5 data centers on this campus
First built in 2027 with expansions through 2028
Coordinates: 38.98908, -8.96173
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Real estate firm Merlin Properties and data center company Edged Energy has started construction of a new campus in Lisbon, Portugal. The campus will be constructed in phases with the first of five facilities expected to come online in 2027.

  • MERLIN Edged Lisbon AI Campus is officially designated OCP Ready™ for hyperscalers by the Open Compute Project Foundation!

Lisbon Campus Features:


  • Five buildings planned
  • New build; three stories, concrete slab, precast concrete structure; two loading dock bays
  • 24 x 7 x 365 access; 2 meet-me rooms
  • Multiple fiber providers; three diverse points of entry
  • Tier III design concurrently maintainable
  • 100% uptime SLA

Power:


  • Battery backup supporting all electrical and mechanical systems
  • UPS with N+1 redundancy
  • Generators with N+1 redundancy
  • Standby generation systems utilize Tier 4 Final engines which reduce NOx and particulate matter emissions by up to 99%
  • Redundant A+B side distribution
  • Revenue-grade, transparent, real-time metering

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Edged Energy: LIS01 Edged Energy
Under Construction
— — 2027
Edged Energy: LIS02 Edged Energy
Under Construction
— — 2027
Edged Energy: LIS03 Edged Energy
Planned
— — 2028
Edged Energy: LIS04 Edged Energy
Planned
— — 2028
Edged Energy: LIS05 Edged Energy
Planned
— — 2028

Map and Nearby Locations

Edged Energy: Lisbon Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Edged Energy is a colocation and data center provider. The company also has data centers in development across the US.

Its Spain business is a subsidiary of Endeavour in collaboration with Merlin Properties.

0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?