Data Center Campus
The Conesby Data Centre Campus in Scunthorpe, Lincolnshire, is a pioneering 20-acre co-located development by Rivington Energy designed specifically to support high-density AI and cloud computing workloads.
Strategically positioned next to a multi-phase, 244-acre solar farm, the facility utilizes an energy-efficient, behind-the-meter power architecture paired with sustainability features like low-impact closed-loop cooling systems. The project is expected to take roughly 12 months to construct once formal planning permission is secured from the North Lincolnshire Council.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Rivington Energy: Conesby 1 | Rivington Energy |
Planned
|
— | — | 2028 |
| Rivington Energy: Conesby 2 | Rivington Energy |
Planned
|
— | — | 2029 |