The Justified Data Campus is a 750-acre, high-density AI and HPC data center development by TeraWulf Inc. located at the former Century Aluminum smelter in Hawesville, Kentucky.
By repurposing this brownfield site, the project leverages a massive, pre-existing on-site substation to secure substantial, near-term power capacity, bypassing multi-year utility queues to target an accelerated launch by late 2027. Representing a $3.7 billion investment, the campus will feature advanced closed-loop liquid cooling, drastically reducing local resource impact by using less water over several years than the previous smelter consumed in a single day.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| TeraWulf: Justified CB-1 | Terawulf |
Under Construction
|
— | — | 2027 |
| TeraWulf: Justified CB-2 | Terawulf |
Under Construction
|
— | — | 2027 |
| TeraWulf: Justified CB-3 | Terawulf |
Planned
|
— | — | 2028 |
| TeraWulf: Justified CB-4 | Terawulf |
Planned
|
— | — | 2028 |
TeraWulf is a cryptocurrency mining company that prioritizes sustainability by utilizing over 91% zero-carbon energy sources for its Bitcoin mining operations across the United States. TeraWulf aims to revolutionize energy-efficient cryptocurrency mining. By leveraging their expertise in development, engineering, and energy markets, they strive to establish an innovative paradigm that transforms zero-carbon electrons into cryptocurrency in an environmentally responsible manner.