Data Center Campus

Thomson Randall Hunt (Project Azalea)

6 sites Georgia
Planned
Future facility in planning stage
Operated by: Project Turbo LLC

Campus at a Glance

6 data centers on this campus
First built in 2028 with expansions through 2029
Coordinates: 33.45314, -82.39281
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Project Azalea is a $1 billion data center campus situated on 200 acres in McDuffie County Georgia near the city of Thomson. The development consists of six buildings with a total footprint of approximately 1.5 million square feet.

The project is linked to Project Turbo LLC and is designed to support high density computing and cloud services. While located near existing infrastructure the campus will require significant utility upgrades as current supply is insufficient to serve the full project. Site plans include the construction of an on-site substation and a fleet of backup generators. Project Azalea received local approval in March 2026 and is expected to be completed in 2029.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Project Azalea Bldg1 Project Turbo LLC
Planned
— — 2028
Project Azalea Bldg2 Project Turbo LLC
Planned
— — 2028
Project Azalea Bldg3 Project Turbo LLC
Planned
— — 2028
Project Azalea Bldg4 Project Turbo LLC
Planned
— — 2029
Project Azalea Bldg5 Project Turbo LLC
Planned
— — 2029
Project Azalea Bldg6 Project Turbo LLC
Planned
— — 2029

Map and Nearby Locations

Thomson Randall Hunt (Project Azalea) Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by: Project Turbo LLC
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?