The Permian Basin is West Texas's oil and gas heartland and one of ERCOT's largest bitcoin mining clusters. Cheap gas and open land now draw gigawatt-scale AI campuses that bring their own power. A congested grid, scarce water and new state reviews slow how fast they connect. Read More

Market Facts

Permian Basin Data Center Map

Permian Basin Power Growth Over Time

+195% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Permian Basin

Cipher Digital
Site
Power
Operational
2
357.0
Construction
2
Planned
0
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
4
View Provider
Hut 8 Corp
Site
Power
Operational
3
397.0
Construction
0
Planned
2
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider
Amazon AWS
Site
Power
Operational
1
18.0
Construction
6
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
7
View Provider
STN
Site
Power
Operational
0
0.0
Construction
1
Planned
0
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider

Largest Data Centers in Permian Basin

Location About Total SqFt Power (MW)
Core Scientific: Pecos, TX
Core Scientific is converting its Pecos bitcoin mining campus to AI colocation, with AMD as the a...
NN Request Dataset NN Request Dataset
Hut 8: McCamey, TX
Hut 8's King Mountain site near McCamey in Upton County is a bitcoin mining facility at the King ...
NN Request Dataset
PlusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Cipher Digital: Odessa
Cipher mining's Odessa data center (the Odessa Facility), which is its wholly owned 207 megawatts...
NN Request Dataset
Marathon Digital: Garden City TX
The Bitcoin mining data center in Garden City, Texas is located adjacent to a wind farm and uses ...
NN Request Dataset

About This Metro

Overview

The Permian Basin covers twenty counties of West Texas, from Andrews and Big Spring south to Fort Stockton and the Big Bend. Midland and Odessa anchor the market, and the oil and gas industry dominates the local economy. The region has only one small colocation facility. Its scale comes from bitcoin mines and from AI campuses that pair data halls with on-site gas generation.

History

Telephone exchanges in Midland and Odessa housed the region's first network equipment. In 2021, Big Bend Telephone opened a carrier-neutral data center at Midland's airport industrial park. It remains the market's only colocation site.

Bitcoin miners brought scale. Compute North opened a site in a Big Spring airfield hangar in 2018, and a wind-powered mining campus near Midland went live in 2019. In 2022, miners energized sites near Pecos, Pyote, Fort Stockton, McCamey, Garden City and Odessa. Core Scientific built at Pecos, Genesis Digital Assets at Pyote, and Cipher Mining beside Luminant's gas plant in Odessa.

Ownership turned over after the 2022 crypto downturn. Celsius's mining sites near Midland passed to Ionic Digital, and the King Mountain joint venture at McCamey passed to Hut 8. MARA bought the Garden City site in 2024. From 2025, operators began converting mining halls for AI tenants.

The Market Today

Bitcoin mining still carries most of the region's operating load. Ionic Digital, MARA, Hut 8, SWI Digital (formerly Genesis Digital Assets) and Canaan's joint ventures run mining sites from Andrews to Big Lake.

AI conversions lead the new demand. Cipher Digital is converting its Black Pearl site near Wink and building a second site near Andrews, both leased to Amazon Web Services. Core Scientific is preparing its Pecos campus for AMD, with first delivery planned for 2027.

Gigawatt-scale campuses with their own power plants come next. Amazon is developing GW Ranch north of Fort Stockton, where Pacifico Energy holds a permit for up to 7.65 GW of gas generation. Chevron and Joulent are developing a gas plant south of Pecos to supply a Microsoft campus. PowerBridge began building near Pecos in September 2026, and New Era Energy & Digital plans a campus beside Vistra's Odessa power plant.

Network infrastructure is thin outside Midland and Odessa. AT&T's Midland central office hosts the area's tandem switches. FiberLight is building new long-haul fiber between Midland and El Paso.

Advantages

  • Cheap gas. The Waha hub sits inside the basin, and pipeline limits keep its prices low. Waha gas traded below zero on most days in the first half of 2026.
  • Land. Ranches and oilfield surface tracts offer thousands of acres under single owners. Texas Pacific Land and LandBridge now lease land to data center developers.
  • Bring your own power. Texas lets large loads build on-site generation. A campus can run off the grid until transmission arrives.
  • Renewable hosts. Wind and solar farms near McCamey, Big Spring and Penwell host miners behind the meter. The miners absorb power the grid cannot take.
  • Local incentives. Pecos County created reinvestment zones and approved tax abatements for several data centers and power plants in 2025 and 2026.

Challenges

  • Grid congestion. Oilfield electrification already strains the Far West grid. The new 765 kV import lines are not due until 2031.
  • State reviews. In August 2026, the Electric Reliability Council of Texas (ERCOT) paused energizing new data center and crypto loads of 75 MW or more. In September 2026, the governor told the Texas Commission on Environmental Quality (TCEQ) to halt data center permits until a state audit ends.
  • Water. The basin is arid. Large campuses compete with oilfield operations for brackish groundwater.
  • Remoteness. Most sites sit far from major fiber routes and metro areas. Construction crews compete with the oil industry for workers and housing.
  • Gas exposure. Off-grid campuses depend on Waha prices and pipeline flows. New takeaway pipelines due in late 2026 aim to narrow the local discount.

Trends

  • Mining to AI. Miners with energized substations now lease them to hyperscalers and AI companies.
  • Power first. Developers secure turbines, permits and land before they name a tenant. Several gigawatt campuses had no announced tenant in late 2026.
  • Energy companies as suppliers. Chevron, Vistra and Pacifico Energy sell power to data centers. Landowners such as Texas Pacific Land and LandBridge supply land and water.
  • Hyperscalers and AI labs arrive. Amazon and Microsoft both chose the basin in 2026 for gas-powered campuses. Poolside is clearing land for its own campus south of Fort Stockton.

Power and Policy

The basin sits in ERCOT's Far West zone and is regulated by the Public Utility Commission of Texas (PUCT). Oncor serves Midland, Odessa and most of the Midland Basin. Texas-New Mexico Power (TNMP) serves the Pecos, Pyote and Fort Stockton areas, and AEP Texas serves Alpine and the Big Bend. Senate Bill 6 (2025) set rules for loads of 75 MW and up. In September 2026, the PUCT required those loads to post at least $50,000 per MW of security before ERCOT studies them. The PUCT approved the Permian Basin Reliability Plan in 2024 and chose 765 kV for its new import paths in 2025.

Get Quotes

Related News See all

Read Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia
Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The [Development of Regional Impact application](https://dca....

Microsoft Files for 422MW Three-Building Data Center Campus in Rome, Georgia

November 18, 2026 Microsoft Azure

Microsoft filed for state review on October 20 of a three-building data center campus in Rome, Georgia, with 422MW of planned capacity. The Development of Regional Impact application covers 349 acres at 0 Huffaker Road and 1,659,000 square feet of floor space. Microsoft owns the land, bought in...

Read more
Read Blackstone Digital Infrastructure Trust Buys 75% of AWS Joint Ventures for $5B
[Blackstone Digital Infrastructure Trust](https://www.sec.gov/Archives/edgar/data/2100161/000119312526461954/d115778dex991.htm) has agreed to buy a majority stake in two Amazon Web Services data ce...

Blackstone Digital Infrastructure Trust Buys 75% of AWS Joint Ventures for $5B

November 17, 2026 Amazon AWS

Blackstone Digital Infrastructure Trust has agreed to buy a majority stake in two Amazon Web Services data center joint ventures for about $5 billion. The trust takes a 75% interest in the ventures, which own 13 newly constructed powered shells, and Amazon Web Services keeps the remaining 25%....

Read more
Read AWS Breaks Ground on $7 Billion Project Rise Campus in Indiana
Amazon Web Services has begun construction on its $7 billion Project Rise data center campus in Wheatfield, Indiana ([Times of Northwest Indiana](https://nwitimes.com/news/local/collection_3ea669e7...

AWS Breaks Ground on $7 Billion Project Rise Campus in Indiana

November 16, 2026 Amazon AWS

Amazon Web Services has begun construction on its $7 billion Project Rise data center campus in Wheatfield, Indiana (Times of Northwest Indiana). Jasper County planners cleared the project in June (Rensselaer Republican). Amazon Web Services is spending a combined $33 billion on Indiana data...

Read more
Read Core Scientific to Exit Bitcoin Mining as Colocation Billing Reaches 485MW
Core Scientific plans to end Bitcoin mining by the end of 2026 and operate only as a high-density colocation provider in 2027. The Nasdaq-listed operator said in its [third-quarter 2026 results](ht...

Core Scientific to Exit Bitcoin Mining as Colocation Billing Reaches 485MW

November 16, 2026 Core Scientific

Core Scientific plans to end Bitcoin mining by the end of 2026 and operate only as a high-density colocation provider in 2027. The Nasdaq-listed operator said in its third-quarter 2026 results that it billed 485MW of colocation capacity at September 30, up from 395MW at the end of June....

Read more
Read Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois
The City of Rockford named [Microsoft](https://baxtel.com/data-centers/microsoft-azure) on Nov. 13 as the company evaluating a Monarch Energy-controlled pro![msblogs.thesourcemediaassets.com](/rail...

Microsoft Eyes 1.4GW Data Center Campus on Monarch Land in Rockford, Illinois

November 16, 2026 Microsoft Azure

The City of Rockford named Microsoft on Nov. 13 as the company evaluating a Monarch Energy-controlled property in south Rockford for a data center campus. Microsoft is conducting due diligence on the land and has not submitted a proposal, the city said in its announcement. The land sits along...

Read more
Read Core Scientific Files $1.3B Plan for 285MW Hunt County Data Center
Core Scientific has registered a $1.3 billion plan to build a data center building at its [285MW Hunt County campus](https://baxtel.com/data-center/core-scientific-hunt-county-tx) outside Dallas. T...

Core Scientific Files $1.3B Plan for 285MW Hunt County Data Center

November 16, 2026 Core Scientific

Core Scientific has registered a $1.3 billion plan to build a data center building at its 285MW Hunt County campus outside Dallas. The filing with the Texas Department of Licensing and Regulation covers a 341,326 sq ft core-and-shell building at 4852 County Road 3507 in Quinlan, about 53 miles...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.