Data Center Campus

Chayora Tianjin Campus

7 sites Beijing
OperationalUnder ConstructionPlanned
Operational facility with ongoing expansion and future phases planned
Operated by:

Campus at a Glance

7 data centers on this campus
First built in 2020 with expansions through 2029
Total building size: 411,800 SqFt
Coordinates: 39.30857, 117.18502
░░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

The Chayora Tianjin Data Center Campus, launched October 2020, is China's first data center with full Uptime Institute Tier III certification for design, facility and operations.

The development has gained additional significance through a strategic partnership with EdgeConneX, a leading provider of edge and hyperscale data centers. Following EdgeConneX's strategic investment in Chayora, both companies will collaborate to deliver services from Chayora's existing Chinese data centers, with plans to expand their presence across mainland China.

Tianjin TJ1 Overview


  • Three story building – 38,258m2 total
  • Phase 1 – 15,586m2
  • Phase 2 – 22,672m2
  • Phase 1: 2 x 1,000m2 data halls (500 52U racks per hall) on stream
  • Phase 2: 2,000 racks available in an additional 4 x 1,000m2 technical white- space data halls
  • Office areas total gross 4,250m2 to be reserved in Phase 1

Power

  • Distributed redundant N+1 or 2N primary power
  • DR N+1 / 2N UPS – 15 Minute full load battery back up
  • N+1 generators – 24-hour full load on-site fuel capacity with 2 fuel supply contracts
  • 4 x 10 kV Power from different sub- stations
  • Power monitoring at the individual rack level

Networks


  • Carrier neutral, connectivity options with major carriers
  • Connectivity options to multiple cloud platforms
  • Diverse fiber entry to campus and buildings
  • Redundant carrier rooms, and redundant meet-me rooms (MMR) per floor
  • Fully redundant in-house wiring
  • <1.5ms round trip delay to Beijing CBD (route dependent)

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Chayora: TJ1 Chayora
Operational
░░░░ Request Dataset MW 411,800 SqFt 2020
Chayora: TJ2 Chayora
Under Construction
— — 2026
Chayora: TJ3 Chayora
Planned
— — 2027
Chayora: TJ4 Chayora
Planned
— — 2027
Chayora: TJ5 Chayora
Planned
— — 2028
Chayora: TJ7 Chayora
Planned
— — 2028
Chayora: TJ6 Chayora
Planned
— — 2029

Map and Nearby Locations

Chayora Tianjin Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Operating Company

Operated by:

Chayora is developing hyperscale data centre sites in key cities across China.