Arcem: Elverum

Latest Podcast Industrigata 22
Land Bank
Land secured for future development
Operated by:

Arcem: Elverum

Year Planned: 2032
Utility Provider: Elvia
Ownership: Arcem AS owns the building.
Lot Size: 3 acres

Arcem's Industrigata 22 AS owns the former Sperre Støperi foundry site in Elverum and has applied for 99 MW of grid capacity for a data center. Elvia says the connection is feasible but needs new regional grid capacity between Hamar and Elverum and a new transformer station. Zoning work for the data center started in October 2026, and Arcem targets operation by 2032.

Site History

  • October 2026: Zoning work for the data center started.
  • March 2026: Arcem announced the Elverum plan.

Map and Nearby Locations

Industrigata 22
Arcem AS Sites
Nearby Facilities

Arcem: Elverum Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Arcem: Elverum

Distance Site About
9.47 miles Green Mountain: OSL2 DC2
OSL2 DC2 is the second data center building Green Mountain completed for TikTok on its Hamar campus in Heggvin business park, Norway. It is the east building of the north row: three storeys, designed to Tier III.
9.53 miles Green Mountain: OSL2 DC1
OSL2 DC1 is the first data center building Green Mountain completed for TikTok on its Hamar campus in Heggvin business park, Norway. It is the middle building of the north row: three storeys, designed to Tier III.
9.55 miles Green Mountain: OSL2 DC4
OSL2 DC4 is the fourth planned data center building on Green Mountain's Hamar campus in Heggvin business park, Norway, south of DC1. It holds a building permit, and its foundation piles are in place.
9.58 miles Green Mountain: OSL2 DC3
OSL2 DC3 is the third data center building Green Mountain completed for TikTok on its Hamar campus in Heggvin business park, Norway. It is the west building of the north row: three storeys, designed to Tier III.
9.60 miles Green Mountain: OSL2 DC5
OSL2 DC5 is the fifth planned data center building on Green Mountain's Hamar campus in Heggvin business park, Norway, south of DC3. It holds an outline building permit.

Operating Company

Operated by:

Arcem is a Nordic data center development company built on local real estate expertise. Our mission is to advance the next generation of data centers in the Nordic region, with a strong emphasis on green energy solutions.

0
Facilities
0
Markets

News See all

Read Norway Grid Operator Statnett Halts New Data Center Capacity Reservations
Statnett, the state-owned grid operator in [Norway](https://baxtel.com/regions/norway), has temporarily stopped reserving new transmission capacity for data centers. The halt, announced on 9 Novemb...

Norway Grid Operator Statnett Halts New Data Center Capacity Reservations

November 09, 2026 Norway

Statnett, the state-owned grid operator in Norway, has temporarily stopped reserving new transmission capacity for data centers. The halt, announced on 9 November, is expected to be lifted no later than 1 August 2027. It suspends new reservation requests and the processing of new applications for...

Read more
Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Crusoe

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans...

Read more
Read Exascale Labs Partners With EnergyBank On Floating Wind Data Center Pilot In Norway
AI data center developer Exascale Labs has partnered with energy storage firm EnergyBank to explore AI data centers powered by floating offshore wind and long-duration battery storage. Under a non-...

Exascale Labs Partners With EnergyBank On Floating Wind Data Center Pilot In Norway

August 31, 2026 Norway

AI data center developer Exascale Labs has partnered with energy storage firm EnergyBank to explore AI data centers powered by floating offshore wind and long-duration battery storage. Under a non-binding MoU, the companies will develop an initial pilot with Zephyros-One, a 2.3MW floating wind...

Read more
Read Magnora to Launch 1MW Data Center in Oslo, Norway
European data center firm Magnora plans to develop a new facility in Oslo, Norway. Euronext Oslo-listed Magnora Data Center has formed a 50:50 joint venture with Blix Group AS and acquired a commer...

Magnora to Launch 1MW Data Center in Oslo, Norway

August 11, 2026 Norway

European data center firm Magnora plans to develop a new facility in Oslo, Norway. Euronext Oslo-listed Magnora Data Center has formed a 50:50 joint venture with Blix Group AS and acquired a commercial property near Oslo for conversion into an AI data center. The site, formerly used by the...

Read more
Read T1 Energy Gets 50MW Grid Connection for Norway Data Center Site
T1 Energy Gets 50MW Grid Connection for Norway Data Center Site

T1 Energy Gets 50MW Grid Connection for Norway Data Center Site

March 20, 2026 Norway

Battery and solar panel maker T1 Energy has obtained 50MW of capacity for a Norwegian site originally intended for battery cell production, now planned as a data center. The company announced this week that Norway’s national grid operator, Statnett, has allocated 50MW of power to T1 Energy’s...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.