Aventus: Milwaukee (Lakes)

Latest Podcast 7901 W Clinton Ave
OperationalPlannedProspective Expansion
Fully operational facility with future phases planned and prospective expansion planned
Operated by:

Aventus: Milwaukee (Lakes)

Year Built: 2007
Utility Provider: We Energies
Lot Size: 2 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Site History

  • 1974 — Building constructed (masonry, building-in-a-building)
  • ~2007 — Data center operations begin (originally VCPI / Agility Colo)
  • Nov 2022 — Acquired by Aventus Data Centers (division of Vincent Companies)

Project Profile

  • Operator: Aventus Data Centers (division of Vincent Companies)
  • Facility: 26,432 sq ft on 1.53 acres; 4,900 sq ft primary vault (raised floor, hot/cold aisle) plus a 4,000 sq ft air-cooled expansion vault
  • Power: No behind-the-meter generation. Backup: dual full-load diesel generators and dual UPS (concurrent maintenance). 4,000 A underground utility feed from We Energies.
  • Carriers: Lumen (two entrances), AT&T, WIN; four disparate carrier entrances; dark fiber available
  • Certifications: SOC 2 Type 2, HIPAA, FDIC, Wisconsin Act 73
  • Security: fenced perimeter, security gates, tailgate-detection vestibule, video surveillance; automatic FE25 fire suppression
  • Location: Granville Station area, north Milwaukee

Map and Nearby Locations

7901 W Clinton Ave
Aventus Data Centers Sites
Nearby Facilities

Aventus: Milwaukee (Lakes) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aventus: Milwaukee (Lakes)

Distance Site About
4.22 miles Gorman & Company: Milwaukee, WI
Plans to develop a 19,000-square-foot data center within a former Walmart in Milwaukee's Midtown neighborhood have been scrapped following strong community opposition.
7.90 miles Data Holdings Milwaukee
8.53 miles Ethoplex
8.89 miles Vaultas Milwaukee
9.32 miles Netwurx 324 E Wisconsin
9.32 miles 1547: Wells Building
9.33 miles Cogent: 324 E Wisconsin
9.33 miles TSR 324 E Wisconsin
9.36 miles Windstream Brookfield
9.36 miles Windstream Milwaukee
10.11 miles TierPoint Milwaukee-Burnham
10.19 miles Lumen Milwaukee 1
13.08 miles Mapletree: N15 W24250 Riverwood
19.97 miles Expedient Franklin
19.97 miles StratCap: 4777 Ironwood
StratCap’s data center real estate division, StratCap Data Centers, announced today that it completed the acquisition of a 28,500 square foot (2,650 sqm) data center that is fully leased on a triple-net basis located outside Milwaukee in Franklin.

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported on...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?