Data Center Campus

Crusoe: Goodnight Campus (Project Llano)

6 sites West Texas
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Campus at a Glance

6 data centers on this campus
First built in 2026 with expansions through 2028
Coordinates: 35.0189, -101.30625
░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The Armstrong County AI Data Center project, spearheaded by Crusoe Energy, has been redesigned from its original plan. The original 3.5 million-square-foot, seven-building complex will now consist of six buildings. Furthermore, site work is already underway on four pads. This revised plan specifies two smaller "Abilene-type" hyperscale structures, each measuring 484,954 square feet. The scope is rounded out by four substantially larger, rectangular "warehouse-style" buildings, each 805,380 square feet, designed to support roughly double the capacity of the smaller modules.

The new deal keeps the county’s total 10-year abatement value intact but shifts payments to $1.35 million per year for each building as soon as it becomes operational, with the first check possible by June or July 2026.

Crusoe spokesman Tyler Hunt told the court that construction on the four buildings should be finished within two years and that the company is in active negotiations with a prospective tenant, aiming to lease the entire campus to a single user.

The site will rely on the ERCOT grid, supplemented by the 265.5 MW Goodnight Wind Farm (already operating in Armstrong County) through a renewable-energy purchase agreement.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Crusoe: Goodnight 1 Crusoe
Under Construction
— — 2026
Crusoe: Goodnight 2 Crusoe
Under Construction
— — 2026
Crusoe: Goodnight 3 Crusoe
Under Construction
— — 2027
Crusoe: Goodnight 4 Crusoe
Under Construction
— — 2027
Crusoe: Goodnight 5 Crusoe
Planned
— — 2028
Crusoe: Goodnight 6 Crusoe
Planned
— — 2028

Map and Nearby Locations

Crusoe: Goodnight Campus (Project Llano) Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Crusoe is a privately held AI infrastructure developer and GPU cloud provider that builds AI data center campuses and offers GPU cloud services in the United States. The company began as Crusoe Energy Systems, a flare mitigation provider that powered onsite computing from stranded natural gas, with bitcoin mining as an early use case.

Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings.

For this project, it is reported that Crusoe’s direct customer is Oracle and that OpenAI is Oracle’s customer; the Abilene campus is tied to OpenAI’s Stargate program;

OpenAI later announced an additional 4.5 GW Stargate partnership with Oracle that references the Abilene Stargate I site. Crusoe also expanded in-house manufacturing capability through the acquisition of Easter-Owens Electric in 2022.

Crusoe History:

  • In July 2025 announced a 1.8 GW AI data center campus with Tallgrass near Cheyenne, Wyoming.
  • In May, 2025, secured $11.6 billion in debt and equity to expand the Abilene, Texas campus to eight buildings, with Crusoe noting Oracle as the direct customer and OpenAI as Oracle’s customer for the site.
  • In March 2025 began construction on the second phase of the Abilene, Texas campus to bring total planned capacity to 1.2 GW.
  • In April 2022 raised Series C financing that included plans to launch the CrusoeCloud platform for high performance computing.
  • In June 2022 acquired Easter-Owens Electric to vertically integrate modular data center manufacturing.
  • Founded in 2018 as Crusoe Energy Systems to mitigate gas flaring by powering onsite computing, including bitcoin mining.