACK in 2022 and Vaultica in 2025.
Vaultica's GEN01 is a colocation data center in Plan-les-Ouates, on Geneva's southern edge. Safe Host opened it in 2002 as SH1, its first site; it became STACK in 2022 and Vaultica in 2025.
Vaultica's COP01 is a carrier-neutral colocation data center on three floors of a concrete building on Holmbladsgade, central Copenhagen. Telia sold it to DigiPlex in 2018; it became STACK in 2022 and Vaultica in 2025.
Vaultica's MAD01 is a planned colocation data center campus in the Los Salobrales industrial estate in Alcalá de Henares, about 25 km from Madrid. It is Vaultica's first site in Spain and sits within an existing industrial complex.
Vaultica sells carrier-neutral colocation inside STACK's GEN02 data center in Gland, between Geneva and Lausanne. The business was part of STACK until Apollo-managed funds bought it in 2025.
Vaultica's MIL03 is a new colocation data center on Via Marisa Bellisario in Settimo Milanese, west of Milan. It is built for enterprise, cloud and AI workloads, with modular data halls and a dedicated office building.
Vaultica sells carrier-neutral enterprise colocation on STACK's MIL01 campus in Siziano, south of Milan. The business was part of STACK until Apollo-managed funds bought it in 2025.
Vaultica's OSL01 is a carrier-neutral colocation data center in Oslo's Økern district, in a building put up in 1981 as the Norwegian government's data hub. DigiPlex ran it from 2001; it became STACK in 2022 and Vaultica in 2025.
Vaultica's OSL02 is an underground colocation data center in former IBM bunkers beneath the Rosenholm Business Center, south of Oslo. DigiPlex rebuilt and opened it in 2010; it became STACK in 2022 and Vaultica in 2025.
November 17, 2026 Milan
CBRE forecasts 255MW of new data center capacity in Milan by 2028, which would move the city ahead of Dublin as Europe's fifth-largest market. The forecast appears in CBRE's Q3 2026 European Data Centres report, which puts Milan and Dublin about 100MW of operational capacity apart at the...
Read more
November 10, 2026 Milan
More than 1,000 people gathered in Piazza della Scala in Milan on Oct. 10 to oppose new data center construction in Lombardy, Il Giorno reported. The rally was the first national demonstration called by the National Network of Stop Data Center Committees. Organizers want the national government...
Read more
October 27, 2026 Copenhagen
CoreWeave has brought most of its planned 22.5MW of IT capacity online at atNorth's DEN01 data center in the Copenhagen metro, its first deployment in Denmark. The company announced the activation from London on October 27. atNorth owns and operates DEN01, a colocation site in Ballerup,...
Read more
October 21, 2026 Geneva
NorthC has started construction on its sixth data center in Switzerland, a 4.5MW facility in Meyrin on the edge of Geneva. The building at The Hive technology park will deliver 4.5MW of IT capacity across 5,400 square meters (58,125 sq ft), released in phases of 1.5MW, according to NorthC's...
Read more
October 21, 2026 Oslo
Magnora Data Center ASA has acquired an operating data center in Oslo from an international telecom operator, adding up to 2MW of IT load. The seller is not named, and financial terms were not disclosed. Magnora Data Center owns 75 percent of the facility, and Blix Group AS, the owner of...
Read more
September 08, 2026 Milan
UK infrastructure developer Greenfield and Finsbury Infrastructure plan to invest up to €360 million ($418m) to develop a 36MW data center east of Milan, Italy. Greenfield has already secured 80MW of power capacity for the site, which will support AI, cloud, and enterprise workloads while...
Read moreTell us what you're looking for. We respond within one business day.