Iron Mountain: Miamisburg (OHS-1)

Latest Podcast 3366 S Tech Blvd
Operational
Fully operational facility
Operated by:

Iron Mountain: Miamisburg (OHS-1)

Year Built: 2012
Utility Provider: AES Ohio
Ownership: Iron Mountain owns the building.
Lot Size: 4 acres

Sites leasing space from Iron Mountain:

░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Iron Mountain Data Centers runs OHS-1 in a former Leather Gallery furniture store on South Tech Boulevard, between Dayton and Cincinnati. IO converted the building into a modular data center in 2012. LexisNexis moved in that November as its first tenant. Iron Mountain took over the site in January 2018, when it bought IO's US data center business for $1.34 billion.

The facility uses modular data halls rated up to 20 kW per rack. Power and generators run 2N, and chillers and air handlers run N+1. The first phase of data center 1 has an Uptime Tier III-certified design, and the site sits outside the 100- and 500-year floodplains.

Site History

  • January 2018: Iron Mountain closes its purchase of IO's US data centers.
  • November 2012: LexisNexis moves into the data center.
  • July 2012: IO begins converting the former Leather Gallery store.

Project Profile

  • Carriers: AT&T, Cogent, Lumen, Spectrum, Verizon and Zayo, with Megaport on site.
  • Security: three-factor access (retina scan, key card and PIN), mantraps, on-site guards and CCTV around the clock.

Map and Nearby Locations

3366 S Tech Blvd
Iron Mountain Sites
Nearby Facilities

Iron Mountain: Miamisburg (OHS-1) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Iron Mountain: Miamisburg (OHS-1)

Distance Site About
0.01 miles LexisNexis Springboro
LexisNexis opened its Springboro data center in 2012 as the first tenant of IO's modular facility south of Dayton, Ohio, now Iron Mountain OHS-1.
1.80 miles Encore Technologies MSB1
Encore Technologies' MSB1 data center on Springboro Pike in Miamisburg, Ohio, a former LexisNexis data center that Encore bought in 2022.
6.47 miles Verizon: Waynesville, OH
Verizon's former MCI long-haul network and colocation node on Lytle-Ferry Road near Waynesville, Ohio.
10.75 miles Lumen Dayton
Lumen owns a small network and colocation building on South Broadway in Dayton, Ohio, built by Williams Communications.
10.93 miles Brightspeed: Lebanon
Brightspeed central office at 20 North Mechanic Street in downtown Lebanon, Ohio. The 32,520 sq ft building dates to 1973 and was offered for a sale-leaseback in 2025.
10.95 miles Reynolds and Reynolds: Kettering
Reynolds and Reynolds runs a data center at its headquarters campus in Kettering, Ohio, where it hosts dealership data for its automotive software customers.
11.84 miles Lumen Dayton 3
Lumen runs a small colocation and network suite in the Fifth Third Center tower in downtown Dayton, Ohio, a site that began with tw telecom.
11.91 miles AT&T: Dayton Main
AT&T's main telephone exchange for Dayton, Ohio, in the 1930 Ohio Bell Telephone Building on West Second Street downtown.
11.91 miles DataYard: Dayton
DataYard's colocation data center in the 130 Building on West Second Street in downtown Dayton, Ohio, built in 2012.
11.94 miles AT&T: Dayton 300 W 1st St
AT&T's four-story telephone equipment building on West First Street in downtown Dayton, Ohio, on the same block as its main exchange.
13.99 miles CyrusOne Cincinnati-Lebanon
CyrusOne's CIN5 data center sits on a 123-acre campus at 401 Kingsview Drive in Lebanon, Ohio, about 30 minutes northeast of downtown Cincinnati. CyrusOne markets the campus as CIN5 and CIN7.
14.10 miles CyrusOne Lebanon CIN7
CIN7 is CyrusOne's second data center on its 123-acre Lebanon, Ohio campus at 401 Kingsview Drive, alongside CIN5. CyrusOne markets the campus as build-to-suit capacity.
15.02 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.13 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.18 miles Prologis: Cincinnati, Ohio
Prologis is building Project Mila, a four-building data center campus of about 899,000 sq ft on 144 acres off Arnold Brown Industrial Drive in Trenton, Ohio, for Amazon Web Services. The campus has its own substation, fed from the adjacent Woodsdale 345 kV substation.
15.21 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.24 miles Hyperscale Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.72 miles U.S. Air Force: IT Complex (Bldg 802)
Wright-Patterson Air Force Base's Information Technology Complex near Dayton, Ohio, a 2012 building with a below-grade data center for Air Force research computing.
15.94 miles U.S. Air Force: AFRL DSRC (Bldg 676)
The Air Force Research Laboratory's DoD Supercomputing Resource Center at Wright-Patterson Air Force Base near Dayton, Ohio.
16.26 miles Prime CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.50 miles Landmark Dividend: Dayton, OH
Landmark Dividend's vacant single-story data center in north Dayton, Ohio, available for lease or sale since Radian moved out in 2025.

Operating Company

Operated by:

Iron Mountain Data Centers is the data center business of Iron Mountain Incorporated and operates sites in the United States and Europe, with an India platform built through its partnership with Web Werks. In January 2018 it closed the acquisition of IO Data Centers, adding facilities in Phoenix and Scottsdale, Arizona, Edison, New Jersey, and Columbus, Ohio. In May 2018 it acquired EvoSwitch Netherlands, expanding into the Amsterdam market, and in 2019 it added capacity in Amsterdam and London. In India, Iron Mountain formed a joint venture with Web Werks in 2021 and in April 2025 it announced full ownership and a rebrand to Iron Mountain Data Centers India. Iron Mountain Incorporated was founded in 1951.

Iron Mountain Data Centers History:

  • In April 2025, acquired the remaining stake in Web Werks and rebranded the India business to Iron Mountain Data Centers.
  • 2021: Formed a joint venture with Web Werks to develop and operate data centers in India.
  • May 2018: Acquired EvoSwitch Netherlands, expanding into the Amsterdam market.
  • January 2018: Closed the acquisition of IO Data Centers’ U.S. operations.
  • 1951: Iron Mountain Incorporated was founded.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Iron Mountain Completes Structural Build of Chennai Data Center
Iron Mountain Completes Structural Build of Chennai Data Center

Iron Mountain Completes Structural Build of Chennai Data Center

April 13, 2026 Iron Mountain

Iron Mountain has topped out a new data center in Chennai, India.“We are thrilled to celebrate a recent major milestone in our global expansion: the official topping-out ceremony of our Chennai CHN-1 data center in Ambattur!” the company said on LinkedIn this week. “As the structural framework...

Read more
Read Iron Mountain Plans a Seven-building Data Center Campus Outside Austin, Texas
Iron Mountain Plans a Seven-building Data Center Campus Outside Austin, Texas

Iron Mountain Plans a Seven-building Data Center Campus Outside Austin, Texas

March 18, 2026 Iron Mountain

Iron Mountain is targeting a new data center development outside Austin, Texas. First reported by BizJournal, the company is targeting a campus outside the city of Hutto in Williamson County.The Hutto City Council last week reviewed a presentation from Iron Mountain on its Taylor Meadows data...

Read more
Read Iron Mountain to convert records management facility in Miami to a data center
Iron Mountain to convert records management facility in Miami to a data center

Iron Mountain to convert records management facility in Miami to a data center

November 06, 2023 Iron Mountain

Iron Mountain is to convert one of its former records management facilities in Miami, Florida, into a data center that will offer 16MW. Iron Mountain CEO William L. Meaney said during the company's Q3 2023 earnings call last week, “Miami is a key market where a number of our customers are...

Read more
Read Web Werks & Iron Mountain acquire 4 acres in Chennai for DC construction
Web Werks & Iron Mountain acquire 4 acres in Chennai for DC construction

Web Werks & Iron Mountain acquire 4 acres in Chennai for DC construction

October 17, 2023 Web Werks

Web Werks and Iron Mountain recently purchased a four-acre parcel of land in the Ambattur area of Chennai, India for the construction of two data center campuses. These parcel will support two buildings called CHE-1 and CHE-2 which will be built to Tier III standards and will support a total of...

Read more
Read Iron Mountain signs 24/7 PPA for hydropower in US
Iron Mountain signs 24/7 PPA for hydropower in US

Iron Mountain signs 24/7 PPA for hydropower in US

July 04, 2023 Iron Mountain

Iron Mountain has signed a 24/7 PPA agreement with Rye Development, a US hydropower developer, for 150 ME of power over the next ten years from a number of the developer's low-impact hydroelectric projects. Rye Development seeks to integrate power generation capabilities into existing dams...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.