Data Center Campus

Retelit: Corsico Campus

2 sites Milan
Under Construction
New facility under construction
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2027
Coordinates: 45.43533, 9.08921
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

The development consists of two buildings engineered specifically to support liquid-cooled AI server infrastructure. The site protects local resources by using a closed-loop cooling system that prevents groundwater consumption. It operates as an interconnected network facility, routing its waste thermal energy directly into the local municipal heating grid.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Retelit: Corsico DC1 Retelit S.p.A.
Under Construction
— — 2027
Retelit: Corsico DC2 Retelit S.p.A.
Under Construction
— — 2027

Map and Nearby Locations

Retelit: Corsico Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

The company manages fiber infrastructure, network landing stations, and regional data centers across Italy. This proprietary infrastructure is used to supply high-bandwidth connectivity, cybersecurity, and Infrastructure as a Service (IaaS) to corporate clients, public administrations, and telecommunications carriers. Its operations focus on domestic network transport and managed IT infrastructure solutions.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?