Green Colo: Brunel Way (F2)

Latest Podcast 14 Brunel Way
Operational
Fully operational facility
Operated by:

Green Colo: Brunel Way (F2)

Year Built: 2018
PUE: 1.18
Utility Provider: SSEN
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

The Brunel Way facility is the largest site in the Green Colo estate and the one it calls Fareham 2. ServerHouse bought the former EE and Orange regional switch building in 2017 and opened it as a data centre in May 2018, with about 400 racks in its first phase. It supports racks of 3 to 20 kW and is fed by 8 MVA of diverse utility power.

The building is carrier neutral, with BT, Virgin Media and Vodafone fibre on site and a 20 m telecom tower. It links to the operator's Cams Hall sites and to Telehouse North in London over diverse 10G fibre.

Site History

  • In May 2018, the data centre opened with its first phase of about 400 racks.
  • In 2017, ServerHouse bought the former EE and Orange switch site at 14 Brunel Way.

Map and Nearby Locations

14 Brunel Way ( Segensworth East )
Green Colo Ltd Sites
Nearby Facilities

Green Colo: Brunel Way (F2) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Green Colo: Brunel Way (F2)

Distance Site About
0.08 miles Pulsant: Fareham
Pulsant Fareham (SE-5) is a colocation data centre at 18 Brunel Way, Segensworth, which Pulsant bought from SCC in 2025 and plans to expand by about 1 MW in 2027.
3.71 miles Green Co: Delme Place
The Green Co Ltd facility at Delme Place, Fareham, is a specialized data center focused on low-carbon colocation and sustainable hosting.
3.71 miles Green Colo: Delme Place (P1)
Delme Place (P1) was ServerHouse's first data centre, a Tier II colocation room on the first floor of 2 Delme Place on the Cams Hall Estate near Portchester, Fareham.
3.71 miles Green Colo: Walled Garden (F1)
Green Colo's Walled Garden (ServerHouse F1) is a Tier III colocation and satellite ground station site inside the brick-walled garden of the Cams Hall Estate near Portchester, Fareham.
3.73 miles Green Colo: West Barn (P2)
Green Colo's West Barn (ServerHouse P2) is a small Tier II colocation room in a converted farm building on the Cams Hall Estate near Portchester, Fareham.
4.64 miles iomart DC9 Gosport
iomart DC9 is a small Tier 2 hosting data centre at Frater Gate Business Park, Gosport, that joined iomart in 2013 with its purchase of Redstation.
4.98 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
7.15 miles Altaire Core NOC
Altaire Core NOC was a small hosting room operated by Altaire Limited inside a Verizon point of presence at Quay Point, North Harbour, Portsmouth.
7.34 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
8.07 miles Elite Limited Internet House
Internet House on Kingston Crescent, Portsmouth, housed the hosting room of Elite Limited, a Portsmouth internet provider founded in 1999.
9.49 miles Government Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
11.27 miles Aptum Portsmouth
Aptum Portsmouth is a 58,000 square foot colocation and hosting data centre in Building 5000 at Langstone Technology Park, Havant, opened by Peer 1 Hosting in 2011 inside the former IBM plant.
11.28 miles Smallworld: Hampshire
Smallworld IT sells rack colocation in Hampshire from space inside Aptum's Portsmouth data centre at Langstone Technology Park, Havant.
12.84 miles IBM: Hursley
IBM Hursley is the data centre on IBM's Hursley Park research and development campus near Winchester, which became IBM's UK headquarters in 2024.

Operating Company

Operated by:

Green Colo Ltd was incorporated in March 2012 and is run by the Coates family, who founded ServerHouse Ltd in 1997. The business now trades as Green Colo and describes ServerHouse as the name it was established under. It offers colocation, private cloud, connectivity, antenna colocation and disaster recovery from its Fareham area sites, and links them by diverse fibre to Telehouse North in London.

The estate covers West Barn and the Walled Garden on the Cams Hall Estate and a purpose-built Tier III facility at 14 Brunel Way, Segensworth, a former mobile switch site that opened as a data centre in 2018. The Walled Garden site also hosts satellite ground station antennas.

Green Colo History

  • In May 2018, the 14 Brunel Way data centre opened with about 400 racks of capacity.
  • In March 2012, Green Colo Ltd was incorporated in Fareham.
  • In 1997, the Coates family founded ServerHouse Ltd and began building data centres in Hampshire.
0
Facilities
0
Markets
0MW
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.