Skellefteå (Västerbotten) Data Center Market

Latest Podcast
Skellefteå (Västerbotten) is a small market where EdgeConneX is building a large campus on Northvolt's former battery plant site. Spare grid capacity and cheap northern power draw developers. Local opposition and permits will set the pace. Read More

Market Facts

Skellefteå (Västerbotten) Data Center Map

Skellefteå (Västerbotten) Power Growth Over Time

+4% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Skellefteå (Västerbotten)

EdgeConneX
Site
Power
Operational
0
0.0
Construction
1
Planned
2
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
SWI Digital
Site
Power
Operational
1
7.5
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Nordlo
Site
Power
Operational
1
0.3
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Umeå University
Site
Power
Operational
1
0.25
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Skellefteå (Västerbotten)

Location About Total SqFt Power (MW)
Prime TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
Umeå University: HPC2N
HPC2N's supercomputer room in the basement of the MIT building on Umeå University's campus, Väste...
NN Request Dataset
Nordlo: Lycksele
Nordlo's data center in a rock chamber in Tannberget, west of central Lycksele, Västerbotten, bui...
NN Request Dataset
Rootcom
Former InfoQB server hall at Granbergsvägen 1 in Vilhelmina, Västerbotten, opened in 2014. The op...
TowerInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

About This Metro

Overview

Skellefteå (Västerbotten) covers Västerbotten county in northern Sweden, from Skellefteå and Umeå on the coast to Lycksele and Vilhelmina inland. A Vilhelmina server hall opened in 2014 and closed in 2018, when its operator went bankrupt. Bitcoin miners came to Robertsfors and Örträsk in 2021. Northvolt's bankruptcy in March 2025 left a powered industrial site in Skellefteå, and EdgeConneX bought about half of it in 2026.

The Market Today

EdgeConneX is turning its part of the Northvolt site at Bergsbyn into the Skellefteå campus. In September 2026 the municipality granted building permits for the first phase, due in 2028: two converted Northvolt buildings and one new data centre. Five more buildings are planned by early 2031.

Umeå University runs HPC2N, a national supercomputing centre. Nordlo runs a data centre in a rock chamber in Lycksele. SWI Digital mines bitcoin in containers at Örträsk. HIVE left its Robertsfors mine in 2026.

Advantages

  • Grid room. Svenska kraftnät (Svk) maps more than 500 MW of free withdrawal capacity in Västerbotten for 2026.
  • Cheap power. Skellefteå and the north lie in SE1, and Umeå and the south in SE2. Both zones had Sweden's lowest spot prices in 2025, and the whole county qualifies for the Norrland energy tax deduction.
  • Powered industrial land. The Northvolt site was zoned for industry in 2017, and EdgeConneX takes over its grid connections.

Challenges

  • Local opposition. Thousands of residents signed a protest petition against the EdgeConneX campus in autumn 2026. They cite noise, backup power and electricity use.
  • Permits. EdgeConneX's environmental permit consultation with the County Administrative Board (Länsstyrelsen) runs until early 2027.

Power and Policy

Skellefteå Kraft, owned by Skellefteå municipality, runs the local grid and hydropower plants on the Skellefte River. Umeå Energi serves Umeå, and Vattenfall Eldistribution serves parts of the inland.

Get Quotes

Related News See all

Read AiOnX Completes $500 Million Genesis Digital Assets Deal and Transitions Facilities to AI
AiOnX has acquired a 77 percent stake in cryptomining firm Genesis Digital Assets for $500 million, gaining access to 15 data centers across the US and Sweden with 1.3GW of power capacity. The faci...

AiOnX Completes $500 Million Genesis Digital Assets Deal and Transitions Facilities to AI

June 15, 2026 SWI Digital

AiOnX has acquired a 77 percent stake in cryptomining firm Genesis Digital Assets for $500 million, gaining access to 15 data centers across the US and Sweden with 1.3GW of power capacity. The facilities will be converted to support AI and HPC workloads, increasing AiOnX’s total data center...

Read more
Read EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County
EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

EdgeConneX Proposes twin 730,000 sq ft Data Centers in Bastrop County

June 03, 2026 EdgeConneX

US operator EdgeConneX has filed plans to construct two 730,000-square-foot (67,820 sqm) data centers in Bastrop County, Texas. Named EDCAUS11 and EDCAUS12, the projects are planned for a 180-acre site at 6682 FM 535 in Cedar Creek, which the company acquired in November 2025. The parcel is...

Read more
Read EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy
EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

EdgeConneX Plans a €3 Billion Investment in Data Centers in Italy

May 23, 2026 EdgeConneX

The government of Italy has described EdgeConneX’s €3 billion investment as being of “national strategic interest.” The EdgeConneX Campus Italia program, announced on May 14 during a council of ministers chaired by Prime Minister Giorgia Meloni, will develop three data center campuses in the...

Read more
Read EdgeConneX Begins Construction on a New Data Center in Osaka, Japan
EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

EdgeConneX Begins Construction on a New Data Center in Osaka, Japan

March 19, 2026 EdgeConneX

EdgeConneX has begun construction on a new data center outside Osaka, Japan. The company announced this week that it is developing its first 200MW, AI-ready campus in Greater Osaka in partnership with Kagoya Asset Management.The Kyotanabe campus will cover 130,000 sqm (1.4 million sq ft), with...

Read more
Read Hive Digital Technologies to Launch Buzz Cloud Platform in Paraguay
Hive Digital Technologies to Launch Buzz Cloud Platform in Paraguay

Hive Digital Technologies to Launch Buzz Cloud Platform in Paraguay

January 13, 2026 HIVE Digital Technologies Ltd

Texas-based digital infrastructure company Hive Digital Technologies is bringing its Buzz Cloud platform to Paraguay. According to Hive, through this partnership, the company will bring its AI cloud offering dubbed "Buzz Cloud" to Paraguay, hosting its hardware in a Tier III data center...

Read more
Read Hive Digital to Expand Hydropowered Yguazú Data Center
Hive Digital to Expand Hydropowered Yguazú Data Center

Hive Digital to Expand Hydropowered Yguazú Data Center

October 21, 2025 HIVE Digital Technologies Ltd

Bitcoin mining firm Hive Digital has announced plans to expand its hydroelectric-powered Yguazú data center in Paraguay by 100MW. The expansion will increase the data center's capacity to 400MW, with the facility powered solely by hydroelectric power from the Itaipu Dam on the Paraná River,...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.