Data Center Campus

Popca LLC: Scranton Campus

2 sites Pennsylvania
Planned
Future facility in planning stage
Operated by: Popca LLC

Campus at a Glance

2 data centers on this campus
First built in 2028 with expansions through 2029
Coordinates: 41.4508, -75.71128
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

Popca LLC has filed a proposal to develop a two-building data center campus in Newton Township, Pennsylvania. The project is planned for 76 acres along Newton Road and includes two 145,200 square foot facilities and an on-site substation. Owner Mark Gawron acquired the site from the Lackawanna County Tax Claim Bureau in 2017.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Popca LLC: Scranton Bldg1 Popca LLC
Planned
— — 2028
Popca LLC: Scranton Bldg2 Popca LLC
Planned
— — 2029

Map and Nearby Locations

Popca LLC: Scranton Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by: Popca LLC
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?