Data Center Campus
CDC operates two campuses in Hume. Hume Campus Two represents two data center buildings, Hume 4 & Hume 5. Hume 4 is the first building of the campus with Tier 4 specification.
Buildings
| Site | Operator | Status | Operational | Building Size | Built |
|---|---|---|---|---|---|
| CDC: Hume 4 | Canberra Data Centres (CDC) |
Operational
|
░░░░ Request Dataset MW | 150,000 SqFt | 2020 |
| CDC: Hume 5 | Canberra Data Centres (CDC) |
Operational
|
░░░░ Request Dataset MW | 170,000 SqFt | 2023 |