The purpose-built building held data rooms with raised floors on its ground and first floors and open-plan offices on the second floor, and served the gas network business that became Cadent. It has since been stripped back to a shell. Leicester City Council certified its lawful use as a data centre in July 2025.

Site History

  • 2025-07: Leicester City Council certified the building's lawful use as a data centre.

Map and Nearby Locations

101 Regent Road
Cadent Sites
Nearby Facilities

Sites within 15 miles of Cadent: Leicester (101 Regent Road)

Distance Site About
1.09 miles iomart DC4 Leicester
The Leicester site has 620 m² (6,696 ft²) space across two data halls.
4.67 miles Santander: Carlton Park DC1
DC1 is the eastern of Santander UK's two data center buildings on the Carlton Park business park at Narborough, south-west of Leicester.
4.82 miles Santander: Carlton Park DC2
The western of Santander UK's two identical data center buildings on the Carlton Park business park at Narborough, south-west of Leicester.
16.16 miles NatWest Group: Kegworth
Former NatWest bank data centre at Packington Hill, Kegworth, opened in the mid-1970s and later run by RBS. The bank closed and sold the site in 2021, and the building is being demolished.
16.31 miles nLighten Edge 6 Rugby
The data center is located in the north of Rugby, close to the M6 motorway and just 30 minutes by car from Birmingham Airport.
17.14 miles Uniper: Nottinghamshire, UK
The planned data center campus at Nottinghamshire's former Ratcliffe-on-Soar power station is a major UK greenfield project, transforming its last coal-fired plant into a massive digital infrastructure hub.
17.47 miles Enterprise Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:

Cadent Gas Ltd is owned by the Quadgas consortium of long-term infrastructure investors, which bought a 61% stake in National Grid's UK gas distribution business in 2017 and the remaining stake in 2019. Based in Coventry, it runs four of Britain's eight regional gas distribution networks and manages more than 82,000 miles of pipes. The business descends from British Gas and Transco and traded as National Grid Gas Distribution before it adopted the Cadent name.

Cadent History:

  • In 2019, National Grid sold its remaining stake in the business to the Quadgas consortium.
  • In May 2017, the network began operating under the Cadent brand.
  • In March 2017, National Grid sold a 61% stake in its gas distribution business to the Quadgas consortium.
  • Founded in 2016 as National Grid Gas Distribution Ltd.
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.