Data Center Campus

DartPoints: Baton Rouge Campus

2 sites Baton Rouge
Operational
Fully operational facility
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2001
Total building size: 74,000 SqFt
Coordinates: 30.45368, -91.11611
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

The Baton Rouge 1 Data Center has been operational for over 15 years, providing continuous service without reported outages. The facility encompasses 18,433 square feet of data center space. Its location is intended to provide local access, and its infrastructure is designed to support enterprise-level reliability, including provisions for space, power, and network connectivity for critical infrastructure.

  • Baton Rouge BTR1 was previously operated by Louisiana firm Venyu.
  • US data center operator DartPoints acquired Venyu in 2023, taking over three facilities in the southern state.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
DartPoints: Baton Rouge BTR1 DartPoints
Operational
░░░ Request Dataset MW 47,000 SqFt 2001
DartPoints: Baton Rouge BTR2 DartPoints
Operational
░░░ Request Dataset MW 27,000 SqFt 2014

Map and Nearby Locations

DartPoints: Baton Rouge Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

DartPoints is based in Dallas, Texas and is majority owned by NOVA Infrastructure following an April 2025 transaction in which Astra Capital Management retained a minority stake. The company operates 11 data centers across 10 US markets in the five states listed above. Scale disclosed in 2023 included more than 325,000 square feet of data center space and 20 MW of power capacity. Services include retail colocation, cloud, and managed services.

History:

  • 2025 Apr: NOVA Infrastructure completed a majority investment in DartPoints; Astra Capital Management retained a minority stake.
  • 2023 May: Acquired Venyu, adding three data centers in Louisiana.
  • 2021 Mar: Announced the acquisition of Immedion, adding eight data centers across South Carolina, North Carolina, Ohio, and Indiana.
0
Facilities
0
Markets
0MW
Megawatts

Documents

Ready to Level up Your
Data Center Strategy?