9.40 miles
|
GDC SDN: Banting Campus
|
Malaysia’s Global Telecommunications Group has acquired a 36-acre parcel in Kota Seri Langat, Selangor, through its data center arm Global Data Infrastructure Sdn Bhd.
|
|
12.76 miles
|
Bridge DC: Banting Campus
|
Bridge Data Centres (BDC), backed by Bain Capital, has acquired 136.1 acres in Banting’s IOI Industrial Park for RM740.68 million (~$158M).
|
|
16.58 miles
|
SIC Quantum Data Center
|
Selangor Industrial Corporation (SIC) has partnered with domestic operator Data Centre Union (DC Union) in a joint venture named SIC Quantum Data Centre Sdn Bhd (SQDC) to build a RM 2.5 billion ($604M) data center campus.
|
|
17.31 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Microsoft’s KUL03 T2 is an under-construction expansion of its Cyberjaya data center campus, forming part of the wider KUL03 T2–T5 development.
|
|
17.42 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.52 miles
|
Equinix: KL2
|
The site is strategically located less than one kilometer from Equinix's KL1 data center, which began operations in May 2024.
|
|
17.57 miles
|
Vantage: KUL2 Expansion
|
The remaining data centers planned on Vantage's KUL2 campus in Cyberjaya after KUL21.
|
|
17.62 miles
|
Pi Data Centre: Cyberjaya
|
The development will span 7.3 acres, with Phase 1 construction scheduled to begin in the third quarter of 2024. The project is expected to be completed by the fourth quarter of 2025.
|
|
17.64 miles
|
Vantage: KUL21
|
KUL21 is the first data center on Vantage's KUL2 campus in Cyberjaya.
|
|
17.70 miles
|
Vantage: KUL12
|
In 2022, Vantage launched the second data center (KUL12) on its Cyberjaya CJ1 campus in Kuala Lumpur, Malaysia.
|
|
17.71 miles
|
Equinix Kuala Lumpur KL1
|
Equinix KL1 is located within Vantage KUL1 Data Center Campus.
|
|
17.71 miles
|
EdgeConneX: Cyberjaya
|
The EdgeConneX data center campus in Cyberjaya (KUL3) will encompass nine buildings across 30 acres.
|
|
17.72 miles
|
Vantage: KUL14
|
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
|
17.74 miles
|
Vantage: KUL13
|
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
|
|
17.75 miles
|
Vantage Cyberjaya KUL11
|
Vantage's multi-story, four-data-center KUL1 campus is an 8-minute drive from the Central Business District via the Persiaran APEC and a 30-minute drive from Kuala Lumpur International Airport.
|
|
17.77 miles
|
Open DC CJ1
|
|
|
17.77 miles
|
MyTelehaus Cyberjaya CJ1 Centre
|
|
|
17.79 miles
|
Basis Bay: Cyberjaya DC2
|
Basis Bay Cyberjaya DC.2 is a pioneering "Eco-Green Premium Data Centre" designed to meet the rigorous demands of the banking, financial services, and government sectors.
|
|
17.80 miles
|
STT Kuala Lumpur 1
|
STT Kuala Lumpur 1, is specifically designed for hyperscalers and is currently in the final stages of completion to meet the growing demand for global cloud and AI infrastructure.
|
|
17.81 miles
|
Bridge: MY02 Bldg4
|
|
|
17.85 miles
|
Bridge: MY02 Bldg3
|
|
|
17.88 miles
|
Basis Bay: Cyberjaya DC1
|
Operational since 2009, Basis Bay DC.1 is a purpose-built, carrier-neutral facility designed to Tier III/Rated-3 standards (with Tier IV-ready mechanical and electrical redundancies).
|
|
17.89 miles
|
Bridge: MY02 Bldg2
|
Bridge Data Centres (BDC) is expanding its footprint in Cyberjaya, Malaysia with the MY02 hyperscale data center project, adding substantial IT capacity across three phases.
|
|
17.95 miles
|
EdgeInterested in this information?Contact us
|
AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.
|
|
18.01 miles
|
Keppel Cyberjaya Basis Bay DC
|
|
|
18.03 miles
|
Bridge Data Centres Cyberjaya MY02
|
|
|
18.09 miles
|
CSF Computer Exchange 5 (CX5)
|
Developed in three phases over three years, CX5 was completed in 2015.
|
|
18.33 miles
|
TelcoHub X1 Cyberjaya
|
|
|
18.34 miles
|
Digital Realty: KUL10
|
KUL10, formerly CSF's Computer Exchange 1 and TelcoHub 1 at 3552 Jalan Teknokrat 6, Cyberjaya, is the carrier hotel of Digital Realty's Cyberjaya campus and hosts the Malaysia Internet Exchange.
|
|
18.41 miles
|
Digital Realty: Cyberjaya Expansion
|
The planned third building of Digital Realty's Cyberjaya campus, on a 1.6-acre parcel about 200 m from KUL10, targeted for completion in mid-2028 for hybrid colocation and AI-ready deployments.
|
|
18.46 miles
|
Digital Realty: KUL11
|
Digital Realty's KUL11 is a purpose-built data center on Jalan Teknokrat 8 in Cyber 5, Cyberjaya, about 500 m from KUL10. Infinaxis developed it with CSCEC as contractor and Digital Realty acquired it in 2026 as the AI and HPC building of its Cyberjaya campus.
|
|
18.49 miles
|
Infinaxis: Cyberjaya 2
|
Infinaxis planned Cyberjaya 2 as a second building beside Cyberjaya 1 on Jalan Teknokrat 8. Infinaxis sold the first building to Digital Realty in 2026 (now KUL11) and no second-phase plan has surfaced since, so the project is in doubt.
|
|
18.66 miles
|
AIMS: Cyberjaya 2
|
DigitalBridge-owned AIMS has finalized a RM4 billion ($1.01 billion) investment to develop a new AI-ready data center in Cyberjaya, Malaysia.
|
|
18.71 miles
|
GDC SDN: Cyberjaya
|
Global Data Centre Sdn. Bhd. (GDC), a subsidiary of Global Telecommunications Sdn. Bhd., is planning to build an AI-Driven Data Centre in Cyberjaya, Malaysia.
|
|
18.71 miles
|
Edgnex: Cyberjaya
|
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
|
|
18.85 miles
|
Bridge Data Centres Cyberjaya MY01
|
|
|
18.88 miles
|
CSF Computer Exchange 2 (CX2)
|
The 300,000+ square foot CX2 data center in Kuala Lumpur, Malaysia is the flagship facility for the CSF Group, which went public in 2010 with an IPO in London.
|
|
19.04 miles
|
NTT Cyberjaya 5
|
Cyberjaya 5 Data Center is located in the Multimedia Super Corridor, just a 30-minute drive from central Kuala Lumpur, in Malaysia's premier IT hub.
|
|
19.06 miles
|
NTT Cyberjaya 4
|
In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.
|
|
19.08 miles
|
NTT Cyberjaya 3
|
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
|
|
19.10 miles
|
NTT Cyberjaya 6
|
|
|
19.11 miles
|
NTT Cyberjaya 2
|
NTT's Cyberjaya 2 (CBJ2) appears to have closed.
|
|
19.15 miles
|
NTT Cyberjaya 1
|
|
|
19.25 miles
|
Telekom Malaysia: KVDC 2
|
Telekom Malaysia has expanded its Cyberjaya Klang Valley Data Center (KVDC).
|
|
19.29 miles
|
Telekom Malaysia: KVDC 1
|
Telekom Malaysia is expanding two of its data centers. Cyberjaya Klang Valley Core Data Centre (KVDC) was opened in 2019.
|
|
19.48 miles
|
AIMS: CJ1 Block 2
|
In 2024, Malaysia’s AIMS completed a phase 2 expansion of its Cyberjaya campus and announced plans for a third phase expansion.
|
|
19.49 miles
|
AIMS: CJ1 Block 3
|
Malaysia’s AIM completed construction of Cyberjaya Block 3 in July 2025, ahead of schedule.
|
|
19.52 miles
|
AIMS Cyberjaya CJ1
|
AIMS Data Centre began constructing its Cyberjaya facility in the third quarter of 2020.
|