Data Center Campus

Switch: Grand Rapids (The Pyramid Campus)

4 sites Grand Rapids MI
OperationalPlanned
Operational with future phases planned
Operated by:

Campus at a Glance

4 data centers on this campus
First built in 2017 with expansions through 2029
Total building size: 992,035 SqFt
Coordinates: 42.85228, -85.56019
░░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

The Grand Rapids campus is designed for up to 1.8 million square feet of data center space and up to 120 megawatts (MW) of power. It features one of the most unusual data center structures in the country, the Switch Pyramid.

The building was originally built in 1989 to house offices for the Steelcase furniture company. The first phase of construction is an adaptive reuse of the pyramid that will create 225,000 square feet of data center space.

The site has a Foucault pendulum suspended from the ceiling in the main lobby of the massive data center.

Switch acquired the 138-acre pyramid property in late 2017 for $22.2 million, two years after Steelcase sold the property for $4 million.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Switch: Grand Rapids (The Pyramid Campus) Switch
Operational
░░░░ Request Dataset MW 680,035 SqFt 2017
Switch: Grand Rapids 1 Switch
Operational
░░░░ Request Dataset MW 312,000 SqFt 2025
Switch: Grand Rapids 2 Switch
Planned
— — 2028
Switch: Grand Rapids 3 Switch
Planned
— — 2029

Map and Nearby Locations

Switch: Grand Rapids (The Pyramid Campus) Power Growth Over Time

+400% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.

Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?