Data Center Campus
Hut 8 is developing the Beacon Point AI data center campus on about 525 acres near Robstown in Nueces County, Texas.
The campus has two phases. Each phase is an AI factory designed to NVIDIA's DSX reference architecture. A single high-investment-grade tenant has leased both phases for 15 years.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Hut 8: Beacon Point 1 | Hut 8 Corp |
Under ConstructionProspective Expansion
|
— | — | 2027 |
| Hut 8: Beacon Point 2 | Hut 8 Corp |
Planned
|
— | — | 2028 |
Hut 8 is one of North America's oldest, largest and most innovative digital asset miners in the world. Hut has one of the highest installed capacity rates in the industry and is the largest holder of self-mined Bitcoin of publicly traded companies globally.