0.00 miles
|
CENTRA: 180 East Broad (CMH01)
|
|
|
0.30 miles
|
Crown Castle 101 E Town
|
Crown Castle acquired Lightower in 2017
|
|
0.31 miles
|
WOW! 226 N 5th
|
WOW!'s Columbus datacenter was acquired in 2013 from Bluemile assets. The site offers 26,00sqft and can expand to 52,00 sqft.
|
|
0.31 miles
|
Lumen: 226 North Fifth
|
|
|
0.31 miles
|
Racksquared 325 E Spring St
|
|
|
0.34 miles
|
Cogent: 240 North 5th
|
|
|
0.35 miles
|
CityNet Columbus
|
|
|
0.36 miles
|
Lumen: 266 North 5th
|
|
|
0.39 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
0.81 miles
|
Lumen: 580 North 4th
|
|
|
1.31 miles
|
MicroLink: Mansfield Campus
|
MicroLink is planning to build a data center in Columbus, Ohio.
|
|
6.17 miles
|
Racksquared 2560 Value Way
|
|
|
6.24 miles
|
Kyndryl: Columbus
|
|
|
7.67 miles
|
Center MaxInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
7.67 miles
|
Valley PrimeInterested in this information?Contact us
|
In March 2021, Columbus City Council approved $54.3 million in tax incentives to develop a data center on the former Hartman Farm site.
|
|
7.69 miles
|
TwoInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
7.74 miles
|
ValleyInterested in this information?Contact us
|
The complex will comprise seven buildings for data center operations and an additional structure for security and utilities.
|
|
7.80 miles
|
Center BetaInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
7.81 miles
|
CeraNet Columbus
|
|
|
7.83 miles
|
Tower TwoInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
7.88 miles
|
PrimeInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
7.89 miles
|
West PlazaInterested in this information?Contact us
|
This data center is part of Google's Lockbourne Campus in Ohio.
|
|
7.89 miles
|
Expedient Upper Arlington
|
|
|
7.99 miles
|
CampusInterested in this information?Contact us
|
Amazon is constructing its third data center campus in Hilliard at the intersection of Scioto Darby Road and the Interstate 270 overpass.
|
|
8.05 miles
|
East ParkInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
8.08 miles
|
Center TwoInterested in this information?Contact us
|
This data center is a part of Google's Lockbourne Campus in Ohio.
|
|
8.25 miles
|
Compass Groveport AEP II
|
American Electric Power invested approximately $125 million into the data center on Hamilton Road
|
|
8.82 miles
|
eNET Columbus
|
|
|
9.17 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
|
|
9.31 miles
|
Connect Data Centers: Hilliard, OH
|
US involvement from Oppidan's Hilliard data center spans 89,954 sqft. Oppidan lists Connect Data Centers as a subsidiary.
|
|
9.64 miles
|
DataCanopy: Columbus
|
|
|
9.84 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
9.89 miles
|
PrimeInterested in this information?Contact us
|
|
|
9.90 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
9.95 miles
|
Ridge PrimeInterested in this information?Contact us
|
|
|
10.00 miles
|
MaxInterested in this information?Contact us
|
|
|
10.32 miles
|
Karis: Galloway, Ohio
|
Karis Critical's proposed data center project on 127 acres in Prairie Township, Ohio, remains strictly in a "land-banked" planning phase, with no formal development or construction application submitted to local authorities.
|
|
10.55 miles
|
Cologix COL3
|
|
|
10.60 miles
|
Cologix Columbus COL1, COL2
|
COL1 (32,000sqft) and COL2 (20,000sqft) represent 2 phases of buildout in the same building.
Cologix entered the Columbus market in February of 2014 through an acquisition of DataCenter.BZ
|
|
10.73 miles
|
Cologix Columbus COL4
|
Cologix is building COL4, a 256,000 square foot data center on 9 acres along Alta View and Worthington Woods boulevards in Ohio. This facility will offer 27 MW of capacity.
|
|
11.15 miles
|
Point PrimeInterested in this information?Contact us
|
Amazon's second data center campus in Hilliard, Ohio, is situated on a 104-acre site between Cosgray and Leppert roads.
|
|
11.20 miles
|
Station MaxInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
11.24 miles
|
HubInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
11.29 miles
|
PrimeInterested in this information?Contact us
|
This data center is a part of amazon's Cosgray Road Campus in Hilliard, Ohio.
|
|
11.42 miles
|
WeConnect Westerville
|
|
|
11.62 miles
|
DartPoints: Dublin, OH
|
The facility was previously operated by Metro Data Center LLC before being acquired by Dartpoints in October 2020.
|
|
11.84 miles
|
Expedient Dublin (CMH2)
|
Offering 29,000 square foot of total floor space, Expedient’s Dublin data center is powered by redundant electric utility power feeds and 4 auto-cutover diesel generators
|
|
11.96 miles
|
CentralInterested in this information?Contact us
|
The Amazon.com subsidiary bought 234 acres at 9905 State Route 104 in Pickaway County, which is about 9 miles away from Rickenbacker International Airport.
|
|
13.07 miles
|
Resilience CMH II
|
Overwatch Capital and Japanese energy leader Idemitsu have launched a strategic partnership to develop 1 GW of data center capacity across the United States.
|
|
13.26 miles
|
Expedient: Lewis Center (CMH3)
|
Expedient data center Located at 281 E. Powell Road in Lewis Center township with The 102,000 sq ft (9,475 sqm) facility offers 3MW of initial power capacity that will be increased to 7.5 MW in the future.
|
|
13.41 miles
|
Campus PrimeInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
13.54 miles
|
Core ParkInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
13.60 miles
|
RidgeInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
13.61 miles
|
Discover Financial Services New Albany
|
|
|
13.74 miles
|
Campus AlphaInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
13.77 miles
|
Edged Energy: Columbus CMH01
|
Edged Energy data center spans 206,000 sq ft on a 15-acre parcel at 6385 New Albany Road East.
|
|
13.85 miles
|
Edge PointInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
13.87 miles
|
Compass New Albany
|
|
|
13.89 miles
|
TJX Corporate Techno
|
|
|
13.95 miles
|
ProInterested in this information?Contact us
|
This facility is part of Google's New Albany campus in Ohio.
|
|
14.01 miles
|
PrimeInterested in this information?Contact us
|
The campus is located on a 447-acre site on the west side of Beech Road, south of the state Route 161 interchange.
|
|
14.02 miles
|
Compugen New Albany
|
|
|
14.09 miles
|
QTS: New Albany 2 DC2
|
QTS New Albany 2 is a two-building data center campus in New Albany, Ohio. New Albany 2 DC2 is located at 675 Beech Rd SW, Etna, OH.
|
|
14.20 miles
|
Stack: NAL01B
|
STACK INFRASTRUCTURE is expanding it's NAL01 campus, located at Souder Road, New Albany, OH.
|
|
14.20 miles
|
QTS: Babbitt Rd, New Albany
|
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
|
14.21 miles
|
QTS: New Albany 2 DC1
|
New Albany 2 DC1 is the first of two buildings on the QTS New Albany 2 campus, at 785 Beech Rd SW, Pataskala (Etna Township), Ohio.
|
|
14.23 miles
|
Aligned: Pataskala
|
Aligned Data Centers, is targeting Pataskala for its second development in the Buckeye State.
|
|
14.23 miles
|
Centersquare: Columbus CMH1
|
DCI Technology Holdings owns the building and is CenturyLink's landlord.
|
|
14.26 miles
|
Metro StationInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
14.29 miles
|
STACK New Albany NAL01
|
STACK acquired the facility in October 2019 from Nationwide Insurance. Nationwide initially built the facility in 2008 for a cost of $96 million.
|
|
14.31 miles
|
HubInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6645 Crosby Ct facility would be the fourth building of the campus with an area of 152,945 sqft.
|
|
14.31 miles
|
Hub TwoInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
14.34 miles
|
Hub PrimeInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6655 Crosby Ct facility is the fourth building of the campus with an area of 152,945 sqft.
|
|
14.36 miles
|
Hub PrimeInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
14.36 miles
|
QTS: New Albany 1 DC2
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The second building, New Albany 1 DC2, of the campus is located at 1275 Beech Rd SW, New Albany, OH.
|
|
14.40 miles
|
Campus ProInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6665 Crosby Ct facility is the third building of the campus with an area of 152945 sqft.
|
|
14.40 miles
|
Core ParkInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
14.42 miles
|
QTS: New Albany 1 DC1
|
QTS New Albany 1 is a two-building data center campus in New Albany, Ohio. The first building of the campus is located at 1225 Beech Rd SW, New Albany, OH.
|
|
14.43 miles
|
West RidgeInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
14.44 miles
|
Ridge ProInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio. Amazon 6675 Crosby Ct facility is the second building of the campus with an area of 152945 sqft.
|
|
14.50 miles
|
PrimeInterested in this information?Contact us
|
Amazon is building a five-building data center campus in New Albany, Ohio.
|
|
14.58 miles
|
Point ProInterested in this information?Contact us
|
This data center is a part of Meta's New Albany Campus in Ohio.
|
|
14.62 miles
|
Center OneInterested in this information?Contact us
|
This data center is a part of Meta's New Albany Campus in Ohio.
|
|
14.85 miles
|
Cloud ParkInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
14.87 miles
|
PrimeInterested in this information?Contact us
|
Microsoft acquired 289 acres of land in Pataskala for $30.7 million.
|
|
14.87 miles
|
ProInterested in this information?Contact us
|
This data center is a part of Meta's New Albany Campus in Ohio.
|
|
14.88 miles
|
Point PrimeInterested in this information?Contact us
|
This data center is a part of Meta's New Albany Campus in Ohio.
|
|
14.91 miles
|
WestInterested in this information?Contact us
|
Meta operates a data center campus in New Albany, Ohio, located at 1 Community Circle. The New Albany site consists of five data centers, spanning a total of 2.5 million square feet.
|
|
15.13 miles
|
Central ValleyInterested in this information?Contact us
|
The Prometheus data center campus in New Albany, Ohio, serves as a primary hub for Meta's AI training infrastructure.
|
|
15.16 miles
|
DBT Data: 2214 Harrison Rd
|
DBT Data acquired 44 acres of land in March 2022 with the intention of developing a data center project on the site.
|
|
15.16 miles
|
ValleyInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
15.22 miles
|
Plaza UltraInterested in this information?Contact us
|
This facility is part of Meta's Prometheus Campus in New Albany, Ohio.
|
|
15.24 miles
|
Edge TowerInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
15.27 miles
|
Cloud PlazaInterested in this information?Contact us
|
|
|
15.30 miles
|
Valley AlphaInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
15.32 miles
|
Core ParkInterested in this information?Contact us
|
Microsoft expanded its Ohio footprint in 2024, purchasing an additional 43 acres in Pataskala for $11.44 million.
|
|
15.37 miles
|
Campus PrimeInterested in this information?Contact us
|
Amazon's $200 million data center campus is situated on 111 acres at the southwest corner of Warner Road and Industrial Parkway.
|
|
15.38 miles
|
EdgeConneX: Ashville, Ohio
|
The proposed EdgeConneX data center project in Pickaway County, Ohio, involves the development of 680 acres of farmland in the village of Ashville.
|
|
15.72 miles
|
Cologix: COL5
|
Cologix is constructing a 60,000-square-foot, AI-ready facility, COL5, in Columbus, Ohio.
|
|
15.73 miles
|
PointInterested in this information?Contact us
|
|
|
15.75 miles
|
Cologix: COL6
|
This planned facility is part of Cologix COL5 campus in Columbus.
|
|
15.79 miles
|
Ridge PlusInterested in this information?Contact us
|
|
|
15.86 miles
|
Park AlphaInterested in this information?Contact us
|
|
|
15.91 miles
|
Hub AlphaInterested in this information?Contact us
|
|
|
15.92 miles
|
North CampusInterested in this information?Contact us
|
Microsoft purchased 183 acres of land on Beech Road in New Albany in 2023.
|
|
15.98 miles
|
Park MaxInterested in this information?Contact us
|
|
|
16.08 miles
|
Point PrimeInterested in this information?Contact us
|
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
|
16.10 miles
|
EdgeConneX: Ashville 2
|
Local officials in Ashville, Ohio, blocked the expansion of a proposed EdgeConneX data center in February 2026. Although the company owns an initial 200-acre plot, their request to annex an additional 490 acres was denied.
|
|
16.14 miles
|
Vantage: OH13
|
This facility is a part of Vantage's New Albany data center campus in Ohio.
|
|
16.16 miles
|
Park TwoInterested in this information?Contact us
|
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
|
16.18 miles
|
South PlazaInterested in this information?Contact us
|
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
|
16.19 miles
|
Lincoln Rackhouse: Silicon Heartland Innovation Park
|
|
|
16.22 miles
|
Vantage: OH12
|
This facility is a part of Vantage's New Albany data center campus in Ohio.
|
|
16.29 miles
|
Park PlusInterested in this information?Contact us
|
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
|
16.31 miles
|
Vantage: OH11
|
Vantage has started work on its OH1 data center campus at 3475 Horizon Ct., which is inside the Silicon Heartland Innovation Park.
|
|
16.33 miles
|
Tower PlusInterested in this information?Contact us
|
This facility is part of Amazon's 3180 Beech Road Campus in New Albany.
|
|
16.45 miles
|
Station ProInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
16.46 miles
|
Campus AlphaInterested in this information?Contact us
|
Google recently expanded its footprint in Ohio, acquiring nearly 85 acres of land in New Albany, outside Columbus, for $63 million.
|
|
16.49 miles
|
GlobalInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
16.54 miles
|
Metro PointInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
16.58 miles
|
Park BetaInterested in this information?Contact us
|
Amazon's Industrial Parkway Campus is situated on 98 acres at 8619 Industrial Parkway in Union County’s Jerome Township.
|
|
16.61 miles
|
North ValleyInterested in this information?Contact us
|
|
|
16.64 miles
|
RidgeInterested in this information?Contact us
|
|
|
16.68 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
16.74 miles
|
EdgeConnex: Johnstown South 2
|
Phase II of EdgeConneX's Johnstown South Campus will see the construction of a new two-story 700,000 sq ft (65,030 sqm) building.
|
|
16.77 miles
|
Prime ValleyInterested in this information?Contact us
|
|
|
16.77 miles
|
Global PointInterested in this information?Contact us
|
|
|
16.83 miles
|
EdgeConnex: Johnstown South 1
|
EdgeConneX, a US data center operator, invested $137.2 million to acquire nearly 270 acres across multiple sites in Licking County.
|
|
16.85 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
|
16.90 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
|
16.91 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
|
16.94 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon is building five data centers and related buildings totaling 1.25 million square feet on 85 of the 439 acres the company bought along Beech and Miller roads in early 2023.
|
|
17.01 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility will be part of Amazon's new data center campus along Beech and Miller roads in New Albany.
|
|
17.05 miles
|
Karis Critical: New Albany, OH
|
Data center developer Karis Critical has purchased 115 acres of land in New Albany, Ohio.
|
|
17.07 miles
|
QTS: Miller Road, New Albany
|
QTS Data Centers wants to build eight additional facilities spanning 3.2 million square feet on 240 acres on Babbitt and Miller roads. It will invest nearly $3 billion in those projects.
|
|
17.31 miles
|
DBT Data: Jug & Mink Project
|
Washington DC-based DBT-Data plans to develop a data center at the New Albany International Business Park, close to Intel's upcoming chip fab site.
|
|
17.31 miles
|
CyrusOne: New Albany COL-1
|
CyrusOne has broken ground on a $150 million data center development in New Albany, Ohio.
|
|
17.39 miles
|
CentralInterested in this information?Contact us
|
Meta’s $42 million acquisition of the Clover Valley Road parcel through its subsidiary Sidecat LLC marks a strategic expansion of the Prometheus AI Supercluster in New Albany, Ohio.
|
|
17.61 miles
|
EdgeConnex: Johnstown North Campus
|
EdgeConnex acquired a 170.29-acre parcel of land for roughly $62.2 million, or about $365,017 per acre.
|
|
18.96 miles
|
Cologix: COL8
|
|
|
19.08 miles
|
Cologix: COL7
|
Cologix has acquired approximately 154 acres of land in Johnstown, Ohio, to develop a new, AI-ready data center campus.
|
|
19.09 miles
|
Cologix: Johnstown Expansion
|
|
|
19.27 miles
|
OneInterested in this information?Contact us
|
Construction of the first 450,000 square foot (41,800 sq m) building is expected to begin in January 2028 and be completed by December 2034.
|