Data Center Campus
The China Telecom Hangzhou Big Data Center spans 168.2 mu, with over 230,000 square meters of built space. The facility can house 20,000 cabinets with 8kW power capacity each, helping address Hangzhou's shortage of IDC (Internet Data Center) resources. Huaxin secured the Phase 1 EPC (Engineering, Procurement, and Construction) contract valued at 760 million yuan. This first phase encompasses 147,000 square meters and includes the construction of four data center buildings, one power center, one operations control center, and one 110kV electrical substation.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| China Telecom: Hangzhou 5 | China Telecom |
Under ConstructionOperational
|
░░░░ Request Dataset MW | — | 2021 |
| China Telecom: Hangzhou 1 | China Telecom |
Operational
|
░░░░ Request Dataset MW | 340,000 SqFt | 2023 |
| China Telecom: Hangzhou 2 | China Telecom |
Operational
|
░░░░ Request Dataset MW | 340,000 SqFt | 2023 |
| China Telecom: Hangzhou 3 | China Telecom |
Operational
|
░░░░ Request Dataset MW | 440,000 SqFt | 2024 |
| China Telecom: Hangzhou 4 | China Telecom |
Operational
|
░░░░ Request Dataset MW | 440,000 SqFt | 2024 |
| China Telecom: Hangzhou 6 | China Telecom |
Operational
|
░░░░ Request Dataset MW | 440,000 SqFt | 2025 |