Lambda: Red Clay Campus

Lambda plans a major AI data center campus in Lowndes County, Alabama, taking over Cloverleaf Infrastructure's Project Red Clay development near Montgomery, with construction targeted for early 2027.

4 sites Alabama
Planned
Future facility in planning stage
Developed by:

Campus at a Glance

4 data centers on this campus
First built in 2027 with expansions through 2029
Coordinates: 32.27064, -86.51237
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░░░ Request Dataset MW
Planned

Red Clay Technology Center is a proposed hyperscale AI data center campus near Burkville in Lowndes County, Alabama. Initially developed as Project Red Clay by Cloverleaf Infrastructure, the campus was announced in November 2026 as a future Lambda development. An earlier site plan envisioned four large data center buildings, a warehouse and an office building. The campus is intended to receive electricity from Alabama Power and incorporate closed-loop cooling systems to reduce water consumption. Construction is expected to begin in early 2027, with the development proceeding in phases over several years.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Lambda: Red Clay Building 1 Lambda
Planned
— — 2027
Lambda: Red Clay Bldg 2 Lambda
Planned
— — 2029
Lambda: Red Clay Bldg 3 Lambda
Planned
— — 2029
Lambda: Red Clay Bldg 4 Lambda
Planned
— — 2029

Map and Nearby Locations

Lambda: Red Clay Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction