Data Center Campus

Crusoe: Warrenton Campus

2 sites St Louis
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Campus at a Glance

2 data centers on this campus
First built in 2027 with expansions through 2029
Coordinates: 38.82514, -91.17998
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

Crusoe is developing a 340-acre data center campus in Warrenton, Missouri, consisting of two 805,000-square-foot buildings and a 40,000-square-foot administrative facility. Following the early 2026 approval of its site plan and conditional use permits, the company secured a 75% personal property tax abatement from the city in April 2026.

With an estimated $8.36 billion being spent on high-performance computing equipment, construction is scheduled to support an initial operational date in late 2027, with the full campus build-out expected by 2029.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Crusoe: Warrenton Bldg1 Crusoe
Under Construction
— — 2027
Crusoe: Warrenton Bldg2 Crusoe
Planned
— — 2029

Map and Nearby Locations

Crusoe: Warrenton Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Operating Company

Operated by:

Crusoe is a privately held AI infrastructure developer and GPU cloud provider that builds AI data center campuses and offers GPU cloud services in the United States. The company began as Crusoe Energy Systems, a flare mitigation provider that powered onsite computing from stranded natural gas, with bitcoin mining as an early use case.

Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings.

For this project, it is reported that Crusoe’s direct customer is Oracle and that OpenAI is Oracle’s customer; the Abilene campus is tied to OpenAI’s Stargate program;

OpenAI later announced an additional 4.5 GW Stargate partnership with Oracle that references the Abilene Stargate I site. Crusoe also expanded in-house manufacturing capability through the acquisition of Easter-Owens Electric in 2022.

Crusoe History:

  • In July 2025 announced a 1.8 GW AI data center campus with Tallgrass near Cheyenne, Wyoming.
  • In May, 2025, secured $11.6 billion in debt and equity to expand the Abilene, Texas campus to eight buildings, with Crusoe noting Oracle as the direct customer and OpenAI as Oracle’s customer for the site.
  • In March 2025 began construction on the second phase of the Abilene, Texas campus to bring total planned capacity to 1.2 GW.
  • In April 2022 raised Series C financing that included plans to launch the CrusoeCloud platform for high performance computing.
  • In June 2022 acquired Easter-Owens Electric to vertically integrate modular data center manufacturing.
  • Founded in 2018 as Crusoe Energy Systems to mitigate gas flaring by powering onsite computing, including bitcoin mining.
0
Facilities
0
Markets

Ready to Level up Your
Data Center Strategy?