Data Center Campus

Google: Teesworks Campus

2 sites England
Planned
Future facility in planning stage
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2028 with expansions through 2028
Coordinates: 54.62146, -1.12899
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

A large data center is set for Teesside, UK, after receiving outline planning permission from the Redcar and Cleveland Council. The approval comes despite objections from BP, which claims the project will obstruct its plans for a nearby hydrogen plant.

The proposed 500,000-square-meter campus is a project by Teesworks Ltd, the public-private partnership transforming a 4,500-acre former steelworks site into Europe’s largest brownfield regeneration project. Tech giant Google is reportedly in talks to occupy the development, which is planned to include six two-story data halls. While this initial permit is a major milestone, a detailed "reserved matters" application is still required before construction begins.

BP’s competing interest for the site involves H2 Teesside, a blue hydrogen plant. This technology produces fuel from natural gas while capturing carbon emissions, classifying it as a low-carbon energy source.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Metro PlazaInterested in this information?Contact us Google
Planned
— — 2028
Plaza MaxInterested in this information?Contact us Google
Planned
— — —

Map and Nearby Locations

Google: Teesworks Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?