Cipher Digital: McLennan

Under ConstructionPlanned
Multi-phase construction project
Operated by:

Cipher Digital: McLennan

Site planned for 2028 and has expansions through 2030
Lot Size: 293 acres

Cipher Mining intends to establish cryptocurrency mining operations on a 293-acre property outside Waco, Texas.

Map and Nearby Locations

Waco
Cipher Digital Sites
Nearby Facilities

Cipher Digital: McLennan Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cipher Digital: McLennan

Distance Site About
0.32 miles DataBank Waco ACT1
4.35 miles Lumen Waco 1
9.94 miles Infrakey: Waco Data Center Park
The Waco Data Center Park is a landmark $10 billion digital infrastructure project located on 520 acres in McLennan County, Texas.
11.68 miles Cipher: Riesel, Texas
Cipher Digital’s proposed campus, code-named "McLennan," marks a strategic pivot for the developer from cryptocurrency mining to high-performance computing (HPC) and AI infrastructure.
17.06 miles Station BetaInterested in this information?Contact us
Crypto LLC's next major venture is another site in Texas that will use stranded gas to power mining hardware.
19.91 miles Galaxy Digital: McGregor, TX
Galaxy Digital is developing an artificial intelligence (AI) and high-performance computing (HPC) campus on a 500-acre land parcel located within the McGregor Industrial Park in McLennan County, Texas.

Operating Company

Operated by:

Overview

Cipher Digital (NASDAQ: CIFR), formerly Cipher Mining, is a New York-based developer and operator of large-scale data center campuses in Texas. CEO Tyler Page leads the company. Cipher's footprint spans operational mining facilities (Odessa, Alborz, Bear, Chief) and a deep pipeline of HPC/AI campuses in West Texas including Black Pearl, Barber Lake, Stingray, Reveille, Mikeska, McLennan, Milsing, Ulysses, and the Colchis development.

Strategic pivot to HPC/AI (2026)

On the Q1 2026 earnings call (May 5, 2026), Cipher formally rebranded from Cipher Mining to Cipher Digital, reflecting a strategic shift to hyperscale HPC/AI hosting as the company's forward business. Bitcoin mining at Black Pearl is being wound down to redirect power and land to AI tenants.

Contracted backlog now totals approximately $9.3 billion, anchored by three hyperscale leases:

  • AWS. 15-year lease for 300 MW of HPC capacity.
  • Fluidstack / Google-backed. 10-year lease for 300 MW, with the Barber Lake facility expected to commence operations in September 2026.
  • Third hyperscaler. An additional hyperscale campus lease signed during Q1 2026.

Q1 2026 financials

  • Bitcoin mining revenue: $34.8 million (down from approximately $60 million in Q4 2025) as mining at Black Pearl is wound down.
  • Net loss: $114 million.
  • Funding: Closed a $2 billion high-yield bond for the Black Pearl HPC buildout and a $200 million revolving credit facility.

Capex direction

New capital is flowing fully to HPC/AI buildout. Existing mining capacity is treated as legacy that gets converted to hyperscale colocation as power and infrastructure are redirected to AWS, Fluidstack, and the third hyperscale tenant.

0
Facilities
0
Markets

News See all

Read ServerDomes Global Breaks Ground on 350MW Hueco Ranch Campus Near El Paso
Kaufman & Company and ServerDomes Global broke ground on Oct. 7 on Hueco Ranch, a $15 billion geodesic-dome data center campus near Desert Haven in Hudspeth County, Texas. The campus spans roughly ...

ServerDomes Global Breaks Ground on 350MW Hueco Ranch Campus Near El Paso

October 11, 2026 ServerDomes Global: Hueco Ranch

Kaufman & Company and ServerDomes Global broke ground on Oct. 7 on Hueco Ranch, a $15 billion geodesic-dome data center campus near Desert Haven in Hudspeth County, Texas. The campus spans roughly 24,000 acres and is planned to generate 350 MW, KTSM reported. County officials say no one told...

Read more
Read ThisWay Global Plans 73MW AI and HPC Data Center in Bryan, Texas
ThisWay Global plans a 73MW data center in Bryan, Texas, called the Research and AI Compute Center (RACC). Located at Texas A&M-RELLIS, it will provide AI and HPC resources to eligible researchers,...

ThisWay Global Plans 73MW AI and HPC Data Center in Bryan, Texas

October 10, 2026 Texas

ThisWay Global plans a 73MW data center in Bryan, Texas, called the Research and AI Compute Center (RACC). Located at Texas A&M-RELLIS, it will provide AI and HPC resources to eligible researchers, public-sector organizations, and industry users. The project is planned for a 25-acre site,...

Read more
Read JV Plans 54MW Data Center In Dallas, Texas
A new 54MW data center is planned for the North Dallas Corridor, with Northampton Capital Partners and Provident Data Centers targeting a late 2027 launch. The exact location has not been disclosed...

JV Plans 54MW Data Center In Dallas, Texas

September 07, 2026 Texas

A new 54MW data center is planned for the North Dallas Corridor, with Northampton Capital Partners and Provident Data Centers targeting a late 2027 launch. The exact location has not been disclosed. The companies also agreed to develop additional inference-ready data center sites across US...

Read more
Read Blue Energy, GE Vernova Hitachi Advance 2.5GW Texas Power Plant for Data Center
US nuclear energy company Blue Energy and GE Vernova Hitachi Nuclear Energy have agreed to advance a 2.5GW gas-and-nuclear power plant in Victoria, Texas, to supply a nearby data center. The projec...

Blue Energy, GE Vernova Hitachi Advance 2.5GW Texas Power Plant for Data Center

August 17, 2026 Texas

US nuclear energy company Blue Energy and GE Vernova Hitachi Nuclear Energy have agreed to advance a 2.5GW gas-and-nuclear power plant in Victoria, Texas, to supply a nearby data center. The project will combine GE Vernova gas turbines with BWRX-300 small modular reactors. Blue Energy plans to...

Read more
Read Texas Grid Audit Pauses New Data Center Approvals Across ERCOT
Texas Governor Greg Abbott has ordered an audit of every data center advancing through ERCOT's interconnection process before additional projects can move forward. ERCOT has paused its Batch Zero l...

Texas Grid Audit Pauses New Data Center Approvals Across ERCOT

August 06, 2026 Texas

Texas Governor Greg Abbott has ordered an audit of every data center advancing through ERCOT's interconnection process before additional projects can move forward. ERCOT has paused its Batch Zero large-load review, creating a new schedule risk for developers. The order is serious, but it is not a...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?