Datum: MCR2

Latest Podcast Wavell Road
Operational
Fully operational facility
Operated by:

Datum: MCR2

Year Built: 2025
PUE: 1.25
Utility Provider: Electricity North West
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

MCR2 is the newer of two data centres on Datum's Wythenshawe site. It stands next to MCR1, inside the same security perimeter. It replaced Simon House, a vacant two-storey office that once held a job centre, and opened after almost two years of demolition and construction.

The building holds up to 1,200 racks across several data halls, at 3.5 kW per rack as standard and up to 30 kW per rack on dual circuits with 2N power. Cooling uses chilled water with free cooling, designed for outdoor temperatures above 40°C, and the plant is ready to export waste heat to a future local heating network. Standby generators run on HVO fuel, and solar panels cover part of the roof. A police-linked alarm receiving centre on site serves both buildings, and IX Manchester has a core point of presence there. Keysource designed and built the facility.

Site History

  • 2025-06-26: Councillor Emma Taylor cut the ribbon to open MCR2.
  • 2025-03: Switchgear installation finished.
  • 2024-07: The steel frame went up. The roof was complete by September 2024.
  • 2024-04: Foundation work began on the cleared plot.
  • 2023-10-03: Manchester City Council approved the plan to replace Simon House with a two-storey data centre.
  • 2023-08: Demolition of Simon House began.
  • 2023-02: Datum announced MCR2 as an expansion of the Teledata site it bought in September 2022.

Map and Nearby Locations

Wavell Road
Datum Datacentres Limited Sites
Nearby Facilities

Datum: MCR2 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Datum: MCR2

Distance Site About
0.03 miles Datum: MCR1
0.04 miles LCRDC: Manchester Core
LCRDC Manchester Core is Liverpool City Region Data Centres' colocation offer in Manchester, sold from space inside Datum's MCR1 data center at Delta House in Wythenshawe, near Manchester Airport.
5.83 miles Equinix Manchester MA4
5.84 miles ANS: MaNOC 8
5.90 miles Equinix Manchester MA1
5.91 miles Asanti: Manchester
Asanti's Manchester data centre is at Daisy House, 1 Brindley Road, Old Trafford, with about 4,000 sq ft of colocation space. Asanti bought it from Daisy Group in November 2022.
5.94 miles iomart: DC7 Manchester
In 2012, iomart Group plc acquired Melbourne Server Hosting, gaining two Manchester data centers—Turing House (DC6) and Reynolds House (DC7).
5.94 miles CapitaLand: Reynolds House
Reynolds House is a three-storey powered shell data centre at 4 Archway, Hulme, Manchester. CapitaLand Ascendas REIT has owned it since 2021, and Volta and iomart run data halls inside.
5.94 miles Volta: MAN1
Volta MAN1 is a colocation data centre on the upper floor of Reynolds House, 4 Archway, Hulme, Manchester. Lunar Digital opened it as Lunar 1 in January 2024, and Volta Data Centres has run it since October 2026.
5.95 miles Volta: MAN2
Volta MAN2 is a colocation data hall on the ground floor of Reynolds House, 4 Archway, Hulme, Manchester, with a 1.5 MVA incoming feed and N+1 generators. Lunar Digital opened it as Lunar 2 in 2024, and Volta Data Centres has run it since October 2026.
5.95 miles Equinix Manchester MA2
Equinix MA2 was a colocation data center at Reynolds House, 4 Archway, Hulme, Manchester, that came to Equinix with Telecity in 2016. Equinix closed MA2 on 30 June 2023 when its lease ended; Lunar Digital, owned by Volta since October 2026, now runs the building.
6.00 miles iomart DC6 Manchester
The iomart DC6 data center in Manchester (also known as Turing House) became part of iomart's portfolio in August 2012.
6.01 miles Energy Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.23 miles ANS: MaNOC 5, 6 & 7
The ANS MaNOC 5, 6, and 7 complex is a high-density data center campus in Trafford Park, Manchester, comprising three interconnected buildings designed for secure colocation and managed services.
6.25 miles iomart: DC13 Manchester
iomart acquired the LDeX Group in December 2018, and what was previously known as the LDeX2 Manchester site is now integrated into iomart's network as DC13.
6.29 miles Equinix Manchester MA3
6.34 miles Pulsant: Manchester NW-1
Pulsant Manchester NW-1 is a colocation data center on Ball Green in Trafford Park, built and opened by M247 in 2013 and owned by Pulsant since January 2022.
6.38 miles ANS: MaNOC 4
ANS MaNOC 4 is a high-security, carrier-neutral data center featuring approximately 20,000 sq ft of gross space and a capacity for over 300 racks.
6.40 miles Kao Data: Manchester
Kao Data is building a data center for high-performance computing and AI at Kenwood Point in Reddish, Stockport, with power due in late 2027 and opening planned for 2028.
6.56 miles Volta: MAN3
Volta MAN3 is a purpose-built colocation data centre at 545 Hyde Road, Belle Vue, Manchester, with four data halls and 2 MVA of power from a private substation. Lunar Digital opened it as Lunar 3 in 2023, and Volta Data Centres has owned it since October 2026.
6.72 miles AI End User Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
6.78 miles Deep Green: Manchester DG01
Deep Green's DG01 is a high-density AI and HPC colocation data center at the Move Urmston Leisure Centre in Trafford, Greater Manchester. Heat from its servers warms the leisure centre's two swimming pools.
6.96 miles AtlasEdge: MAN001
6.98 miles Wavenet: Manchester ServerBank
Wavenet Limited operates the ServerBank data centre at Bank House, Faulkner Street, Manchester, a carrier-neutral facility built in a former Bank of England bullion vault.
7.00 miles Future Point: Manchester
Future Point Manchester is a planned data center energy park at Carrington in Trafford, Greater Manchester, developed by Carlton Power and Eclipse Power around a private electricity network with a planned 1.4 GW grid connection.
7.07 miles LGIM: Ocean Estates Trafford Park
Ocean Estates is a 7.8-acre site on Trafford Park Road in Trafford Park, Manchester, with planning consent for a 280,000 sq ft data center, offered for sale by LGIM for the BMW (UK) pension fund.
7.19 miles Datacentreplus: Manchester
7.54 miles Lumen: Manchester
Lumen Technologies operates the facility today, following CenturyLink's 2017 acquisition of Level 3's data centers and network and its subsequent rebranding to Lumen in 2020.
8.14 miles Digital L&D: Manchester
Salford City Council approved a GBP 250m data center for Digital Land & Development at the former White's Reclamation site on Liverpool Road, Eccles, in July 2025. Work has not started.
8.53 miles Latos: Manchester
Latos has submitted a planning application to Manchester City Council for a two-building Neural Edge data center on a vacant brownfield plot in Newton Heath, East Manchester. No decision has been issued and IT capacity has not been disclosed.
8.98 miles Equinix: Manchester MA5
13.88 miles Level3 Warrington
15.85 miles Zen Internet: Rochdale Sandbrook Park
Zen Internet's data centre at its Sandbrook Park headquarters in Rochdale has two halls, about 10,000 sq ft and around 150 racks of colocation space.
18.01 miles Intercity: Bolton
The Intercity Technology data center in Bolton is a Tier 3 facility located at Hallmark House, Paragon Business Park.

Operating Company

Operated by:

Datum Datacentres Limited is a privately held UK colocation company owned by funds managed by the Real Estate & Private Markets business of UBS Asset Management. Dominic Phillips is CEO, and the company is based at Cody Technology Park in Farnborough, Hampshire. Datum operates three data centers across two sites, FRN1 in Farnborough and MCR1 and MCR2 on Wavell Road in Wythenshawe, Manchester, and is building a fourth, FRN2, in Farnborough.

The company offers colocation, connections to public cloud, network services, service management, lifecycle and engineering services. Its facilities hold certifications including ISO 27001, PCI DSS, BS5979, NSI Gold and Police-Assured Secure Facilities. It serves sectors including aerospace and defence, finance and insurance, the public sector, emergency services, education and AI.

Datum Datacentres Limited History:

  • In June 2025, Datum opened MCR2, its second Manchester data center, in Wythenshawe.
  • In September 2022, Datum acquired Teledata UK, a Manchester colocation provider, and its MCR1 data center.
  • In September 2021, funds managed by UBS Asset Management's Real Estate & Private Markets business acquired Datum.
  • Founded in 2012 in Farnborough.
0
Facilities
0
Markets

News See all

Read Deep Green to Deploy Compute at Manchester Leisure Center
Deep Green to Deploy Compute at Manchester Leisure Center

Deep Green to Deploy Compute at Manchester Leisure Center

June 26, 2025 Manchester

Deep Green, a company that deploys small data centers close to swimming pools, is planning to deploy 400kW of compute hardware within a 150 sqm (1,614 sq ft) space at the Move Urmston Leisure center in Urmston, southwest of Manchester. It will be the company’s first deployment in the UK’s...

Read more
Read Lunar Digital begins upgrade of the Reynolds House data center
Lunar Digital begins upgrade of the Reynolds House data center

Lunar Digital begins upgrade of the Reynolds House data center

January 19, 2024 Manchester

Lunar Digital began the planned multi-million-pound upgrade of the Reynolds House data center in Manchester, UK. The company started development works across all the data halls at the site, including full renovations of the C5 and C6 data halls to optimize power and cooling, the deployment of new...

Read more
Read Datum has completed a 1 MW data hall upgrade in Farnborough
Datum has completed a 1 MW data hall upgrade in Farnborough

Datum has completed a 1 MW data hall upgrade in Farnborough

July 20, 2023 Datum Datacentres Limited

Datum Datacentres has completed the development of a 1MW data hall at its Farnborough data center. The development project at Datum's FRN1 has been concluded as part of a $9 million investment program. The new data hall on the first floor, Hall 4, has space for 380 racks, a cooling framework...

Read more
Read Plans For Two New Datum Data Centers In The UK
Plans For Two New Datum Data Centers In The UK

Plans For Two New Datum Data Centers In The UK

February 07, 2023 Datum Datacentres Limited

Datum Group, a UK-based data center company, is working on building two new facilities in the country's south and northwest. This week, the firm revealed its intention to establish two new data centers in Farnborough and Manchester in the year 2024. The two new centers (FRN2 and MCR2) will be...

Read more
Read Former Barclays data center to undergo transformation and be brought back into service
Former Barclays data center to undergo transformation and be brought back into service

Former Barclays data center to undergo transformation and be brought back into service

November 10, 2022 Manchester

According to reports, Manchester City Council is looking to redevelop a former Barclays data center from the 1970s and bring it back into service. Currently, the council is looking for public feedback on its regeneration proposals for Wythenshawe town center, having already completed the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.