The Las Vegas data center market is located in the state of Nevada within Americas. Las Vegas has 37 facilities with 4,185,600 sqft and 509 megawatts.
The top providers in Las Vegas are Switch (15 sites) and Google with 1 facility . The most popular facilities are DataBank Las Vegas LAS1 and EdgeConneX Las Vegas.
| Name | Company | Size | Status | Type | |
|---|---|---|---|---|---|
|
DataBank Las Vegas LAS1 | DataBank | Small | Operational | Carrier-Neutral |
|
EdgeConneX Las Vegas | EdgeConneX | Extra Small | Operational | Carrier-Neutral |
|
Lumen: Las Vegas (1 Aerojet) | Lumen Technologies | Small | Operational | Carrier |
|
Lumen: Las Vegas 2 | Lumen Technologies | Extra Small | Operational | Carrier |
|
Lumen: Las Vegas 3 | Lumen Technologies | Extra Small | Operational | Carrier |
|
Flexential Las Vegas (Lone Mountain) | Flexential | Small | Operational | Carrier-Neutral |
|
Flexential Carson I & II | Flexential | Small | Operational | Carrier-Neutral |
|
Verizon: 2240 Corporate Cir | Verizon Enterprise | Extra Small | Operational | Carrier |
|
Switch Las Vegas CORE Campus | Switch | Operational | Carrier-Neutral | |
|
Switch Las Vegas 8 | Switch | Large | Operational | Carrier-Neutral |
|
Switch Las Vegas 7 | Switch | Medium | Operational | Carrier-Neutral |
|
Switch Las Vegas 9 | Switch | Large | Operational | Carrier-Neutral |
|
Switch Las Vegas 10 | Switch | Large | Operational | Carrier-Neutral |
|
Switch Las Vegas 11 | Switch | Large | Operational | Carrier-Neutral |
|
Switch Las Vegas 12 | Switch | Medium | Operational | Carrier-Neutral |
|
Switch Las Vegas 2 | Switch | Extra Small | Operational | Carrier-Neutral |
|
Switch Las Vegas 5 | Switch | Extra Small | Operational | Carrier-Neutral |
|
Switch Edge 1 | Switch | Extra Small | Operational | Carrier-Neutral |
|
Switch: Las Vegas 15 | Switch | Large | Operational | Carrier-Neutral |
|
Switch: EVO AI Factory 1 | Switch | Large | Construction | Carrier-Neutral |
|
Switch: EVO AI Factory 2 | Switch | Large | Construction | Carrier-Neutral |
|
Switch: Apex Industrial Park | Switch | Extra Large | Land Bank, Planned, Prospective Expansion | Carrier-Neutral |
|
Switch: Las Vegas 14 | Switch | Large | Operational | Carrier-Neutral |
|
Carrier-Neutral Data CenterInterested in this information?Contact us | Switch | Large | Operational | Carrier-Neutral |
|
Fiberhub - Las Vegas | Fiberhub | Extra Small | Operational | Carrier-Neutral |
|
|
ISP.Net DC1 | ISP.Net | Extra Small | Operational | Carrier |
|
|
ISP.Net DC2 | ISP.Net | Extra Small | Operational | Carrier |
|
|
ColoXchange Las Vegas | ColoXchange | Small | Operational | Carrier-Neutral |
|
Contegix Las Vegas | Contegix | Operational | Carrier-Neutral | |
|
Cloud ParkInterested in this information?Contact us | Extra Large | Operational, Planned | Hyperscale | |
|
Novva Las Vegas | Novva Data Centers | Large | Operational, Planned | Carrier-Neutral |
|
Novva: Apex Industrial Park | Novva Data Centers | Land Bank | Carrier-Neutral | |
|
CoreWeave: US West LAS1 | CoreWeave | Operational | Neocloud | |
|
Edged Energy: Las Vegas LAS01 | Edged Energy | Extra Large | Planned | Carrier-Neutral |
|
Jet.AI: Moapa, NV | Jet.AI | Large | Planned | Carrier-Neutral |
|
|
Townsite Solar 2: Boulder City | Townsite Solar 2 LLC | Withdrawn | Energy | |
|
|
Townsite DC: Boulder City | Townsite Solar 2 LLC | Large | Planned | Energy |
| Location | Building SqFt | Power (MW) | Estimated Launch |
|---|---|---|---|
| Switch: EVO AI Factory 2 | 228,000 SqFt | 60 Megawatts | |
| Switch: EVO AI Factory 1 | 199,000 SqFt | 50 Megawatts | Q3 2026 |
| Event | Type | Region | Date | Starts in | Details |
|---|---|---|---|---|---|
|
Las Vegas
|
Nov 16 – 19 | 35 days | |||
|
Mon, Nov 16 – 19
Las Vegas
Solar Energy Industries Association
|
|||||
| Data Center +1 |
Las Vegas
Las Vegas, NV
|
Sep 20 – 22, 2027 | 343 days | ||
|
Data Center
Power
Mon, Sep 20 – 22, 2027
Las Vegas, NV
Data Centre Dynamics Ltd
|
|||||
No events match the selected types.