Data Center Campus

ILI Group: Cato Campus

7 sites Scotland
Planned
Future facility in planning stage
Operated by:

Campus at a Glance

7 data centers on this campus
First built in 2028 with expansions through 2036
Coordinates: 56.10653, -3.27709
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Renewable energy developer ILI Group has submitted planning applications for Cato, a state-of-the-art, AI-focused data center campus in Fife, Scotland. Named after the Stoic philosopher, the facility is the flagship project within a planned network across Scotland collectively dubbed "The Stoics." The 25-hectare development represents a £5 billion ($6.71bn) investment and is designed to feature multiple buildings alongside an on-site substation.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
ILI Group: Cato 1 ILI Group
Planned
— — 2028
ILI Group: Cato 2 ILI Group
Planned
— — 2029
ILI Group: Cato 3 ILI Group
Planned
— — 2031
ILI Group: Cato 4 ILI Group
Planned
— — 2032
ILI Group: Cato 5 ILI Group
Planned
— — 2034
ILI Group: Cato 6 ILI Group
Planned
— — 2035
ILI Group: Cato 7 ILI Group
Planned
— — 2036

Map and Nearby Locations

ILI Group: Cato Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Intelligent Land Investments Group (ILI Group) works primarily in the Renewable energy and Energy Storage markets.

ILI Group has aligned itself with Government policy and plans to bring 2GW of Pumped Storage Hydro and over 1GW of utility scale battery storage to the market.