SoftBank: Tokyo No. 5

Latest Podcast 6-5-17 Kita-Shinagawa, Shinagawa-ku
Operational
Fully operational facility
Operated by:

SoftBank: Tokyo No. 5

Year Built: 2013
Utility Provider: TEPCO Power Grid
Ownership: Softbank Corp. leased floors inside tisi's tokyo 4th dc (gdc gotenyama), the master building. operated by softbank corp. the building.
This site is leased from TISI Inc. in the TISI: Tokyo 4th DC (GDC Gotenyama) building
░░░ Request Dataset MW
Operational Power

SoftBank's Tokyo No. 5 Data Center opened in February 2013 on leased floors of the Gotenyama SH Building in Kita-Shinagawa, Shinagawa Ward. The 20,000 m² building has two basement levels and six floors above ground, a 66 kV dual feed, and gas turbine backup for 48 hours. SoftBank offers 2 to 8 kVA per rack, and the building is designed to Tier 4 standards.

Map and Nearby Locations

6-5-17 Kita-Shinagawa, Shinagawa-ku
Softbank Corp. Sites
Nearby Facilities

SoftBank: Tokyo No. 5 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of SoftBank: Tokyo No. 5

Distance Site About
0.00 miles TISI: Tokyo 4th DC (GDC Gotenyama)
TISI's dedicated data center building in Kita-Shinagawa, Tokyo, opened in 2011 as GDC Gotenyama and now marketed as Tokyo 4th DC under the EINS WAVE brand.
0.05 miles AT&T Tokyo NRT4
0.86 miles Equinix Tokyo TY6
0.88 miles Equinix Tokyo TY8
0.90 miles Equinix Tokyo TY7
0.92 miles Equinix TY15
TY15 is located about 1km from Equinix TY6/TY7/TY8 data centers. A direct fiber connection to TY2 just 1.5km away makes this new IBX data center a premier connectivity site in Tokyo. The facility has an initial capacity of 1,200 cabinets.
0.97 miles Equinix Tokyo TY2
1.04 miles Core ValleyInterested in this information?Contact us
1.73 miles Colt KVH Tokyo
2.51 miles NEXTDC: TK1 Tokyo
NEXTDC are poised to expand their leading design, construction and operations of data facilities into Tokyo, Japan.
2.71 miles Telecom Center Building
3.06 miles Telehouse: Tokyo Shibuya
The data center in Shibuya is inside a 15-story high-rise tower and a four-story low-rise tower with a massive 15,000 m2 of dedicated floor space.
3.09 miles Digital Edge: Shibuya (SDC)
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
3.15 miles Digital Edge: Otemachi TYO2
The facility was acquired in 2021 as part of Digital Edge's US$230 million (JPY26 billion) purchase of five data center assets from Itochu Techno-Solutions (CTC).
3.23 miles Deft: Tokyo TY1
3.31 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Vantage plans another data center on 2.8 acres of land in Tokyo, Japan.
3.41 miles Equinix Tokyo TY1
3.41 miles INAP Heiwajima Ota-ku
3.43 miles ESR Group: Ariake
This will be the company's fourth data center in Japan and second in Tokyo. Construction is scheduled to begin in Q2 2026, with operations expected to start by the end of 2028.
3.44 miles SoftBank: Tokyo Nihombashi
SoftBank interconnection data center near Tokyo's Otemachi and Marunouchi business districts.
3.49 miles SoftBank: Tokyo Ariake
SoftBank data center in the Ariake Park Building in Tokyo Waterfront City, a district built for disaster resilience.
3.52 miles Equinix Tokyo TY11
3.66 miles TISI: Tokyo 1st DC
TISI data center space in Toyosu, Koto Ward, Tokyo, marketed as Tokyo 1st DC.
3.76 miles @Tokyo Chuo Center (CC1 & CC2)
4.06 miles Marunouchi
4.19 miles SKYY: Koto City
In 2020, AXA IM's data center division acquired a data center in Tokyo's Kota Ward for ¥22bn ($211m). The facility, built by SKYY Developments, spans 20,000 sq m (215,000 sq ft) and houses 2,560 data racks, making it one of Tokyo's largest facilities.
4.41 miles NTT: Tokyo TKY12
NTT Global Data Centers is developing the TKY12 hyperscale data center campus in the Inzai–Shiroi area of Chiba Prefecture outside Tokyo, Japan.
4.57 miles Equinix Tokyo TY5
4.57 miles NTT TK3
4.57 miles Equinix Tokyo TY3
4.70 miles Marunouchi: Otemachi II
4.73 miles NTT DATA Otemachi
4.73 miles Marunouchi: Otemachi I
4.76 miles KDDI Tokyo Otemachi
4.76 miles NTT Tokyo Otemachi Building
4.78 miles Colt Ōtemachi
Colt Tokyo Otemachi Data Centre is located in Tokyo’s central business district
4.82 miles Equinix Tokyo TY4
4.83 miles NTT TK1
5.07 miles NTT TK4
5.11 miles Digital Edge: Comspace I (TY02)
Located next to Otemachi – the telecommunications hub of Tokyo – TYO2 is one of the most network dense carrier neutral data centers in the downtown area with access to significant dark fiber capacity.
5.24 miles Colt Shiohama
5.26 miles Digital Edge: TY07
The facility is located less than 300m from the company’s existing TYO2 facility (formerly known as ComSpace I).
5.32 miles Digital Edge: Comspace II (TY03)
TYO3 is conveniently located in the vibrant business district of Shinjuku with easy access to major transport
links.
5.56 miles Flow Digital: Tokyo TK7
APAC data center firm Flow Digital Infrastructure has started work on a new campus in Tokyo that will comprise two buildings—TK7 and TK8.
5.60 miles Flow Digital: TK8
This facility will be part of Flow Digital's Tokyo Data Center Campus.
5.74 miles NTT TK12
5.81 miles Empyrion: Tokyo JP1
The facility will be AI-ready, span 21,000 sqm across five floors, and will be Tier III carrier-neutral with secured power.
5.83 miles INAP Koto-ku
5.86 miles Equinix Tokyo TY10
5.87 miles NTT Tokyo No 11
5.87 miles AT TOKYO Central Tokyo
AT TOKYO’s 25 megawatts (MW) data center is located at the heart of Tokyo.
5.89 miles Keppel DC: Tokyo 1
Keppel expanded its data center portfolio in July 2024 by purchasing an existing facility in Tokyo for JPY 23.4 billion (approximately $144.8 million).
5.89 miles Equinix Tokyo TY9
5.96 miles NTT Tokyo 5
The facility is a 1-hour drive from Narita International Airport, and a 2-minute walk from the nearest train station
6.12 miles Digital Edge: Tokyo TY01
The center is located in the Musashino plateau (Musashino gravel), built on an extremely Solid ground, resistant to natural and human disasters. Public-sector studies also affirm The location's disaster-resistance.
6.40 miles NTT TK2
6.50 miles NTT TK9
6.52 miles SoftBank: Tokyo 4
SoftBank Tokyo No. 4 provides a range of colocation services to businesses.
8.16 miles SoftBank: Tokyo No. 2
SoftBank data center in Toshima Ward, Tokyo, in service since 2001.
8.20 miles NTT TK6
9.49 miles NTT Yokohama 1
9.52 miles INAP Edogawa-ku
10.03 miles NTT DATA Mitaka East (TK10)
10.08 miles NTT TK8
10.17 miles NTT Mitaka West
10.27 miles TISI: Tokyo 2nd DC (Mitaka)
TISI data center space inside MC Digital Realty's Mitaka campus in western Tokyo, opened in 2015.
10.34 miles MCC Mitaka: South Block
10.35 miles MCC Mitaka: North Block
11.52 miles Digital Edge: Yokohama TY06
The TY06 (YCC North) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
11.57 miles Digital Edge: Yokohama TY04
Digital Edge's Yokohama Computer Center (YCC) is situated in Tsuzuki-ku, Yokohama, approximately 5.5 miles (9 kilometers) inland from Tokyo Bay. The campus comprises three buildings.
11.64 miles Digital Edge: Yokohama TY05
The TY05 (YCC East) facility is one of three buildings that make up Digital Edge's Yokohama Computer Center (YCC). The campus is located in Tsuzuki-ku, Yokohama, positioned 5.5 miles (9 kilometers) inland from Tokyo Bay.
11.80 miles Mitsui: Kanagawa
Mitsui & Co., a Japanese conglomerate, invested ¥18 billion (approximately $121 million) to acquire a hyperscale data center.
12.29 miles SoftBank: Kanagawa Yokohama
12.83 miles PlazaInterested in this information?Contact us
12.96 miles Canon Nishi-Tokyo
13.39 miles I-NET: Annex, Tokyo
The I-NET Annex is a high-density, carrier-neutral facility in Yokohama designed to support AI processing and hybrid cloud environments.
14.29 miles ESR Group: Higashikurume
The company acquired a site in Higashikurume, Tokyo, which previously housed three office buildings across 20,900 square meters (225,000 square feet).
15.14 miles SoftBank: Tokyo Fuchu
Seismically isolated SoftBank data center in Fuchu, western Tokyo, with about 4,000 racks across 25 server rooms.
15.17 miles DayOne: Fuchu Intelligent Park
The plots cover a total area of 10,970 square meters (118,080 square feet), and the first phase is scheduled to begin operations in late 2026.
15.23 miles Telehouse: Tokyo Fuchu
The Telehouse Fuchu data center features earthquake-resistant construction on solid ground.
16.06 miles Mapletree: Tama-shi
Mapletree Industrial Trust has acquired a 98.47 percent stake in a Tokyo mixed-use property through a JPY14.5 billion ($99.5 million) deal with Nagayama Tokutei Mokuteki Kaisha.
17.44 miles Center MaxInterested in this information?Contact us
17.58 miles Telehouse: Tokyo Tama 5
KDDI's Tama 5 data center, which opened in July 2020, spans 14 stories and can accommodate 1,500 racks.
18.29 miles I-NET: DC1 Maioka
I-NET Corp.'s flagship data center campus in Totsuka Ward, Yokohama, comprising two purpose-built buildings operated since 2009 and 2013 as the core hub of the company's nationwide managed cloud and colocation network.
18.33 miles Colt: Yoshikawa B2
Colt Data Centre Services plans to develop Yoshikawa B2 data center, which is the second building of a 9.5-acre campus in Yoshikawa.
18.37 miles ADA: TKW1 DC3
Ada Infrastructure has broken ground on the third and final data center building at its Tokyo West 1 campus in Tama, western Tokyo.
18.39 miles Colt: Yoshikawa B1
Colt Data Centre Services is developing Yoshikawa B1 data center, which is the first building of a 9.5-acre campus in Yoshikawa.
18.42 miles ADA: TKW1 DC2
In May 2024, Ada Infrastructure started construction on a second building at its Tokyo West campus in Japan.
18.46 miles ADA: TKW1 DC1
The campus will comprise three buildings, with Building 1 being a three-story facility spanning 8,700 square meters (93,650 square feet) on a 3,400-square-meter (36,600-square-foot) site.
18.48 miles I-NET: DC2 Kamiyabe
The second and larger of I-NET Corp.'s two inet primary buildings in Totsuka Ward, Yokohama, commissioned in 2013 to expand the company's flagship campus in response to growing managed cloud and colocation demand.
18.51 miles Telehouse: Tokyo Tama 2
KDDI opened its second building at Telehouse Tokyo Tama in 2013, expanding its suburban data center campus.
18.55 miles Telehouse: Tokyo Tama 1
KDDI's Tama Campus, which opened in 2008, consists of three data center buildings with a total capacity of 4,300 racks.
18.55 miles Ridge UltraInterested in this information?Contact us
18.56 miles Telehouse Tokyo Tama 3

Operating Company

Operated by:

SoftBank Corp. (TOKYO: 9434) is a leading Japanese technology and telecommunications company that stands at the forefront of the Information Revolution. As a key player within the SoftBank Group, the company leverages cutting-edge technologies including artificial intelligence, Internet of Things (IoT), and robotics to drive innovation across multiple sectors.
Going beyond traditional telecommunications, SoftBank Corp. focuses on developing transformative services and solutions that create value for society. The company's vision is encapsulated in its corporate philosophy "Information Revolution — Happiness for everyone," reflecting its commitment to using technology to enhance human wellbeing and societal progress.
Operating under the dynamic slogan "Smart & Fun!", SoftBank Corp. promotes an innovative workplace culture that emphasizes both productivity and employee satisfaction. The company embraces modern workstyles powered by IT and AI, fostering an environment where creativity and intelligence converge with enjoyment to drive sustainable growth and meaningful technological advancement.

0
Facilities
0
Markets

News See all

Read SoftBank to Roll out “AI Data Center GPU Cloud” Platform in Japan
SoftBank to Roll out “AI Data Center GPU Cloud” Platform in Japan

SoftBank to Roll out “AI Data Center GPU Cloud” Platform in Japan

May 26, 2026 Softbank Corp.

SoftBank Corp. is set to launch an “AI Data Center GPU Cloud” service in Japan starting October 2026. The offering will form part of SoftBank Corp.’s neocloud business and will be built on its Infrinia AI Cloud OS stack. A beta version is already available. The service will run on SoftBank’s AI...

Read more
Read Stack Secures Green Financing for Data Center in Tokyo
Stack Secures Green Financing for Data Center in Tokyo

Stack Secures Green Financing for Data Center in Tokyo

October 27, 2025 Tokyo

Stack Infrastructure has secured a 39.7 billion yen ($247.7m) green financing package to develop its data center campus in Japan's capital, Tokyo. The first stage of the 36MW TKY01 campus in Inzai, Greater Tokyo, is set to come online next year, offering 18MW, with the additional capacity set to...

Read more
Read Airtrunk data center development at Tokyo data center
Airtrunk data center development at Tokyo data center

Airtrunk data center development at Tokyo data center

February 22, 2023 AirTrunk Tokyo TOK2

AirTrunk has announced that it has broken ground on the second phase of its TOK2 data center located in Tokyo, Japan. This follows the groundbreaking of the first phase only three months ago. The company has outlined that the new phase is scalable to approximately 50MW of capacity and...

Read more
Read Alibaba Opens New Data Center in Tokyo
Alibaba Opens New Data Center in Tokyo

Alibaba Opens New Data Center in Tokyo

December 23, 2022 Tokyo

Alibaba has established a data center in Tokyo, Japan. The company stated in December 2022 that its Alibaba Cloud/Aliyun division had opened a third data center in Japan to "meet the transformation expectations" of clients. Unique Song, General Manager of Japan for Alibaba Cloud Intelligence,...

Read more
Read Hulic's Plan For a Data Center in Tokyo Revealed
Baxtel

Hulic's Plan For a Data Center in Tokyo Revealed

May 23, 2022 Tokyo

Japanese real estate company Hulic has plans to develop a data center in Tokyo, Japan. According to the Japanese press and Japan Property Central, the firm will be building the data center on the site of an existing office it owns. The office is located in Nihonbashi, Tokyo. Hulic will demolish...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?