Data Center Campus
Lancium's Fort Stockton datacenter, dubbed "Clean Campus," operates at a 25MW capacity. Substations are being built to enable a major expansion to 300MW.
In April 2025, Lancium's patent licensing deal with ERCOT, enhancing grid integration for large, flexible loads, signals plans for a substantial increase in the datacenter's power capacity.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Lancium: Fort Stockton 1 | Lancium |
Operational
|
░░░░ Request Dataset MW | — | 2022 |
| Lancium: Fort Stockton Expansion | Lancium |
Planned
|
— | — | — |