Waco (Central Texas) Data Center Market

Latest Podcast
Central Texas, from Waco to Bryan, sits on the Interstate 35 and Interstate 45 corridors between Dallas-Fort Worth, Austin and Houston. Hyperscale campuses now rise beside the region's power plants, next to a small colocation market. Grid queues, county pushback and a state permit freeze set the pace. Read More

Market Facts

Waco (Central Texas) Data Center Map

Waco (Central Texas) Power Growth Over Time

+6783% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Waco (Central Texas)

CyrusOne
Site
Power
Operational
0
0.0
Construction
8
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
8
View Provider
Anthropic
Site
Power
Operational
0
0.0
Construction
3
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Riot Platforms
Site
Power
Operational
1
400.0
Construction
1
Planned
2
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
2
Decommissioned
0
Totals
2
View Provider
Meta
Site
Power
Operational
0
0.0
Construction
3
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider

Largest Data Centers in Waco (Central Texas)

Location About Total SqFt Power (MW)
PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Fibertown Bryan
In 2023, infrastructure fund Aphorio Carter acquired a Bryan, Texas data center leased to colocat...
NN Request Dataset NN Request Dataset
Aphorio Carter: Bryan, TX
In 2023, infrastructure fund Aphorio Carter acquired a Bryan, Texas data center leased to colocat...
NN Request Dataset NN Request Dataset
Texas A&M: West Campus Data Center
Texas A&M University runs its West Campus Data Center on Agronomy Road in College Station, Texas.
NN Request Dataset NN Request Dataset
DataBank Waco ACT1
DataBank Waco ACT1 is a colocation data center in a hardened downtown Waco, Texas building that o...
NN Request Dataset NN Request Dataset

About This Metro

Overview

Waco (Central Texas) spans the counties between Dallas-Fort Worth, Austin and Houston, from Hill and Bosque counties south to the Brazos Valley around Bryan. Interstate 35 and Interstate 45 cross it on their way between those metros. Its colocation market is small and sits in downtown Waco and downtown Bryan. Since 2025 the region has become one of the busiest AI campus markets in Texas. Developers build beside its gas and coal plants, or bring their own gas generation.

History

Telephone companies built the region's first data facilities. Southwestern Bell, GTE and United Telephone opened central offices across the region from the 1930s on. AT&T, Verizon and Brightspeed still run many of them. FiberTown opened its Bryan data center downtown in 2007. In 2009 Clearview International opened the Information Technology Gateway in a hardened former fallout shelter in downtown Waco. Zayo bought Clearview in April 2016. DataBank bought zColo's US data centers, including Waco, in December 2020. In February 2023 the infrastructure fund Aphorio Carter bought FiberTown's Bryan property, and FiberTown stayed on under a net lease.

Power plants shaped the region long before data centers arrived. For decades, lignite mines fed large coal plants in Freestone, Limestone and Grimes counties. Two of them closed in 2018: Big Brown near Fairfield and Gibbons Creek in Grimes County. The Sandy Creek plant near Riesel opened in 2013 as the newest large coal plant in the US. Winter Storm Uri hit the grid in February 2021. It left Waco-based Brazos Electric Power Cooperative owing about $1.9 billion to the Electric Reliability Council of Texas (ERCOT). The cooperative filed for bankruptcy on March 1, 2021.

The AI wave reached the region in 2025. In July 2025 Calpine and CyrusOne announced a powered-land campus beside Calpine's Thad Hill Energy Center in Bosque County. The two companies expanded the deal that November. In February 2026 CyrusOne signed a second deal with Calpine, by then part of Constellation, at the Freestone Energy Center near Fairfield. It broke ground there in June 2026.

The Market Today

DataBank's Waco ACT1 serves enterprise colocation customers downtown, and Lumen runs a long-haul fiber node with a small colocation room. In the Bryan area, FiberTown hosts a point of the FD-IX Houston internet exchange, and Crosspoint Data offers colocation and disaster recovery space. Texas A&M University runs its own West Campus Data Center. Duos Edge AI opened a modular edge data center for area schools in Waco in 2026.

The wholesale pipeline sits in the countryside along I-35 and I-45. CyrusOne is building five buildings on its Bosque County campus near Lake Whitney, and state records list Google and Amazon as occupants. Three more CyrusOne buildings are rising at Fairfield, where state records list a Meta subsidiary. Operators often market these campuses under Dallas-Fort Worth names, though they sit 100 km or more south of Dallas. Nexus Data Centers is building its Apex campus outside Hubbard on its own natural-gas generation. State records list Anthropic as its occupant.

A long pipeline of planned campuses follows. Cipher Digital plans a campus beside the Sandy Creek plant near Riesel. Galaxy Digital bought about 500 acres in McGregor. Infrakey DC Parks plans a park near Elm Mott, north of Waco. NRG Energy plans data centers beside a new gas plant on former mine land near Jewett. In Hill and Leon counties, RCM Hill, Provident, Belltown Power and Crusoe have proposed large campuses. On the RELLIS campus in Bryan, ThisWay Global is finishing an AI compute center it bought out of bankruptcy.

Advantages

  • Power plant sites. Large gas and coal plants dot the region, with transmission already built. Calpine's deals with CyrusOne show how a plant owner can sell land, power and grid access together.
  • Natural gas. Pipelines cross the region, so developers can build their own generation on site.
  • Location. The region sits in the Texas Triangle between Dallas-Fort Worth, Austin and Houston. I-35 and I-45 link it to all three metros.
  • Land. Ranchland, former mine land and industrial parks offer parcels of hundreds or thousands of acres.
  • Taxes. Texas levies no personal income tax. Qualifying data centers can claim a state sales tax exemption on equipment and electricity.
  • Talent. Baylor University, Texas State Technical College and Texas A&M University train engineers and technicians.

Challenges

  • Grid queue. By mid-2026 ERCOT tracked more than 400 GW of large-load requests, mostly from data centers. Its first batch of large-load connections awaits final classification in December 2026.
  • State permit freeze. In September 2026 Governor Greg Abbott told the Texas Commission on Environmental Quality (TCEQ) to hold data center air permits during a state audit. Governor-elect Gina Hinojosa has pledged to freeze new approvals until the Legislature acts in 2027.
  • Local opposition. Residents have packed hearings in Lacy Lakeview, McGregor, Hillsboro and Leon County over noise, traffic and water. In April 2026 Nexus withdrew a Hill County tax abatement request after residents objected.
  • Shifting county rules. Texas counties have no general zoning power. Hill County paused new data centers in May 2026, then rescinded the pause in June after a developer sued.
  • Water. Cooling water is a top local worry in a drought-prone state. Developers answer with closed-loop cooling and treated wastewater.

Trends

  • Campuses move to the power plant. CyrusOne's two Calpine campuses, Cipher's Sandy Creek site and NRG's Jewett project pair data halls with power plants. In May 2026 the Public Utility Commission of Texas (PUCT) approved the Freestone co-location, with conditions.
  • Hyperscalers arrive as tenants. State records name Google, Amazon, Meta and Anthropic as occupants of developer-built campuses in the region.
  • Developers bring their own power. Nexus, Infrakey and Belltown plan on-site gas generation beside or in place of grid power.
  • Crypto firms turn to AI. Cipher Mining renamed itself Cipher Digital in February 2026 as it moved from bitcoin mining to AI hosting. Galaxy Digital chose McGregor for its second Texas AI campus.
  • Nuclear on the horizon. In February 2025 the Texas A&M University System chose four developers to build small reactors at its RELLIS campus in Bryan.

Power and Policy

ERCOT runs the grid across the region, and the PUCT regulates it. Oncor delivers power in Waco, and Bryan Texas Utilities serves Bryan. Cooperatives such as Heart of Texas, HILCO and Navarro County Electric Cooperative serve rural areas. Brazos Electric Power Cooperative, based in Waco, sells wholesale power to member cooperatives. Senate Bill 6, signed in June 2025, makes new loads of 75 MW or more share their interconnection costs. It also requires those loads to accept curtailment during grid emergencies. The TCEQ issues air permits for on-site gas plants.

Get Quotes

Related News See all

Read Mubbadrah Consortium Plans $3B, 400MW AI Campus in Oman; Crusoe Eyes Offtake
A consortium led by Omani investment group Mubbadrah Investment plans an AI data center campus of up to 400 MW in Salalah, [Oman](https://baxtel.com/regions/oman), backed by $3 billion of initial i...

Mubbadrah Consortium Plans $3B, 400MW AI Campus in Oman; Crusoe Eyes Offtake

November 11, 2026 Oman

A consortium led by Omani investment group Mubbadrah Investment plans an AI data center campus of up to 400 MW in Salalah, Oman, backed by $3 billion of initial investment, DCD reported Wednesday. US AI infrastructure firm Crusoe has indicated interest in becoming an off-taker. The facility would...

Read more
Read Riot Leases 910MW Corsicana Campus To Anthropic In $28B Deal
[Riot Platforms](https://baxtel.com/data-centers/riot-platforms) has signed a 15-year lease for its entire Corsicana data center campus in [Texas](https://baxtel.com/regions/texas), a contract valu...

Riot Leases 910MW Corsicana Campus To Anthropic In $28B Deal

November 10, 2026 Riot Platforms

Riot Platforms has signed a 15-year lease for its entire Corsicana data center campus in Texas, a contract valued at about $28 billion. The lease covers 910MW of critical IT capacity, and Bitcoin Magazine reports that Riot's 10-Q filing names the tenant as Anthropic PBC. Riot disclosed the...

Read more
Read Google Backstops TeraWulf Debt for $19B Anthropic Campus in Kentucky
TeraWulf has secured Google as a credit backstop for the debt financing behind its Justified Data Campus in Hawesville, Kentucky ([TeraWulf press release](https://investors.terawulf.com/news-events...

Google Backstops TeraWulf Debt for $19B Anthropic Campus in Kentucky

November 05, 2026 Terawulf

TeraWulf has secured Google as a credit backstop for the debt financing behind its Justified Data Campus in Hawesville, Kentucky (TeraWulf press release). The campus carries a 20-year lease with Anthropic worth about $19 billion (Reuters). Baxtel reported in July that the company was seeking...

Read more
Read Anthropic Files For IPO, Disclosing $417B In Compute Commitments
Anthropic filed a registration statement for a Nasdaq initial public offering that discloses about $417 billion in future payments to compute providers. The [Form S-1](https://www.sec.gov/Archives/...

Anthropic Files For IPO, Disclosing $417B In Compute Commitments

October 27, 2026 Anthropic

Anthropic filed a registration statement for a Nasdaq initial public offering that discloses about $417 billion in future payments to compute providers. The Form S-1, filed with the U.S. Securities and Exchange Commission on Oct. 26, covers data centers, the computing equipment inside them and...

Read more
Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read Crusoe Signs 106MW Paraguay AI Cloud Partnership With Araico
[Crusoe](https://baxtel.com/data-centers/crusoe) signed a [strategic partnership](https://markets.businessinsider.com/news/stocks/crusoe-partners-with-araico-to-deploy-ai-cloud-infrastructure-in-pa...

Crusoe Signs 106MW Paraguay AI Cloud Partnership With Araico

October 23, 2026 Crusoe

Crusoe signed a strategic partnership with Araico, a Paraguayan energy and infrastructure developer, to build AI compute infrastructure powered by the Itaipú Hydroelectric Dam. The first deployment is planned for mid-2027, with a path to 106 MW of IT capacity. Under the partnership, Araico leads...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.