Data Center Campus
Critical to London’s Financial industry, Equinix’s collection of non-contigous data centers in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in greater London metro.
Equinix's LD4, LD5, LD6, and LD10 datacenters in Slough are configured as a campus that provides more than 408,000 square feet (38,000 square meters) of data center floor space. The campus is located on the Slough Trading Estate which is owned by SERGO. Equinix has entered into a long-term ground lease with SERGO which gives Equinix control of the property until at least the 2060s. In February 2017, Equinix acquired LD10 from IO Data Centers.
Equinix's Slough campus is a key financial trading hub where Exchanges, matching engines and trading firms colocate to participate in ultra low latency electronic trading (FX).
At the time of the launch, Equinix said that LD6 was the first UK data centre to be Gold Accredited for energy efficiency by LEED (Leadership in Energy & Environmental Design.) Equinix publishes a PUE of 1.4 for LD6.
In November 2018, Equinix announced it was building LD7 in Slough. The $130 million data centre will open in Q2 2019 and will be connected to the rest of Equinix's Slough buildings.
Formerly known as IO Slough, Equinix acquired the site in February 2017 from IO Data Centers and renamed the site to LD10. Goldman Sachs was IO's first major tenant in 2015 and is presumed to be still deployed.
LD10 has 12,800 sqft of office space.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| Equinix LD4 | Equinix |
Operational
|
░░░░ Request Dataset MW | — | 2007 |
| Equinix LD5 | Equinix |
Operational
|
░░░░ Request Dataset MW | — | 2010 |
| Equinix LD6 | Equinix |
Operational
|
░░░░ Request Dataset MW | 172,000 SqFt | 2015 |
| Equinix LD13x | Equinix |
Operational
|
░░░░ Request Dataset MW | — | 2019 |
| Equinix LD7 | Equinix |
Operational
|
░░░ Request Dataset MW | — | 2019 |
| Equinix LD12 | Equinix |
Under Construction
|
— | — | 2026 |
| Equinix LD10 | Equinix |
OperationalPlanned
|
░░░ Request Dataset MW | 112,000 SqFt | — |